Date: 25 January 2002
Number: 02/02
BHP Billiton Production Report for the Quarter
Ended 31 December 2001
BHP Billiton today released its production report for the quarter ended 31 December 2001. The results demonstrate a solid operational performance, particularly from the iron ore and petroleum assets, and the contribution from new copper, metallurgical coal, petroleum and alumina operations.
The production figures also reflect BHP Billiton's international resource management strategy, including the decision to temporarily reduce copper production by an estimated 170,000 tonnes per annum.
Increased production was also recorded at the Bruce and Keith fields (UK) during the December 2001 quarter due to increased customer demand. In addition, Typhoon (USA) reported higher production during the December 2001 quarter following the ramp-up of first production from the deepwater Gulf of Mexico asset (commenced operations in July 2001). Higher production was recorded at the Wanaea/Cossack fields (Australia) during the December 2001 quarter following planned maintenance in the previous quarter.
During January 2002, BHP Billiton commenced the temporary curtailment of production at its Tintaya (Peru) operations and closed its remaining in-situ leaching operations at San Manuel (USA) as part of its international copper resource management strategy. At the time of the announcements Tintaya was producing 90,000 tonnes per annum of copper, while San Manuel was producing 9,000 tonnes per annum of copper cathode.
Lower production, compared to the December 2000 quarter, follows the equalisation of Queensland (Australia) coal interests with Mitsubishi to form the BHP Billiton Mitsubishi Alliance in March 2001. Production at the Gregory Joint Venture (Australia) during the half year was impacted by adverse roof conditions encountered at the Crinum mine between August and December.
****
Further news and information can be found on our Internet site: www.bhpbilliton.com
Australia
BHP BILLITON PRODUCTION SUMMARY |
|
|
|
|
|
|
|
|||||
QUARTER ENDED |
HALF YEAR ENDED |
% CHANGE |
||||||||||
DEC Q01 |
DEC Q01 |
YTD 01 |
||||||||||
DEC |
SEPT |
DEC |
DEC |
DEC |
vs |
vs |
vs |
|||||
|
|
|
2000 |
2001 |
2001 |
|
2001 |
2000 |
|
DEC Q00 |
SEPT Q01 |
YTD 00 |
ALUMINIUM |
||||||||||||
Alumina |
('000 tonnes) |
533 |
964 |
965 |
1,929 |
1,072 |
81% |
0% |
80% |
|||
Aluminium |
('000 tonnes) |
251 |
244 |
235 |
479 |
484 |
-6% |
-4% |
-1% |
|||
BASE METALS |
||||||||||||
Copper |
('000 tonnes) |
271.6 |
202.1 |
221.6 |
423.6 |
483.7 |
-18% |
10% |
-12% |
|||
Lead |
(tonnes) |
51,104 |
54,032 |
53,212 |
107,244 |
104,047 |
4% |
-2% |
3% |
|||
Zinc |
(tonnes) |
33,804 |
29,402 |
46,719 |
76,122 |
63,315 |
38% |
59% |
20% |
|||
Gold |
(ounces) |
186,314 |
69,682 |
74,162 |
143,844 |
361,353 |
-60% |
6% |
-60% |
|||
Silver |
('000 ounces) |
8,060 |
8,183 |
9,281 |
17,464 |
16,135 |
15% |
13% |
8% |
|||
Molybdenum |
('000 tonnes) |
0.1 |
0.2 |
0.2 |
0.3 |
0.1 |
12% |
1% |
123% |
|||
CARBON STEEL MATERIALS |
||||||||||||
Iron ore |
('000 tonnes) |
16,230 |
17,080 |
17,283 |
34,363 |
33,510 |
6% |
1% |
3% |
|||
Metallurgical coal |
('000 tonnes) |
8,877 |
9,035 |
8,149 |
17,184 |
16,841 |
-8% |
-10% |
2% |
|||
Manganese ores |
('000 tonnes) |
897 |
973 |
888 |
1,860 |
1,921 |
-1% |
-9% |
-3% |
|||
Manganese alloys |
('000 tonnes) |
173 |
119 |
165 |
284 |
348 |
-5% |
39% |
-18% |
|||
Hot briquetted iron |
('000 tonnes) |
291 |
386 |
384 |
770 |
396 |
32% |
0% |
95% |
|||
STAINLESS STEEL MATERIALS |
||||||||||||
Nickel |
('000 tonnes) |
14.4 |
15.9 |
17.5 |
33.4 |
27.2 |
22% |
10% |
23% |
|||
Chrome ores |
('000 tonnes) |
898 |
629 |
609 |
1,238 |
1,819 |
-32% |
-3% |
-32% |
|||
Ferrochrome |
('000 tonnes) |
249 |
207 |
206 |
413 |
522 |
-17% |
0% |
-21% |
|||
ENERGY COAL |
('000 tonnes) |
25,821 |
22,405 |
20,623 |
43,028 |
46,663 |
-20% |
-8% |
-8% |
|||
PETROLEUM |
||||||||||||
Crude oil and condensate |
('000 bbl) |
20,000 |
19,492 |
19,747 |
39,239 |
40,817 |
-1% |
1% |
-4% |
|||
Natural gas |
(bcf) |
60.83 |
71.24 |
76.23 |
147.47 |
122.58 |
25% |
7% |
20% |
|||
LPG |
('000 tonnes) |
155.04 |
182.71 |
173.01 |
355.72 |
327.81 |
12% |
-5% |
9% |
|||
Ethane |
('000 tonnes) |
9.98 |
24.05 |
18.59 |
42.64 |
33.17 |
86% |
-23% |
29% |
|||
BHP STEEL |
||||||||||||
Raw steel |
('000 tonnes) |
1,372 |
1,382 |
1,262 |
2,644 |
2,827 |
-8% |
-9% |
-6% |
|||
Marketable steel products |
('000 tonnes) |
1,268 |
1,377 |
1,169 |
2,546 |
2,693 |
-8% |
-15% |
-5% |
|||
EXPLOR'N, TECH & NEW BUS |
||||||||||||
Diamonds |
('000 carats) |
318 |
767 |
928 |
1,695 |
627 |
192% |
21% |
170% |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
BHP BILLITON ATTRIBUTABLE PRODUCTION |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
BHP Billiton |
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
|||
|
|
Interest |
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
ALUMINIUM |
|
|||||||||
ALUMINA |
||||||||||
Production ('000 tonnes) |
||||||||||
Worsley (a) |
86% |
211 |
541 |
674 |
662 |
671 |
1,333 |
417 |
||
Suriname |
45% |
215 |
213 |
211 |
219 |
209 |
428 |
428 |
||
Alumar |
36% |
107 |
114 |
113 |
83 |
85 |
168 |
227 |
||
Total |
533 |
868 |
998 |
964 |
965 |
1,929 |
1,072 |
|||
|
|
|
|
|
|
|
|
|
|
|
ALUMINIUM |
||||||||||
Production ('000 tonnes) |
||||||||||
Hillside |
100% |
127 |
122 |
123 |
125 |
117 |
242 |
253 |
||
Bayside |
100% |
45 |
44 |
43 |
44 |
45 |
89 |
91 |
||
Alumar |
46.3% |
44 |
42 |
43 |
35 |
32 |
67 |
87 |
||
Valesul |
45.5% |
12 |
11 |
9 |
8 |
9 |
17 |
23 |
||
Mozal (b) |
47% |
23 |
31 |
32 |
32 |
32 |
64 |
30 |
||
Total |
251 |
250 |
250 |
244 |
235 |
479 |
484 |
|||
|
|
|
|
|
|
|
|
|
|
|
BASE METALS (c) |
|
|||||||||
COPPER |
||||||||||
Payable metal ('000 tonnes) |
||||||||||
Escondida |
57.5% |
105.8 |
98.3 |
89.1 |
89.3 |
80.1 |
169.5 |
215.3 |
||
Ok Tedi (d) |
52% |
54.1 |
51.7 |
53.4 |
- |
- |
- |
103.9 |
||
Tintaya |
100% |
24.0 |
18.4 |
20.1 |
20.9 |
22.9 |
43.8 |
46.5 |
||
Antamina (e) |
33.8% |
- |
- |
- |
- |
26.5 |
26.5 |
- |
||
Alumbrera (e) |
25% |
9.9 |
10.8 |
11.9 |
11.6 |
12.0 |
23.6 |
9.9 |
||
Highland Valley (e) |
33.6% |
16.1 |
14.8 |
14.1 |
16.1 |
16.0 |
32.1 |
16.1 |
||
Selbaie |
100% |
3.2 |
3.3 |
2.9 |
2.5 |
2.7 |
5.1 |
6.6 |
||
Total |
213.1 |
197.2 |
191.5 |
140.4 |
160.2 |
300.6 |
398.3 |
|||
Refined production ('000 tonnes) |
||||||||||
Escondida |
57.5% |
20.5 |
21.0 |
22.0 |
21.9 |
21.9 |
43.8 |
40.4 |
||
Cerro Colorado (e) |
100% |
31.0 |
32.0 |
33.8 |
34.0 |
33.8 |
67.8 |
31.0 |
||
San Manuel |
100% |
2.6 |
2.5 |
2.3 |
2.3 |
2.2 |
4.5 |
5.4 |
||
Pinto Valley |
100% |
4.4 |
3.9 |
3.8 |
3.4 |
3.4 |
6.8 |
8.7 |
||
Total |
58.5 |
59.4 |
62.0 |
61.6 |
61.4 |
123.0 |
85.4 |
|||
|
|
|
|
|
|
|
|
|
|
|
LEAD |
||||||||||
Payable metal (tonnes) |
||||||||||
Cannington |
100% |
49,503 |
45,228 |
54,271 |
52,879 |
51,914 |
104,793 |
100,830 |
||
Pering |
100% |
1,601 |
1,320 |
1,486 |
1,153 |
1,298 |
2,451 |
3,217 |
||
Total |
51,104 |
46,548 |
55,757 |
54,032 |
53,212 |
107,244 |
104,047 |
|||
|
|
|
|
|
|
|
|
|
|
|
ZINC |
||||||||||
Payable metal (tonnes) |
||||||||||
Cannington |
100% |
17,994 |
15,877 |
17,176 |
14,058 |
17,285 |
31,343 |
31,141 |
||
Antamina (e) |
33.8% |
- |
- |
- |
- |
16,010 |
16,010 |
- |
||
Selbaie |
100% |
10,312 |
8,868 |
7,969 |
9,456 |
8,106 |
17,562 |
21,671 |
||
Pering |
100% |
5,498 |
5,010 |
5,397 |
5,888 |
5,318 |
11,206 |
10,503 |
||
Total |
33,804 |
29,755 |
30,542 |
29,402 |
46,719 |
76,122 |
63,315 |
|||
|
|
|
|
|
|
|
|
|
|
|
BASE METALS (continued) |
|
|||||||||
GOLD |
||||||||||
Payable concentrate (ounces) |
||||||||||
Ok Tedi (d) |
52% |
127,049 |
115,576 |
124,729 |
- |
- |
- |
267,797 |
||
Escondida |
57.5% |
13,270 |
10,582 |
10,302 |
10,641 |
12,166 |
22,807 |
28,713 |
||
Tintaya |
100% |
4,638 |
5,146 |
7,693 |
10,249 |
11,500 |
21,749 |
11,585 |
||
Alumbrera (e) |
25% |
32,013 |
31,947 |
42,205 |
42,584 |
45,567 |
88,151 |
32,013 |
||
Selbaie |
100% |
9,344 |
8,472 |
8,198 |
6,207 |
4,929 |
11,136 |
21,245 |
||
Total |
186,314 |
171,723 |
193,126 |
69,682 |
74,162 |
143,844 |
361,353 |
|||
|
|
|
|
|
|
|
|
|
|
|
SILVER |
||||||||||
Payable metal ('000 ounces) |
||||||||||
Cannington |
100% |
7,591 |
6,462 |
7,806 |
7,804 |
7,915 |
15,719 |
15,220 |
||
Antamina (e) |
33.8% |
- |
- |
- |
- |
690 |
690 |
- |
||
Selbaie |
100% |
469 |
362 |
259 |
379 |
676 |
1,055 |
915 |
||
Total |
8,060 |
6,824 |
8,065 |
8,183 |
9,281 |
17,464 |
16,135 |
|||
|
|
|
|
|
|
|
|
|
|
|
MOLYBDENUM |
||||||||||
Payable metal ('000 tonnes) |
||||||||||
Highland Valley (e) |
33.6% |
0.14 |
0.12 |
0.12 |
0.15 |
0.15 |
0.30 |
0.14 |
||
|
|
|
|
|
|
|
|
|
|
|
CARBON STEEL MATERIALS |
|
|||||||||
IRON ORE |
||||||||||
Production ('000 tonnes) |
||||||||||
Mt Newman Joint Venture |
85% |
5,500 |
4,591 |
5,239 |
5,973 |
6,423 |
12,396 |
11,120 |
||
Goldsworthy Joint Venture |
85% |
1,730 |
1,453 |
1,788 |
1,656 |
1,667 |
3,323 |
3,360 |
||
Yandi Joint Venture |
85% |
5,840 |
6,354 |
6,882 |
7,046 |
6,933 |
13,979 |
12,920 |
||
Jimblebar |
100% |
1,250 |
991 |
1,272 |
1,182 |
1,332 |
2,514 |
2,380 |
||
Samarco |
50% |
1,910 |
1,885 |
1,893 |
1,223 |
928 |
2,151 |
3,730 |
||
Total |
16,230 |
15,274 |
17,074 |
17,080 |
17,283 |
34,363 |
33,510 |
|||
|
|
|
|
|
|
|
|
|
|
|
METALLURGICAL COAL (f) |
||||||||||
Production ('000 tonnes) |
||||||||||
CQCA Joint Venture (g) |
50% |
3,794 |
3,519 |
4,064 |
4,002 |
3,908 |
7,910 |
7,755 |
||
South Blackwater (h) |
50% |
- |
- |
- |
670 |
524 |
1,194 |
- |
||
Gregory Joint Venture (g) |
50% |
970 |
845 |
960 |
486 |
408 |
894 |
1,821 |
||
BHP Mitsui Coal (i) |
80% |
1,525 |
1,678 |
1,802 |
1,823 |
1,467 |
3,290 |
2,939 |
||
QCT Resources (j) |
50% |
1,260 |
1,837 |
2,087 |
- |
- |
- |
1,260 |
||
Illawarra |
100% |
1,328 |
1,619 |
1,889 |
2,055 |
1,841 |
3,896 |
3,066 |
||
Total |
8,877 |
9,498 |
10,802 |
9,035 |
8,149 |
17,184 |
16,841 |
|||
|
|
|
|
|
|
|
|
|
|
|
MANGANESE ORES |
||||||||||
Saleable production ('000 tonnes) |
||||||||||
South Africa (k) |
60% |
579 |
538 |
490 |
467 |
501 |
968 |
1,134 |
||
Australia (k) |
60% |
318 |
379 |
446 |
505 |
387 |
892 |
787 |
||
Total |
897 |
917 |
936 |
973 |
888 |
1,860 |
1,921 |
|||
|
|
|
|
|
|
|
|
|
|
|
CARBON STEEL MATERIALS (cont'd) |
||||||||||
MANGANESE ALLOYS |
||||||||||
Saleable production ('000 tonnes) |
||||||||||
South Africa (k) |
60% |
106 |
96 |
85 |
69 |
101 |
170 |
217 |
||
Australia (k) |
60% |
67 |
64 |
51 |
50 |
63 |
113 |
131 |
||
Total |
173 |
160 |
136 |
119 |
165 |
284 |
348 |
|||
|
|
|
|
|
|
|
|
|
|
|
HOT BRIQUETTED IRON |
||||||||||
Production ('000 tonnes) |
||||||||||
Boodarie™ Iron |
100% |
291 |
177 |
276 |
386 |
384 |
770 |
396 |
||
|
|
|
|
|
|
|
|
|
|
|
STAINLESS STEEL MATERIALS |
||||||||||
NICKEL |
||||||||||
Production ('000 tonnes) |
||||||||||
CMSA |
99.8% |
6.9 |
9.4 |
9.1 |
9.6 |
10.4 |
20.0 |
13.3 |
||
Yabulu |
100% |
7.5 |
7.4 |
7.7 |
6.3 |
7.1 |
13.4 |
13.9 |
||
Total |
14.4 |
16.8 |
16.8 |
15.9 |
17.5 |
33.4 |
27.2 |
|||
|
|
|
|
|
|
|
|
|
|
|
CHROME ORES |
||||||||||
Saleable production ('000 tonnes) |
||||||||||
South Africa (k) |
60% |
898 |
674 |
665 |
629 |
609 |
1,238 |
1,819 |
||
|
|
|
|
|
|
|
|
|
|
|
FERROCHROME |
||||||||||
Saleable production ('000 tonnes) |
||||||||||
South Africa (k) |
60% |
249 |
192 |
194 |
207 |
206 |
413 |
522 |
||
|
|
|
|
|
|
|
|
|
|
|
ENERGY COAL |
|
|||||||||
Production ('000 tonnes) |
||||||||||
South Africa |
100% |
17,811 |
14,379 |
14,571 |
14,538 |
13,724 |
28,262 |
32,372 |
||
USA |
100% |
3,962 |
3,993 |
3,890 |
3,106 |
3,170 |
6,276 |
7,042 |
||
Australia |
100% |
1,227 |
1,512 |
1,329 |
1,173 |
863 |
2,036 |
2,462 |
||
Indonesia (l) |
80% |
2,134 |
2,035 |
2,291 |
2,450 |
1,778 |
4,228 |
4,100 |
||
Colombia (m) |
17%-33% |
687 |
1,091 |
1,053 |
1,138 |
1,088 |
2,226 |
687 |
||
Total |
25,821 |
23,010 |
23,134 |
22,405 |
20,623 |
43,028 |
46,663 |
|||
|
|
|
|
|
|
|
|
|
|
|
PETROLEUM |
|
|||||||||
Production |
||||||||||
Crude oil & condensate |
(000 bbl) |
20,000 |
19,911 |
18,378 |
19,492 |
19,747 |
39,239 |
40,817 |
||
Natural gas |
(bcf) |
60.83 |
67.61 |
71.64 |
71.24 |
76.23 |
147.47 |
122.58 |
||
LPG |
('000 tonnes) |
155.04 |
170.62 |
175.60 |
182.71 |
173.01 |
355.72 |
327.81 |
||
Ethane |
('000 tonnes) |
9.98 |
15.69 |
18.53 |
24.05 |
18.59 |
42.64 |
33.17 |
||
|
|
|
|
|
|
|
|
|
|
|
BHP STEEL |
|
|||||||||
Production ('000 tonnes) |
||||||||||
Raw steel |
100% |
1,372 |
1,277 |
1,328 |
1,382 |
1,262 |
2,644 |
2,827 |
||
Marketable steel products |
100% |
1,268 |
1,345 |
1,469 |
1,377 |
1,169 |
2,546 |
2,693 |
||
|
|
|
|
|
|
|
|
|
|
|
EXPLORATION, TECH & NEW BUSINESS |
||||||||||
DIAMONDS |
||||||||||
Production ('000 carats) |
||||||||||
Ekati™ (n) |
80% |
318 |
375 |
427 |
767 |
928 |
1,695 |
627 |
||
|
|
|
|
|
|
|
|
|
|
|
(a) Interest in Worsley increased from 30% to 86% effective January 2001. |
||||||||||
(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000. |
||||||||||
(c) Metal production is reported on the basis of payable metal. |
||||||||||
(d) Ok Tedi data shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001 |
||||||||||
that no profit would be recognised for Ok Tedi from 1 July 2001 except to the extent that dividends are received. |
||||||||||
Accordingly, Ok Tedi September 2001 and December 2001 quarter copper production (100% basis) of 48,200 tonnes and |
||||||||||
43,800 tonnes respectively and gold production of 104,855 ounces and 98,210 ounces respectively has not been recognised. |
||||||||||
(e) Included from 1 October 2000, the effective date of the acquisition of Rio Algom. Antamina commenced commercial |
||||||||||
production in October 2001. |
||||||||||
(f) Coal production is reported on the basis of saleable product. Production figures include some thermal coal. |
||||||||||
(g) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%). |
||||||||||
(h) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP Billiton and |
||||||||||
Mitsubishi Development Pty Ltd. |
||||||||||
(i) Shown on 100% basis before 20% outside equity interest. |
||||||||||
(j) Production reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is equally owned by |
||||||||||
BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited (QCT) in November 2000. In June 2001, |
||||||||||
Mitsubishi acquired the balance of the shares in QCT from BHP Billiton. |
||||||||||
(k) Shown on 100% basis. BHP Billiton interest in saleable production is 60%. |
||||||||||
(l) Production shown on 86.5% basis after allowing for Indonesian state owned corporation's 13.5% share of production. |
||||||||||
BHP Billiton sold its interest in the Senakin and Satui mines effective 30 November 2001. |
||||||||||
(m) Carbonnes del Cerrejon (BHP Billiton 33.3%) and Cerrejon Zona Norte (BHP Billiton 16.7%) were acquired in September 2000 |
||||||||||
and November 2000 respectively. |
||||||||||
(n) Interest in Ekati™ increased from 51% to 80% effective July 2001. |
||||||||||
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
ALUMINIUM |
|
|||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
||||||||||
('000 tonnes) |
||||||||||
ALUMINA |
||||||||||
Production |
||||||||||
Worsley, Australia (a) |
211 |
541 |
674 |
662 |
671 |
1,333 |
417 |
|||
Paranam, Suriname |
215 |
213 |
211 |
219 |
209 |
428 |
428 |
|||
Alumar, Brazil |
107 |
114 |
113 |
83 |
85 |
168 |
227 |
|||
Total |
533 |
868 |
998 |
964 |
965 |
1,929 |
1,072 |
|||
Sales |
||||||||||
Worsley, Australia (a) |
205 |
388 |
725 |
692 |
638 |
1,330 |
390 |
|||
Paranam, Suriname |
194 |
224 |
186 |
224 |
221 |
445 |
408 |
|||
Alumar, Brazil |
116 |
120 |
116 |
79 |
88 |
167 |
226 |
|||
Total |
515 |
732 |
1,027 |
995 |
947 |
1,942 |
1,024 |
|||
(a) Interest in Worsley increased from 30% to 86% effective January 2001. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
ALUMINIUM |
||||||||||
Production |
||||||||||
Hillside, South Africa |
127 |
122 |
123 |
125 |
117 |
242 |
253 |
|||
Bayside, South Africa |
45 |
44 |
43 |
44 |
45 |
89 |
91 |
|||
Alumar, Brazil |
44 |
42 |
43 |
35 |
32 |
67 |
87 |
|||
Valesul, Brazil |
12 |
11 |
9 |
8 |
9 |
17 |
23 |
|||
Mozal, Mozambique (b) |
23 |
31 |
32 |
32 |
32 |
64 |
30 |
|||
Total |
251 |
250 |
250 |
244 |
235 |
479 |
484 |
|||
Sales |
||||||||||
Hillside, South Africa |
127 |
121 |
124 |
123 |
117 |
240 |
253 |
|||
Bayside, South Africa |
46 |
42 |
50 |
43 |
43 |
86 |
87 |
|||
Alumar, Brazil |
43 |
41 |
45 |
34 |
33 |
67 |
85 |
|||
Valesul, Brazil |
11 |
7 |
12 |
8 |
8 |
16 |
22 |
|||
Mozal, Mozambique (b) |
20 |
32 |
33 |
32 |
32 |
64 |
25 |
|||
Total |
247 |
243 |
264 |
240 |
233 |
473 |
472 |
|||
(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
BASE METALS |
|
|||||||||
BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated. |
||||||||||
Escondida, Chile |
||||||||||
Material mined (100%) |
('000 tonnes) |
77,436 |
74,691 |
77,115 |
85,344 |
84,821 |
170,164 |
152,994 |
||
Sulphide ore milled (100%) |
('000 tonnes) |
11,534 |
11,128 |
10,650 |
11,205 |
10,060 |
21,265 |
23,893 |
||
Average copper grade |
(%) |
1.94% |
1.95% |
1.82% |
1.75% |
1.72% |
1.74% |
1.89% |
||
Production ex Mill (100%) |
('000 tonnes) |
190.4 |
176.4 |
159.5 |
162.0 |
144.4 |
306.3 |
389.9 |
||
Production |
||||||||||
Payable copper |
('000 tonnes) |
105.8 |
98.3 |
89.1 |
89.3 |
80.1 |
169.5 |
215.3 |
||
Payable gold concentrate |
(fine ounces) |
13,270 |
10,582 |
10,302 |
10,641 |
12,166 |
22,807 |
28,713 |
||
Copper cathode (SXEW) |
('000 tonnes) |
20.5 |
21.0 |
22.0 |
21.9 |
21.9 |
43.8 |
40.4 |
||
Sales |
||||||||||
Payable copper |
('000 tonnes) |
118.0 |
109.5 |
88.3 |
83.8 |
87.0 |
170.7 |
202.6 |
||
Payable gold concentrate |
(fine ounces) |
15,279 |
11,692 |
9,780 |
8,729 |
12,386 |
21,115 |
27,552 |
||
Copper cathode (SXEW) |
('000 tonnes) |
19.8 |
21.8 |
23.1 |
22.9 |
18.0 |
40.8 |
41.9 |
||
|
|
|
|
|
|
|
|
|
|
|
OK Tedi, Papua New Guinea (a) |
||||||||||
Material mined |
('000 tonnes) |
22,673 |
22,244 |
22,482 |
- |
- |
- |
44,972 |
||
Ore milled |
('000 tonnes) |
8,286 |
8,250 |
8,116 |
- |
- |
- |
15,657 |
||
Average head grades |
||||||||||
- Copper |
(%) |
0.91% |
0.85% |
0.92% |
- |
- |
- |
0.92% |
||
- Gold |
(g/t) |
0.77 |
0.70 |
0.82 |
- |
- |
- |
0.88 |
||
Production |
||||||||||
Payable copper |
('000 tonnes) |
54.1 |
51.7 |
53.4 |
- |
- |
- |
103.9 |
||
Payable gold concentrate |
(fine ounces) |
127,049 |
115,576 |
124,729 |
- |
- |
- |
267,797 |
||
Sales |
||||||||||
Payable copper |
('000 tonnes) |
53.5 |
53.4 |
67.5 |
- |
- |
- |
89.6 |
||
Payable gold concentrate |
(fine ounces) |
135,494 |
113,760 |
156,860 |
- |
- |
- |
235,975 |
||
(a) Ok Tedi data shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001 |
||||||||||
that no profit would be recognised for Ok Tedi from 1 July 2001 except to the extent that dividends are received. |
||||||||||
Accordingly, Ok Tedi September 2001 and December 2001 quarter copper production (100% basis) of 48,200 tonnes and |
||||||||||
43,800 tonnes respectively and gold production of 104,855 ounces and 98,210 ounces respectively has not been recognised. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Tintaya, Peru |
||||||||||
Material mined |
('000 tonnes) |
16,723 |
14,566 |
16,447 |
17,600 |
14,115 |
31,715 |
33,117 |
||
Ore milled |
('000 tonnes) |
1,744 |
1,429 |
1,508 |
1,640 |
1,569 |
3,209 |
3,364 |
||
Average copper grade |
(%) |
1.56% |
1.47% |
1.56% |
1.58% |
1.72% |
1.65% |
1.56% |
||
Production |
||||||||||
Payable copper |
('000 tonnes) |
24.0 |
18.4 |
20.1 |
20.9 |
22.9 |
43.8 |
46.5 |
||
Payable gold concentrate |
(fine ounces) |
4,638 |
5,146 |
7,693 |
10,249 |
11,500 |
21,749 |
11,585 |
||
Sales |
||||||||||
Payable copper |
('000 tonnes) |
24.5 |
12.1 |
32.0 |
19.2 |
17.8 |
37.0 |
42.2 |
||
|
Payable gold concentrate |
(fine ounces) |
5,149 |
3,125 |
10,350 |
9,745 |
9,546 |
|
19,291 |
12,943 |
Cerro Colorado, Chile (a) |
||||||||||
Material mined |
('000 tonnes) |
14,957 |
13,342 |
14,177 |
13,595 |
16,677 |
30,272 |
14,957 |
||
Ore milled |
('000 tonnes) |
3,264 |
3,479 |
3,546 |
3,517 |
3,894 |
7,411 |
3,264 |
||
Average copper grade |
(%) |
1.08% |
1.09% |
1.09% |
1.08% |
1.13% |
1.11% |
1.08% |
||
Production |
||||||||||
Copper cathode |
('000 tonnes) |
31.0 |
32.0 |
33.8 |
34.0 |
33.8 |
67.8 |
31.0 |
||
Sales |
||||||||||
Copper cathode |
('000 tonnes) |
30.4 |
32.8 |
33.6 |
34.0 |
31.7 |
65.7 |
30.4 |
||
|
(a) Cerro Colorado (BHP Billiton 100%) included from 1 October 2000, the effective date of the acquisition of Rio Algom. |
|
||||||||
Antamina, Peru (a) |
||||||||||
Material mined (100%) |
('000 tonnes) |
22,589 |
22,589 |
|||||||
Ore milled (100%) |
('000 tonnes) |
6,318 |
6,318 |
|||||||
Average head grades |
||||||||||
- Copper |
(%) |
1.32% |
1.32% |
|||||||
- Zinc |
(%) |
2.03% |
2.03% |
|||||||
- Silver |
(g/t) |
223 |
223 |
|||||||
Production |
||||||||||
Payable copper |
('000 tonnes) |
26.5 |
26.5 |
|||||||
Payable zinc |
(tonnes) |
16,010 |
16,010 |
|||||||
Payable silver |
('000 ounces) |
690 |
690 |
|||||||
Sales |
||||||||||
Payable copper |
('000 tonnes) |
28.7 |
28.7 |
|||||||
Payable zinc |
(tonnes) |
8,983 |
8,983 |
|||||||
Payable silver |
('000 ounces) |
596 |
596 |
|||||||
(a) BHP Billiton acquired its 33.8% interest in Antamina in October 2000 as part of the acquisition of Rio Algom. Commercial |
||||||||||
production commenced on 1 October 2001. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Alumbrera, Argentina (a) |
||||||||||
Material mined (100%) |
('000 tonnes) |
27,823 |
25,829 |
27,182 |
29,545 |
28,635 |
58,180 |
27,823 |
||
Ore milled (100%) |
('000 tonnes) |
7,097 |
7,041 |
7,445 |
7,516 |
7,142 |
14,658 |
7,097 |
||
Average head grades |
||||||||||
- Copper |
(%) |
0.64% |
0.71% |
0.74% |
0.70% |
0.74% |
0.72% |
0.64% |
||
- Gold |
(g/t) |
0.8 |
0.8 |
1.0 |
1.0 |
1.1 |
1.0 |
0.8 |
||
Production |
||||||||||
Payable copper |
('000 tonnes) |
9.9 |
10.8 |
11.9 |
11.6 |
12.0 |
23.6 |
9.9 |
||
Payable gold |
(fine ounces) |
30,094 |
30,579 |
39,922 |
40,370 |
42,978 |
83,348 |
30,094 |
||
Payable gold - dore |
(fine ounces) |
1,919 |
1,368 |
2,283 |
2,214 |
2,589 |
4,803 |
1,919 |
||
Sales |
||||||||||
Payable copper |
('000 tonnes) |
8.4 |
9.5 |
14.2 |
9.8 |
13.1 |
22.9 |
8.4 |
||
Payable gold |
(fine ounces) |
26,819 |
27,635 |
45,999 |
34,461 |
48,223 |
82,684 |
26,819 |
||
Payable gold - dore |
(fine ounces) |
1,907 |
1,934 |
2,138 |
2,009 |
1,829 |
3,838 |
1,907 |
||
(a) Alumbrera (BHP Billiton 25%) included from 1 October 2000, the effective date of the acquisition of Rio Algom. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Highland Valley, Canada (a) |
||||||||||
Material mined (100%) |
('000 tonnes) |
21,203 |
19,104 |
18,988 |
19,911 |
20,883 |
40,794 |
21,203 |
||
Ore milled (100%) |
('000 tonnes) |
13,155 |
11,784 |
11,355 |
12,841 |
12,912 |
25,753 |
13,155 |
||
Average copper grade |
(%) |
0.42% |
0.43% |
0.43% |
0.43% |
0.42% |
0.42% |
0.42% |
||
Production |
||||||||||
Payable copper |
('000 tonnes) |
16.1 |
14.8 |
14.1 |
16.1 |
16.0 |
32.1 |
16.1 |
||
Payable Molybdenum |
('000 tonnes) |
0.14 |
0.12 |
0.12 |
0.15 |
0.15 |
0.30 |
0.14 |
||
Sales |
||||||||||
Payable copper |
('000 tonnes) |
10.5 |
10.7 |
11.6 |
23.2 |
18.8 |
42.0 |
10.5 |
||
Payable Molybdenum |
('000 tonnes) |
0.21 |
0.18 |
0.14 |
0.14 |
0.10 |
0.24 |
0.21 |
||
(a) Highland Valley (BHP Billiton 33.6%) included from 1 October 2000, the effective date of the acquisition of Rio Algom. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Cannington, Australia |
||||||||||
Material mined |
('000 tonnes) |
460 |
464 |
507 |
543 |
555 |
1,098 |
890 |
||
Ore milled |
('000 tonnes) |
461 |
422 |
490 |
496 |
538 |
1,034 |
869 |
||
Average head grades |
||||||||||
- Silver |
(g/t) |
606 |
539 |
577 |
598 |
567 |
582 |
641 |
||
- Lead |
(%) |
12.8% |
12.7% |
13.2% |
13.2% |
12.1% |
12.6% |
13.6% |
||
- Zinc |
(%) |
5.6% |
5.5% |
5.5% |
4.8% |
5.3% |
5.0% |
5.3% |
||
Production |
||||||||||
Payable silver |
('000 ounces) |
7,591 |
6,462 |
7,806 |
7,804 |
7,915 |
15,719 |
15,220 |
||
Payable lead |
(tonnes) |
49,503 |
45,228 |
54,271 |
52,879 |
51,914 |
104,793 |
100,830 |
||
Payable zinc |
(tonnes) |
17,994 |
15,877 |
17,176 |
14,058 |
17,285 |
31,343 |
31,141 |
||
Sales |
||||||||||
Payable silver |
('000 ounces) |
6,583 |
8,107 |
8,681 |
7,231 |
8,045 |
15,276 |
13,571 |
||
Payable lead |
(tonnes) |
43,036 |
55,949 |
61,243 |
49,423 |
52,577 |
102,000 |
89,115 |
||
Payable zinc |
(tonnes) |
13,262 |
20,588 |
17,496 |
13,220 |
17,850 |
31,070 |
24,943 |
||
|
|
|
|
|
|
|
|
|
|
|
Selbaie, Canada |
||||||||||
Ore milled |
('000 tonnes) |
933 |
902 |
896 |
1,006 |
1,029 |
2,035 |
2,211 |
||
Average head grades |
||||||||||
- Zinc |
(%) |
1.54% |
1.57% |
1.42% |
1.50% |
1.29% |
1.39% |
1.56% |
||
- Copper |
(%) |
0.43% |
0.46% |
0.42% |
0.34% |
0.34% |
0.34% |
0.43% |
||
- Gold |
(g/t) |
0.43 |
0.40 |
0.42 |
0.34 |
0.24 |
0.29 |
0.47 |
||
- Silver |
(g/t) |
29.05 |
25.22 |
18.12 |
25.02 |
37.23 |
31.19 |
28.09 |
||
Production |
||||||||||
Payable zinc |
(tonnes) |
10,312 |
8,868 |
7,969 |
9,456 |
8,106 |
17,562 |
21,671 |
||
Payable copper |
(tonnes) |
3,183 |
3,279 |
2,872 |
2,470 |
2,668 |
5,138 |
6,573 |
||
Payable gold concentrate |
(ounces) |
9,344 |
8,472 |
8,198 |
6,207 |
4,929 |
11,136 |
21,245 |
||
Payable silver |
('000 ounces) |
469 |
362 |
259 |
379 |
676 |
1,055 |
915 |
||
Sales |
||||||||||
Payable zinc |
(tonnes) |
9,780 |
9,110 |
8,406 |
9,959 |
7,932 |
17,891 |
19,163 |
||
Payable copper |
(tonnes) |
3,390 |
3,260 |
3,035 |
3,196 |
2,615 |
5,811 |
6,373 |
||
Payable gold concentrate |
(ounces) |
11,777 |
10,177 |
8,207 |
8,112 |
8,002 |
16,114 |
18,059 |
||
Payable silver |
('000 ounces) |
494 |
445 |
405 |
284 |
321 |
605 |
1,029 |
||
|
|
|
|
|
|
|
|
|
|
|
Pering, South Africa |
||||||||||
Ore milled |
('000 tonnes) |
336 |
327 |
345 |
339 |
342 |
681 |
672 |
||
Average head grades |
||||||||||
- Zinc |
(%) |
2.22% |
2.03% |
2.09% |
2.00% |
1.90% |
1.96% |
2.12% |
||
- Lead |
(%) |
0.68% |
0.55% |
0.60% |
0.49% |
0.54% |
0.52% |
0.68% |
||
Production |
||||||||||
Payable zinc |
(tonnes) |
5,498 |
5,010 |
5,397 |
5,888 |
5,318 |
11,206 |
10,503 |
||
Payable lead |
(tonnes) |
1,601 |
1,320 |
1,486 |
1,153 |
1,298 |
2,451 |
3,217 |
||
Sales |
||||||||||
Payable zinc |
(tonnes) |
4,990 |
5,170 |
5,060 |
4,900 |
4,859 |
9,759 |
9,917 |
||
Payable lead |
(tonnes) |
1,250 |
1,590 |
1,490 |
1,336 |
1,217 |
2,553 |
2,952 |
||
|
|
|
|
|
|
|
|
|
|
|
San Manuel, USA |
||||||||||
Production |
||||||||||
Copper cathode (SXEW) |
('000 tonnes) |
2.6 |
2.5 |
2.3 |
2.3 |
2.2 |
4.5 |
5.4 |
||
|
|
|
|
|
|
|
|
|
|
|
Pinto Valley, USA |
||||||||||
Production |
||||||||||
|
Copper cathode (SXEW) |
('000 tonnes) |
4.4 |
3.9 |
3.8 |
3.4 |
3.4 |
|
6.8 |
8.7 |
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
CARBON STEEL MATERIALS |
||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
||||||||||
('000 tonnes) |
||||||||||
IRON ORE (a) |
||||||||||
Pilbara, Australia |
||||||||||
Production |
||||||||||
Mt Newman Joint Venture |
5,500 |
4,591 |
5,239 |
5,973 |
6,423 |
12,396 |
11,120 |
|||
Goldsworthy Joint Venture |
1,730 |
1,453 |
1,788 |
1,656 |
1,667 |
3,323 |
3,360 |
|||
Yandi Joint Venture |
5,840 |
6,354 |
6,882 |
7,046 |
6,933 |
13,979 |
12,920 |
|||
Jimblebar |
1,250 |
991 |
1,272 |
1,182 |
1,332 |
2,514 |
2,380 |
|||
Total (BHP Billiton share) |
14,320 |
13,389 |
15,181 |
15,858 |
16,355 |
32,213 |
29,780 |
|||
Total production (100%) |
16,626 |
15,577 |
17,636 |
18,448 |
19,006 |
37,453 |
34,615 |
|||
Shipments |
||||||||||
Lump |
3,730 |
3,950 |
3,823 |
3,729 |
3,483 |
7,212 |
7,670 |
|||
Fines |
11,400 |
11,171 |
11,545 |
12,334 |
12,025 |
24,359 |
22,440 |
|||
Total (BHP Billiton share) |
15,130 |
15,121 |
15,368 |
16,063 |
15,508 |
31,571 |
30,110 |
|||
Total shipments (100%) |
17,798 |
17,789 |
18,080 |
18,897 |
18,245 |
37,142 |
35,420 |
|||
(a) Iron ore production and shipments are reported on a wet tonnes basis. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Samarco, Brazil |
||||||||||
Production |
1,910 |
1,885 |
1,893 |
1,223 |
928 |
2,151 |
3,730 |
|||
Shipments |
2,150 |
1,699 |
1,460 |
1,156 |
1,440 |
2,596 |
3,820 |
|||
|
|
|
|
|
|
|
|
|
|
|
METALLURGICAL COAL (a) |
||||||||||
Queensland, Australia |
||||||||||
Production |
||||||||||
CQCA Joint Venture (b) |
||||||||||
Blackwater |
1,076 |
1,066 |
1,130 |
977 |
1,305 |
2,282 |
2,132 |
|||
Goonyella |
965 |
967 |
1,122 |
986 |
850 |
1,836 |
1,889 |
|||
Peak Downs |
886 |
571 |
779 |
885 |
730 |
1,615 |
1,779 |
|||
Saraji |
433 |
504 |
530 |
627 |
528 |
1,155 |
1,041 |
|||
Norwich Park |
434 |
411 |
503 |
527 |
495 |
1,022 |
914 |
|||
CQCA total |
3,794 |
3,519 |
4,064 |
4,002 |
3,908 |
7,910 |
7,755 |
|||
South Blackwater (c) |
- |
- |
- |
670 |
524 |
1,194 |
- |
|||
Gregory Joint Venture (b) |
970 |
845 |
960 |
486 |
408 |
894 |
1,821 |
|||
BHP Mitsui Coal (d) |
||||||||||
Riverside |
727 |
834 |
966 |
917 |
649 |
1,567 |
1,472 |
|||
South Walker Creek |
798 |
844 |
836 |
906 |
817 |
1,723 |
1,467 |
|||
BHP Mitsui Coal total |
1,525 |
1,678 |
1,802 |
1,823 |
1,467 |
3,290 |
2,939 |
|||
Queensland total |
6,289 |
6,042 |
6,826 |
6,980 |
6,307 |
13,288 |
12,515 |
|||
Shipments |
||||||||||
Coking coal |
4,669 |
4,401 |
4,813 |
4,804 |
4,011 |
8,815 |
9,223 |
|||
Weak coking coal |
1,466 |
1,138 |
1,245 |
1,592 |
1,674 |
3,267 |
2,531 |
|||
Thermal coal |
657 |
474 |
624 |
631 |
704 |
1,335 |
1,290 |
|||
Total |
6,792 |
6,013 |
6,682 |
7,027 |
6,390 |
13,417 |
13,044 |
|||
(a) Coal production is reported on the basis of saleable product. Production figures include some thermal coal. |
||||||||||
(b) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%). |
||||||||||
(c) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP Billiton and |
||||||||||
Mitsubishi Development Pty Ltd. |
||||||||||
(d) BHP Mitsui Coal production shown on 100% basis before 20% outside equity interest. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
QCT Resources, Australia (a) |
||||||||||
Production |
||||||||||
CQCA |
732 |
1,093 |
1,263 |
- |
- |
- |
732 |
|||
Gregory Joint Venture |
173 |
213 |
242 |
- |
- |
- |
173 |
|||
South Blackwater |
355 |
531 |
582 |
- |
- |
- |
355 |
|||
Total |
1,260 |
1,837 |
2,087 |
- |
- |
- |
1,260 |
|||
Shipments |
||||||||||
Coking coal |
876 |
1,633 |
1,476 |
- |
- |
- |
876 |
|||
Weak coking coal |
146 |
227 |
231 |
- |
- |
- |
146 |
|||
Thermal coal |
245 |
209 |
268 |
- |
- |
- |
245 |
|||
Total |
1,267 |
2,069 |
1,975 |
- |
- |
- |
1,267 |
|||
(a) Production and shipments reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is |
||||||||||
equally owned by BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited (QCT) in November 2000. |
||||||||||
In June 2001, Mitsubishi acquired the balance of the shares in QCT from BHP Billiton. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Illawarra, Australia |
||||||||||
Production |
1,328 |
1,619 |
1,889 |
2,055 |
1,841 |
3,896 |
3,066 |
|||
Shipments |
||||||||||
Coking coal |
1,512 |
1,410 |
1,686 |
1,457 |
1,655 |
3,112 |
2,838 |
|||
Thermal coal |
165 |
67 |
246 |
136 |
94 |
230 |
293 |
|||
Total |
1,677 |
1,477 |
1,932 |
1,593 |
1,749 |
3,342 |
3,131 |
|||
|
|
|
|
|
|
|
|
|
|
|
MANGANESE ORES |
||||||||||
South Africa |
||||||||||
Saleable production (a) |
579 |
538 |
490 |
467 |
501 |
968 |
1,134 |
|||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Australia |
||||||||||
Saleable production (a) |
318 |
379 |
446 |
505 |
387 |
892 |
787 |
|||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
MANGANESE ALLOYS |
||||||||||
South Africa |
||||||||||
Saleable production (a) |
106 |
96 |
85 |
69 |
101 |
170 |
217 |
|||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Australia |
||||||||||
Saleable production (a) |
67 |
64 |
51 |
50 |
63 |
113 |
131 |
|||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
HOT BRIQUETTED IRON |
||||||||||
Boodarie™ Iron, Australia |
||||||||||
Production |
291 |
177 |
276 |
386 |
384 |
770 |
396 |
|||
Shipments |
107 |
238 |
342 |
358 |
302 |
660 |
161 |
|||
|
|
|
|
|
|
|
|
|
|
|
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
STAINLESS STEEL MATERIALS |
||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
||||||||||
('000 tonnes) |
||||||||||
NICKEL |
||||||||||
CMSA, Colombia |
||||||||||
Production |
6.9 |
9.4 |
9.1 |
9.6 |
10.4 |
20.0 |
13.3 |
|||
Sales |
5.5 |
8.8 |
10.2 |
9.1 |
10.4 |
19.5 |
11.9 |
|||
|
|
|
|
|
|
|
|
|
|
|
Yabulu, Australia |
||||||||||
Production |
||||||||||
Nickel |
7.5 |
7.4 |
7.7 |
6.3 |
7.1 |
13.4 |
13.9 |
|||
Cobalt |
0.4 |
0.5 |
0.5 |
0.4 |
0.4 |
0.8 |
0.8 |
|||
Sales |
||||||||||
Nickel |
6.3 |
6.5 |
8.2 |
7.7 |
6.9 |
14.6 |
12.6 |
|||
Cobalt |
0.4 |
0.4 |
0.4 |
0.4 |
0.5 |
0.9 |
0.8 |
|||
|
|
|
|
|
|
|
|
|
|
|
CHROME ORES |
||||||||||
South Africa |
||||||||||
Saleable production (a) |
898 |
674 |
665 |
629 |
609 |
1,238 |
1,819 |
|||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
FERROCHROME |
||||||||||
South Africa |
||||||||||
Saleable production (a) |
249 |
192 |
194 |
207 |
206 |
413 |
522 |
|||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
ENERGY COAL |
|
|||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
||||||||||
('000 tonnes) |
||||||||||
Ingwe, South Africa |
||||||||||
Production |
17,811 |
14,379 |
14,571 |
14,538 |
13,724 |
28,262 |
32,372 |
|||
Sales |
||||||||||
Export |
6,489 |
6,164 |
6,557 |
6,289 |
6,083 |
12,372 |
13,058 |
|||
Local utility |
10,273 |
6,957 |
6,821 |
7,477 |
6,780 |
14,257 |
17,371 |
|||
Inland |
1,473 |
1,207 |
1,110 |
1,092 |
1,111 |
2,203 |
2,690 |
|||
Total |
18,235 |
14,328 |
14,488 |
14,858 |
13,974 |
28,832 |
33,119 |
|||
|
|
|
|
|
|
|
|
|
|
|
New Mexico, USA |
||||||||||
Production |
||||||||||
Navajo Coal |
2,119 |
1,838 |
2,170 |
1,694 |
1,682 |
3,376 |
3,663 |
|||
San Juan Coal |
1,843 |
2,155 |
1,720 |
1,412 |
1,488 |
2,900 |
3,379 |
|||
Total |
3,962 |
3,993 |
3,890 |
3,106 |
3,170 |
6,276 |
7,042 |
|||
Sales - local utility |
3,565 |
3,566 |
3,434 |
3,407 |
3,489 |
6,896 |
7,350 |
|||
|
|
|
|
|
|
|
|
|
|
|
COAL, Australia |
||||||||||
Production |
1,227 |
1,512 |
1,329 |
1,173 |
863 |
2,036 |
2,462 |
|||
Sales |
||||||||||
Export |
685 |
1,190 |
1,201 |
604 |
571 |
1,175 |
1,634 |
|||
Inland |
235 |
396 |
399 |
398 |
378 |
776 |
627 |
|||
Total |
920 |
1,586 |
1,600 |
1,002 |
949 |
1,951 |
2,261 |
|||
|
|
|
|
|
|
|
|
|
|
|
Kalimantan, Indonesia (a) |
||||||||||
Production |
||||||||||
Senakin (b) |
1,050 |
924 |
1,099 |
1,161 |
801 |
1,962 |
1,955 |
|||
Satui (b) |
871 |
926 |
981 |
1,068 |
777 |
1,845 |
1,689 |
|||
Petangis |
213 |
185 |
211 |
221 |
201 |
422 |
456 |
|||
Total |
2,134 |
2,035 |
2,291 |
2,450 |
1,778 |
4,228 |
4,100 |
|||
Sales - export |
2,049 |
1,942 |
2,308 |
2,312 |
1,684 |
3,996 |
4,124 |
|||
(a) Reported on 86.5% basis after allowing for the Indonesian state-owned corporation's 13.5% share of all production. |
||||||||||
(b) BHP Billiton sold its interest in Senakin and Satui effective 30 November 2001. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
CDC & CZN, Colombia (a) |
||||||||||
Production |
687 |
1,091 |
1,053 |
1,138 |
1,088 |
2,226 |
687 |
|||
Sales - export |
676 |
1,102 |
959 |
1,098 |
688 |
1,786 |
676 |
|||
(a) Carbonnes del Cerrejon (BHP Billiton 33.3%) and Cerrejon Zona Norte (BHP Billiton 16.7%) were acquired in September 2000 |
||||||||||
and November 2000 respectively. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
PETROLEUM |
|
|||||||||
BHP Billiton attributable production unless otherwise stated. |
||||||||||
CRUDE OIL & CONDENSATE ('000 barrels) |
||||||||||
Bass Strait |
7,096 |
6,990 |
6,946 |
7,387 |
7,197 |
14,584 |
14,900 |
|||
North West Shelf - condensate |
1,144 |
1,240 |
1,239 |
1,331 |
1,310 |
2,641 |
2,369 |
|||
North West Shelf - Wanaea/Cossack |
1,885 |
1,820 |
1,757 |
1,652 |
1,919 |
3,571 |
3,567 |
|||
Laminaria |
3,875 |
3,533 |
3,076 |
3,001 |
2,569 |
5,570 |
8,244 |
|||
Buffalo (a) |
763 |
- |
- |
- |
- |
- |
1,520 |
|||
Griffin |
1,714 |
2,241 |
1,194 |
1,037 |
863 |
1,900 |
3,705 |
|||
Pakistan (b) |
- |
3 |
14 |
17 |
19 |
36 |
- |
|||
Typhoon (c) |
- |
- |
- |
835 |
1,443 |
2,278 |
- |
|||
Americas |
944 |
941 |
958 |
918 |
919 |
1,837 |
1,770 |
|||
Liverpool Bay |
1,978 |
2,469 |
2,516 |
2,830 |
2,868 |
5,698 |
3,694 |
|||
Bruce/Keith (d) |
601 |
674 |
678 |
483 |
640 |
1,123 |
1,048 |
|||
Total |
20,000 |
19,911 |
18,378 |
19,492 |
19,747 |
39,239 |
40,817 |
|||
NATURAL GAS (billion cubic feet) |
||||||||||
Bass Strait |
18.96 |
22.91 |
26.75 |
30.05 |
23.14 |
53.19 |
46.74 |
|||
North West Shelf - Domestic |
3.28 |
3.29 |
3.81 |
3.68 |
3.73 |
7.41 |
6.41 |
|||
North West Shelf - LNG |
13.83 |
14.24 |
13.47 |
15.76 |
15.56 |
31.32 |
29.02 |
|||
Griffin |
0.82 |
0.73 |
0.84 |
1.35 |
1.25 |
2.60 |
1.57 |
|||
Pakistan (b) |
- |
0.40 |
2.03 |
2.66 |
2.83 |
5.49 |
- |
|||
Typhoon (c) |
- |
- |
- |
0.67 |
1.48 |
2.15 |
- |
|||
Americas |
5.38 |
5.19 |
5.52 |
5.41 |
5.45 |
10.86 |
10.59 |
|||
Bruce |
9.38 |
10.43 |
7.59 |
3.28 |
10.65 |
13.93 |
14.39 |
|||
Keith (d) |
0.11 |
0.24 |
0.25 |
0.19 |
0.27 |
0.46 |
0.11 |
|||
Liverpool Bay |
9.07 |
10.18 |
11.38 |
8.19 |
11.87 |
20.06 |
13.75 |
|||
Total |
60.83 |
67.61 |
71.64 |
71.24 |
76.23 |
147.47 |
122.58 |
|||
LPG ('000 tonnes) |
||||||||||
Bass Strait |
95.70 |
113.21 |
117.66 |
128.52 |
107.80 |
236.32 |
223.85 |
|||
North West Shelf |
30.69 |
30.44 |
31.65 |
36.32 |
35.53 |
71.85 |
62.17 |
|||
Griffin |
1.50 |
0.51 |
- |
- |
- |
- |
3.07 |
|||
Bruce |
26.72 |
23.01 |
24.85 |
16.51 |
28.50 |
45.01 |
38.29 |
|||
Keith (d) |
0.43 |
3.45 |
1.44 |
1.36 |
1.18 |
2.54 |
0.43 |
|||
Total |
155.04 |
170.62 |
175.60 |
182.71 |
173.01 |
355.72 |
327.81 |
|||
ETHANE ('000 tonnes) |
9.98 |
15.69 |
18.53 |
24.05 |
18.59 |
42.64 |
33.17 |
|||
(a) Buffalo sold effective September 2000. |
||||||||||
(b) Zamzama extended well test commenced in March 2001. |
||||||||||
(c) Typhoon commenced production in July 2001. |
||||||||||
(d) Keith commenced production in November 2000. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
BHP STEEL |
|
|||||||||
BHP Billiton attributable production unless otherwise stated. |
||||||||||
('000 tonnes) |
||||||||||
PRODUCTION |
||||||||||
Iron Sands |
||||||||||
NZS, New Zealand |
712 |
274 |
478 |
397 |
464 |
861 |
1,435 |
|||
Coke |
||||||||||
Port Kembla, Australia |
599 |
578 |
643 |
661 |
620 |
1,281 |
1,215 |
|||
Iron |
||||||||||
Port Kembla, Australia |
1,231 |
1,177 |
1,269 |
1,262 |
1,191 |
2,453 |
2,529 |
|||
Raw Steel |
||||||||||
Port Kembla, Australia |
1,226 |
1,120 |
1,176 |
1,238 |
1,109 |
2,347 |
2,534 |
|||
NZS, New Zealand |
146 |
157 |
152 |
144 |
153 |
297 |
293 |
|||
Total |
1,372 |
1,277 |
1,328 |
1,382 |
1,262 |
2,644 |
2,827 |
|||
Delta, Ohio (a) |
186 |
190 |
197 |
196 |
196 |
392 |
379 |
|||
Marketable Steel Products |
||||||||||
Flat Products |
||||||||||
Flat and Tinplate products |
1,152 |
1,094 |
1,183 |
1,183 |
1,054 |
2,237 |
2,394 |
|||
Coated Products |
||||||||||
Rolled and coated products |
464 |
462 |
474 |
533 |
400 |
933 |
995 |
|||
Flat and coated products (NZS) |
125 |
139 |
135 |
137 |
117 |
254 |
262 |
|||
Rolled and coated products (offshore) |
98 |
81 |
89 |
69 |
70 |
139 |
168 |
|||
Building products (includes offshore) |
34 |
42 |
42 |
40 |
36 |
76 |
74 |
|||
Total (b) |
1,268 |
1,345 |
1,469 |
1,377 |
1,169 |
2,546 |
2,693 |
|||
Delta, Ohio (a) |
182 |
186 |
193 |
192 |
192 |
384 |
371 |
|||
DESPATCHES (c) |
||||||||||
Business unit despatches |
||||||||||
Flat Products |
1,069 |
1,098 |
1,294 |
1,128 |
996 |
2,124 |
2,312 |
|||
Coated Products |
691 |
666 |
813 |
746 |
657 |
1,403 |
1,423 |
|||
Total (d) |
1,237 |
1,282 |
1,587 |
1,296 |
1,153 |
2,449 |
2,473 |
|||
External despatches |
||||||||||
Australia |
Domestic (e) |
503 |
515 |
585 |
691 |
569 |
1,260 |
988 |
||
Export |
515 |
546 |
757 |
387 |
391 |
778 |
1,056 |
|||
New Zealand |
Domestic (e) |
62 |
56 |
55 |
61 |
56 |
117 |
129 |
||
Export |
55 |
77 |
97 |
83 |
67 |
150 |
123 |
|||
Other offshore |
102 |
88 |
93 |
74 |
70 |
144 |
177 |
|||
Total |
1,237 |
1,282 |
1,587 |
1,296 |
1,153 |
2,449 |
2,473 |
|||
Delta, Ohio (a) |
177 |
190 |
191 |
191 |
189 |
380 |
367 |
|||
(a) Production and despatches reported is that proportion determined by BHP Steel's equity interest in North Star BHP LLC (50%). |
||||||||||
(b) Total excludes production for intra-business sales. Therefore, the total figure is less than the sum of the individual businesses. |
||||||||||
(c) Steel products only. Excludes pig iron and by-products. |
||||||||||
(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses. |
||||||||||
(e) Includes despatches to OneSteel Limited from 1 November 2000. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
|||
QUARTER ENDED |
HALF YEAR ENDED |
|||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
EXPLORATION, TECHNOLOGY & NEW BUSINESS |
||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
||||||||||
DIAMONDS |
||||||||||
Ekati™, Canada |
||||||||||
Production (a) |
('000 carats) |
318 |
375 |
427 |
767 |
928 |
1,695 |
627 |
||
(a) Interest in Ekati™ increased from 51% to 80% effective July 2001. |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
PRODUCTION AND SHIPMENT REPORT |
|
|
|
|
|
|
|
||||
QUARTER ENDED |
HALF YEAR ENDED |
||||||||||
DEC |
MARCH |
JUNE |
SEPT |
DEC |
DEC |
DEC |
|||||
|
|
|
2000 |
2001 |
2001 |
2001 |
2001 |
|
2001 |
2000 |
|
STEEL - DISCONTINUED OPERATIONS (a) |
|||||||||||
BHP Billiton attributable production unless otherwise stated. |
|||||||||||
('000 tonnes) |
|||||||||||
PRODUCTION |
|||||||||||
Iron Ore |
|||||||||||
Whyalla, Australia |
254 |
- |
- |
- |
- |
- |
910 |
||||
Coke |
|||||||||||
Whyalla, Australia |
49 |
- |
- |
- |
- |
- |
198 |
||||
Iron |
|||||||||||
Whyalla, Australia |
102 |
- |
- |
- |
- |
- |
372 |
||||
Raw Steel |
|||||||||||
Whyalla, Australia |
99 |
- |
- |
- |
- |
- |
344 |
||||
Newcastle, Australia |
- |
- |
- |
- |
- |
- |
- |
||||
Sydney, Australia |
36 |
- |
- |
- |
- |
- |
164 |
||||
Total |
135 |
- |
- |
- |
- |
- |
508 |
||||
Marketable Steel Products |
|||||||||||
Long products |
171 |
- |
- |
- |
- |
- |
722 |
||||
Other offshore (USA) (b) |
- |
- |
- |
- |
- |
- |
- |
||||
Total (b) |
171 |
- |
- |
- |
- |
- |
711 |
||||
DESPATCHES (c) |
|||||||||||
Business unit despatches |
|||||||||||
Long Products |
166 |
- |
- |
- |
- |
- |
693 |
||||
Other offshore (USA) (b) |
- |
- |
- |
- |
- |
- |
- |
||||
Total (d) |
166 |
- |
- |
- |
- |
- |
693 |
||||
External despatches |
|||||||||||
Australia |
Domestic |
150 |
- |
- |
- |
- |
- |
632 |
|||
Export |
16 |
- |
- |
- |
- |
- |
61 |
||||
Other offshore (USA) (b) |
- |
- |
- |
- |
- |
- |
- |
||||
Total |
166 |
- |
- |
- |
- |
- |
693 |
||||
(a) Data tables reflect the spin-out of OneSteel Limited from BHP Billiton effective 31 October 2000. |
|||||||||||
(b) US steel businesses were sold in June 2000. |
|||||||||||
(c) Steel products only. Excludes pig iron and by-products. |
|||||||||||
(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses. |
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
BHP Billiton Limited ABN 49 004 028 077 Registered Office: 600 Bourke Street Melbourne Victoria 3000 Telephone +61 3 9609 3333 Facsimile +61 3 9609 3015 |
BHP Billiton Plc Registration number 3196209 Registered Office: 1-3 Strand London WC2N 5HA United Kingdom Telephone +44 20 7747 3800 Facsimile +44 20 7747 3900 |
The BHP Billiton Group is headquartered in Australia