Organisational

Date: 25 January 2002

Number: 02/02

 

BHP Billiton Production Report for the Quarter

Ended 31 December 2001

BHP Billiton today released its production report for the quarter ended 31 December 2001. The results demonstrate a solid operational performance, particularly from the iron ore and petroleum assets, and the contribution from new copper, metallurgical coal, petroleum and alumina operations.

The production figures also reflect BHP Billiton's international resource management strategy, including the decision to temporarily reduce copper production by an estimated 170,000 tonnes per annum.

 

 

Increased production was also recorded at the Bruce and Keith fields (UK) during the December 2001 quarter due to increased customer demand. In addition, Typhoon (USA) reported higher production during the December 2001 quarter following the ramp-up of first production from the deepwater Gulf of Mexico asset (commenced operations in July 2001). Higher production was recorded at the Wanaea/Cossack fields (Australia) during the December 2001 quarter following planned maintenance in the previous quarter.

 

During January 2002, BHP Billiton commenced the temporary curtailment of production at its Tintaya (Peru) operations and closed its remaining in-situ leaching operations at San Manuel (USA) as part of its international copper resource management strategy. At the time of the announcements Tintaya was producing 90,000 tonnes per annum of copper, while San Manuel was producing 9,000 tonnes per annum of copper cathode.

 

Lower production, compared to the December 2000 quarter, follows the equalisation of Queensland (Australia) coal interests with Mitsubishi to form the BHP Billiton Mitsubishi Alliance in March 2001. Production at the Gregory Joint Venture (Australia) during the half year was impacted by adverse roof conditions encountered at the Crinum mine between August and December.

 

 

 

****

Further news and information can be found on our Internet site: www.bhpbilliton.com

Australia
Andrew Nairn, Investor Relations
Tel:+61 3 9609 3952
Mobile: +61 408 313 259
Email: Andrew.W.Nairn@bhpbilliton.com

Mandy Frostick, Media Relations
Tel:+61 3 9609 4157
Mobile: +61 419 546 245
Email: Mandy.J.Frostick@bhpbilliton.com

United States
Francis McAllister, Investor Relations
Tel: +1 713 961 8625
Mobile: +1 713 480 3699
Email: Francis.R.McAllister@bhpbilliton.com

United Kingdom/ South Africa
Ariane Gentil, Manager Communications
Tel:+44 20 7747 3977
Mobile: +44 7881 518 715
Email: Ariane.Gentil@bhpbilliton.com

Michael Campbell, Investor & Media Relations
Tel:+27 11 376 3360
Mobile: +27 82 458 2587
Email: Michael.J.Campbell@bhpbilliton.com

 

BHP BILLITON PRODUCTION SUMMARY

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

% CHANGE

DEC Q01

DEC Q01

YTD 01

DEC

SEPT

DEC

DEC

DEC

vs

vs

vs

 

 

 

2000

2001

2001

 

2001

2000

 

DEC Q00

SEPT Q01

YTD 00

ALUMINIUM

Alumina

('000 tonnes)

533

964

965

1,929

1,072

81%

0%

80%

Aluminium

('000 tonnes)

251

244

235

479

484

-6%

-4%

-1%

BASE METALS

Copper

('000 tonnes)

271.6

202.1

221.6

423.6

483.7

-18%

10%

-12%

Lead

(tonnes)

51,104

54,032

53,212

107,244

104,047

4%

-2%

3%

Zinc

(tonnes)

33,804

29,402

46,719

76,122

63,315

38%

59%

20%

Gold

(ounces)

186,314

69,682

74,162

143,844

361,353

-60%

6%

-60%

Silver

('000 ounces)

8,060

8,183

9,281

17,464

16,135

15%

13%

8%

Molybdenum

('000 tonnes)

0.1

0.2

0.2

0.3

0.1

12%

1%

123%

CARBON STEEL MATERIALS

Iron ore

('000 tonnes)

16,230

17,080

17,283

34,363

33,510

6%

1%

3%

Metallurgical coal

('000 tonnes)

8,877

9,035

8,149

17,184

16,841

-8%

-10%

2%

Manganese ores

('000 tonnes)

897

973

888

1,860

1,921

-1%

-9%

-3%

Manganese alloys

('000 tonnes)

173

119

165

284

348

-5%

39%

-18%

Hot briquetted iron

('000 tonnes)

291

386

384

770

396

32%

0%

95%

STAINLESS STEEL MATERIALS

Nickel

('000 tonnes)

14.4

15.9

17.5

33.4

27.2

22%

10%

23%

Chrome ores

('000 tonnes)

898

629

609

1,238

1,819

-32%

-3%

-32%

Ferrochrome

('000 tonnes)

249

207

206

413

522

-17%

0%

-21%

ENERGY COAL

('000 tonnes)

25,821

22,405

20,623

43,028

46,663

-20%

-8%

-8%

PETROLEUM

Crude oil and condensate

('000 bbl)

20,000

19,492

19,747

39,239

40,817

-1%

1%

-4%

Natural gas

(bcf)

60.83

71.24

76.23

147.47

122.58

25%

7%

20%

LPG

('000 tonnes)

155.04

182.71

173.01

355.72

327.81

12%

-5%

9%

Ethane

('000 tonnes)

9.98

24.05

18.59

42.64

33.17

86%

-23%

29%

BHP STEEL

Raw steel

('000 tonnes)

1,372

1,382

1,262

2,644

2,827

-8%

-9%

-6%

Marketable steel products

('000 tonnes)

1,268

1,377

1,169

2,546

2,693

-8%

-15%

-5%

EXPLOR'N, TECH & NEW BUS

Diamonds

('000 carats)

318

767

928

1,695

627

192%

21%

170%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BHP BILLITON ATTRIBUTABLE PRODUCTION

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

BHP Billiton

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

Interest

2000

2001

2001

2001

2001

 

2001

2000

ALUMINIUM

 

ALUMINA

Production ('000 tonnes)

Worsley (a)

86%

211

541

674

662

671

1,333

417

Suriname

45%

215

213

211

219

209

428

428

Alumar

36%

107

114

113

83

85

168

227

Total

533

868

998

964

965

1,929

1,072

 

 

 

 

 

 

 

 

 

 

 

ALUMINIUM

Production ('000 tonnes)

Hillside

100%

127

122

123

125

117

242

253

Bayside

100%

45

44

43

44

45

89

91

Alumar

46.3%

44

42

43

35

32

67

87

Valesul

45.5%

12

11

9

8

9

17

23

Mozal (b)

47%

23

31

32

32

32

64

30

Total

251

250

250

244

235

479

484

 

 

 

 

 

 

 

 

 

 

 

BASE METALS (c)

 

COPPER

Payable metal ('000 tonnes)

Escondida

57.5%

105.8

98.3

89.1

89.3

80.1

169.5

215.3

Ok Tedi (d)

52%

54.1

51.7

53.4

-

-

-

103.9

Tintaya

100%

24.0

18.4

20.1

20.9

22.9

43.8

46.5

Antamina (e)

33.8%

-

-

-

-

26.5

26.5

-

Alumbrera (e)

25%

9.9

10.8

11.9

11.6

12.0

23.6

9.9

Highland Valley (e)

33.6%

16.1

14.8

14.1

16.1

16.0

32.1

16.1

Selbaie

100%

3.2

3.3

2.9

2.5

2.7

5.1

6.6

Total

213.1

197.2

191.5

140.4

160.2

300.6

398.3

Refined production ('000 tonnes)

Escondida

57.5%

20.5

21.0

22.0

21.9

21.9

43.8

40.4

Cerro Colorado (e)

100%

31.0

32.0

33.8

34.0

33.8

67.8

31.0

San Manuel

100%

2.6

2.5

2.3

2.3

2.2

4.5

5.4

Pinto Valley

100%

4.4

3.9

3.8

3.4

3.4

6.8

8.7

Total

58.5

59.4

62.0

61.6

61.4

123.0

85.4

 

 

 

 

 

 

 

 

 

 

 

LEAD

Payable metal (tonnes)

Cannington

100%

49,503

45,228

54,271

52,879

51,914

104,793

100,830

Pering

100%

1,601

1,320

1,486

1,153

1,298

2,451

3,217

Total

51,104

46,548

55,757

54,032

53,212

107,244

104,047

 

 

 

 

 

 

 

 

 

 

 

ZINC

Payable metal (tonnes)

Cannington

100%

17,994

15,877

17,176

14,058

17,285

31,343

31,141

Antamina (e)

33.8%

-

-

-

-

16,010

16,010

-

Selbaie

100%

10,312

8,868

7,969

9,456

8,106

17,562

21,671

Pering

100%

5,498

5,010

5,397

5,888

5,318

11,206

10,503

Total

33,804

29,755

30,542

29,402

46,719

76,122

63,315

 

 

 

 

 

 

 

 

 

 

 

BASE METALS (continued)

 

GOLD

Payable concentrate (ounces)

Ok Tedi (d)

52%

127,049

115,576

124,729

-

-

-

267,797

Escondida

57.5%

13,270

10,582

10,302

10,641

12,166

22,807

28,713

Tintaya

100%

4,638

5,146

7,693

10,249

11,500

21,749

11,585

Alumbrera (e)

25%

32,013

31,947

42,205

42,584

45,567

88,151

32,013

Selbaie

100%

9,344

8,472

8,198

6,207

4,929

11,136

21,245

Total

186,314

171,723

193,126

69,682

74,162

143,844

361,353

 

 

 

 

 

 

 

 

 

 

 

SILVER

Payable metal ('000 ounces)

Cannington

100%

7,591

6,462

7,806

7,804

7,915

15,719

15,220

Antamina (e)

33.8%

-

-

-

-

690

690

-

Selbaie

100%

469

362

259

379

676

1,055

915

Total

8,060

6,824

8,065

8,183

9,281

17,464

16,135

 

 

 

 

 

 

 

 

 

 

 

MOLYBDENUM

Payable metal ('000 tonnes)

Highland Valley (e)

33.6%

0.14

0.12

0.12

0.15

0.15

0.30

0.14

 

 

 

 

 

 

 

 

 

 

 

CARBON STEEL MATERIALS

 

IRON ORE

Production ('000 tonnes)

Mt Newman Joint Venture

85%

5,500

4,591

5,239

5,973

6,423

12,396

11,120

Goldsworthy Joint Venture

85%

1,730

1,453

1,788

1,656

1,667

3,323

3,360

Yandi Joint Venture

85%

5,840

6,354

6,882

7,046

6,933

13,979

12,920

Jimblebar

100%

1,250

991

1,272

1,182

1,332

2,514

2,380

Samarco

50%

1,910

1,885

1,893

1,223

928

2,151

3,730

Total

16,230

15,274

17,074

17,080

17,283

34,363

33,510

 

 

 

 

 

 

 

 

 

 

 

METALLURGICAL COAL (f)

Production ('000 tonnes)

CQCA Joint Venture (g)

50%

3,794

3,519

4,064

4,002

3,908

7,910

7,755

South Blackwater (h)

50%

-

-

-

670

524

1,194

-

Gregory Joint Venture (g)

50%

970

845

960

486

408

894

1,821

BHP Mitsui Coal (i)

80%

1,525

1,678

1,802

1,823

1,467

3,290

2,939

QCT Resources (j)

50%

1,260

1,837

2,087

-

-

-

1,260

Illawarra

100%

1,328

1,619

1,889

2,055

1,841

3,896

3,066

Total

8,877

9,498

10,802

9,035

8,149

17,184

16,841

 

 

 

 

 

 

 

 

 

 

 

MANGANESE ORES

Saleable production ('000 tonnes)

South Africa (k)

60%

579

538

490

467

501

968

1,134

Australia (k)

60%

318

379

446

505

387

892

787

Total

897

917

936

973

888

1,860

1,921

 

 

 

 

 

 

 

 

 

 

 

CARBON STEEL MATERIALS (cont'd)

MANGANESE ALLOYS

Saleable production ('000 tonnes)

South Africa (k)

60%

106

96

85

69

101

170

217

Australia (k)

60%

67

64

51

50

63

113

131

Total

173

160

136

119

165

284

348

 

 

 

 

 

 

 

 

 

 

 

HOT BRIQUETTED IRON

Production ('000 tonnes)

Boodarie™ Iron

100%

291

177

276

386

384

770

396

 

 

 

 

 

 

 

 

 

 

 

STAINLESS STEEL MATERIALS

NICKEL

Production ('000 tonnes)

CMSA

99.8%

6.9

9.4

9.1

9.6

10.4

20.0

13.3

Yabulu

100%

7.5

7.4

7.7

6.3

7.1

13.4

13.9

Total

14.4

16.8

16.8

15.9

17.5

33.4

27.2

 

 

 

 

 

 

 

 

 

 

 

CHROME ORES

Saleable production ('000 tonnes)

South Africa (k)

60%

898

674

665

629

609

1,238

1,819

 

 

 

 

 

 

 

 

 

 

 

FERROCHROME

Saleable production ('000 tonnes)

South Africa (k)

60%

249

192

194

207

206

413

522

 

 

 

 

 

 

 

 

 

 

 

ENERGY COAL

 

Production ('000 tonnes)

South Africa

100%

17,811

14,379

14,571

14,538

13,724

28,262

32,372

USA

100%

3,962

3,993

3,890

3,106

3,170

6,276

7,042

Australia

100%

1,227

1,512

1,329

1,173

863

2,036

2,462

Indonesia (l)

80%

2,134

2,035

2,291

2,450

1,778

4,228

4,100

Colombia (m)

17%-33%

687

1,091

1,053

1,138

1,088

2,226

687

Total

25,821

23,010

23,134

22,405

20,623

43,028

46,663

 

 

 

 

 

 

 

 

 

 

 

PETROLEUM

 

Production

Crude oil & condensate

(000 bbl)

20,000

19,911

18,378

19,492

19,747

39,239

40,817

Natural gas

(bcf)

60.83

67.61

71.64

71.24

76.23

147.47

122.58

LPG

('000 tonnes)

155.04

170.62

175.60

182.71

173.01

355.72

327.81

Ethane

('000 tonnes)

9.98

15.69

18.53

24.05

18.59

42.64

33.17

 

 

 

 

 

 

 

 

 

 

 

BHP STEEL

 

Production ('000 tonnes)

Raw steel

100%

1,372

1,277

1,328

1,382

1,262

2,644

2,827

Marketable steel products

100%

1,268

1,345

1,469

1,377

1,169

2,546

2,693

 

 

 

 

 

 

 

 

 

 

 

EXPLORATION, TECH & NEW BUSINESS

DIAMONDS

Production ('000 carats)

Ekati™ (n)

80%

318

375

427

767

928

1,695

627

 

 

 

 

 

 

 

 

 

 

 

(a) Interest in Worsley increased from 30% to 86% effective January 2001.

(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000.

(c) Metal production is reported on the basis of payable metal.

(d) Ok Tedi data shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001

that no profit would be recognised for Ok Tedi from 1 July 2001 except to the extent that dividends are received.

Accordingly, Ok Tedi September 2001 and December 2001 quarter copper production (100% basis) of 48,200 tonnes and

43,800 tonnes respectively and gold production of 104,855 ounces and 98,210 ounces respectively has not been recognised.

(e) Included from 1 October 2000, the effective date of the acquisition of Rio Algom. Antamina commenced commercial

production in October 2001.

(f) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(g) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%).

(h) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP Billiton and

Mitsubishi Development Pty Ltd.

(i) Shown on 100% basis before 20% outside equity interest.

(j) Production reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is equally owned by

BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited (QCT) in November 2000. In June 2001,

Mitsubishi acquired the balance of the shares in QCT from BHP Billiton.

(k) Shown on 100% basis. BHP Billiton interest in saleable production is 60%.

(l) Production shown on 86.5% basis after allowing for Indonesian state owned corporation's 13.5% share of production.

BHP Billiton sold its interest in the Senakin and Satui mines effective 30 November 2001.

(m) Carbonnes del Cerrejon (BHP Billiton 33.3%) and Cerrejon Zona Norte (BHP Billiton 16.7%) were acquired in September 2000

and November 2000 respectively.

(n) Interest in Ekati™ increased from 51% to 80% effective July 2001.

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

ALUMINIUM

 

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

ALUMINA

Production

Worsley, Australia (a)

211

541

674

662

671

1,333

417

Paranam, Suriname

215

213

211

219

209

428

428

Alumar, Brazil

107

114

113

83

85

168

227

Total

533

868

998

964

965

1,929

1,072

Sales

Worsley, Australia (a)

205

388

725

692

638

1,330

390

Paranam, Suriname

194

224

186

224

221

445

408

Alumar, Brazil

116

120

116

79

88

167

226

Total

515

732

1,027

995

947

1,942

1,024

(a) Interest in Worsley increased from 30% to 86% effective January 2001.

 

 

 

 

 

 

 

 

 

 

 

ALUMINIUM

Production

Hillside, South Africa

127

122

123

125

117

242

253

Bayside, South Africa

45

44

43

44

45

89

91

Alumar, Brazil

44

42

43

35

32

67

87

Valesul, Brazil

12

11

9

8

9

17

23

Mozal, Mozambique (b)

23

31

32

32

32

64

30

Total

251

250

250

244

235

479

484

Sales

Hillside, South Africa

127

121

124

123

117

240

253

Bayside, South Africa

46

42

50

43

43

86

87

Alumar, Brazil

43

41

45

34

33

67

85

Valesul, Brazil

11

7

12

8

8

16

22

Mozal, Mozambique (b)

20

32

33

32

32

64

25

Total

247

243

264

240

233

473

472

(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000.

 

 

 

 

 

 

 

 

 

 

 

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

BASE METALS

 

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

Escondida, Chile

Material mined (100%)

('000 tonnes)

77,436

74,691

77,115

85,344

84,821

170,164

152,994

Sulphide ore milled (100%)

('000 tonnes)

11,534

11,128

10,650

11,205

10,060

21,265

23,893

Average copper grade

(%)

1.94%

1.95%

1.82%

1.75%

1.72%

1.74%

1.89%

Production ex Mill (100%)

('000 tonnes)

190.4

176.4

159.5

162.0

144.4

306.3

389.9

Production

Payable copper

('000 tonnes)

105.8

98.3

89.1

89.3

80.1

169.5

215.3

Payable gold concentrate

(fine ounces)

13,270

10,582

10,302

10,641

12,166

22,807

28,713

Copper cathode (SXEW)

('000 tonnes)

20.5

21.0

22.0

21.9

21.9

43.8

40.4

Sales

Payable copper

('000 tonnes)

118.0

109.5

88.3

83.8

87.0

170.7

202.6

Payable gold concentrate

(fine ounces)

15,279

11,692

9,780

8,729

12,386

21,115

27,552

Copper cathode (SXEW)

('000 tonnes)

19.8

21.8

23.1

22.9

18.0

40.8

41.9

 

 

 

 

 

 

 

 

 

 

 

OK Tedi, Papua New Guinea (a)

Material mined

('000 tonnes)

22,673

22,244

22,482

-

-

-

44,972

Ore milled

('000 tonnes)

8,286

8,250

8,116

-

-

-

15,657

Average head grades

- Copper

(%)

0.91%

0.85%

0.92%

-

-

-

0.92%

- Gold

(g/t)

0.77

0.70

0.82

-

-

-

0.88

Production

Payable copper

('000 tonnes)

54.1

51.7

53.4

-

-

-

103.9

Payable gold concentrate

(fine ounces)

127,049

115,576

124,729

-

-

-

267,797

Sales

Payable copper

('000 tonnes)

53.5

53.4

67.5

-

-

-

89.6

Payable gold concentrate

(fine ounces)

135,494

113,760

156,860

-

-

-

235,975

(a) Ok Tedi data shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001

that no profit would be recognised for Ok Tedi from 1 July 2001 except to the extent that dividends are received.

Accordingly, Ok Tedi September 2001 and December 2001 quarter copper production (100% basis) of 48,200 tonnes and

43,800 tonnes respectively and gold production of 104,855 ounces and 98,210 ounces respectively has not been recognised.

 

 

 

 

 

 

 

 

 

 

 

Tintaya, Peru

Material mined

('000 tonnes)

16,723

14,566

16,447

17,600

14,115

31,715

33,117

Ore milled

('000 tonnes)

1,744

1,429

1,508

1,640

1,569

3,209

3,364

Average copper grade

(%)

1.56%

1.47%

1.56%

1.58%

1.72%

1.65%

1.56%

Production

Payable copper

('000 tonnes)

24.0

18.4

20.1

20.9

22.9

43.8

46.5

Payable gold concentrate

(fine ounces)

4,638

5,146

7,693

10,249

11,500

21,749

11,585

Sales

Payable copper

('000 tonnes)

24.5

12.1

32.0

19.2

17.8

37.0

42.2

 

Payable gold concentrate

(fine ounces)

5,149

3,125

10,350

9,745

9,546

 

19,291

12,943

Cerro Colorado, Chile (a)

Material mined

('000 tonnes)

14,957

13,342

14,177

13,595

16,677

30,272

14,957

Ore milled

('000 tonnes)

3,264

3,479

3,546

3,517

3,894

7,411

3,264

Average copper grade

(%)

1.08%

1.09%

1.09%

1.08%

1.13%

1.11%

1.08%

Production

Copper cathode

('000 tonnes)

31.0

32.0

33.8

34.0

33.8

67.8

31.0

Sales

Copper cathode

('000 tonnes)

30.4

32.8

33.6

34.0

31.7

65.7

30.4

 

(a) Cerro Colorado (BHP Billiton 100%) included from 1 October 2000, the effective date of the acquisition of Rio Algom.

 

Antamina, Peru (a)

Material mined (100%)

('000 tonnes)

22,589

22,589

Ore milled (100%)

('000 tonnes)

6,318

6,318

Average head grades

- Copper

(%)

1.32%

1.32%

- Zinc

(%)

2.03%

2.03%

- Silver

(g/t)

223

223

Production

Payable copper

('000 tonnes)

26.5

26.5

Payable zinc

(tonnes)

16,010

16,010

Payable silver

('000 ounces)

690

690

Sales

Payable copper

('000 tonnes)

28.7

28.7

Payable zinc

(tonnes)

8,983

8,983

Payable silver

('000 ounces)

596

596

(a) BHP Billiton acquired its 33.8% interest in Antamina in October 2000 as part of the acquisition of Rio Algom. Commercial

production commenced on 1 October 2001.

 

 

 

 

 

 

 

 

 

 

 

Alumbrera, Argentina (a)

Material mined (100%)

('000 tonnes)

27,823

25,829

27,182

29,545

28,635

58,180

27,823

Ore milled (100%)

('000 tonnes)

7,097

7,041

7,445

7,516

7,142

14,658

7,097

Average head grades

- Copper

(%)

0.64%

0.71%

0.74%

0.70%

0.74%

0.72%

0.64%

- Gold

(g/t)

0.8

0.8

1.0

1.0

1.1

1.0

0.8

Production

Payable copper

('000 tonnes)

9.9

10.8

11.9

11.6

12.0

23.6

9.9

Payable gold

(fine ounces)

30,094

30,579

39,922

40,370

42,978

83,348

30,094

Payable gold - dore

(fine ounces)

1,919

1,368

2,283

2,214

2,589

4,803

1,919

Sales

Payable copper

('000 tonnes)

8.4

9.5

14.2

9.8

13.1

22.9

8.4

Payable gold

(fine ounces)

26,819

27,635

45,999

34,461

48,223

82,684

26,819

Payable gold - dore

(fine ounces)

1,907

1,934

2,138

2,009

1,829

3,838

1,907

(a) Alumbrera (BHP Billiton 25%) included from 1 October 2000, the effective date of the acquisition of Rio Algom.

 

 

 

 

 

 

 

 

 

 

 

Highland Valley, Canada (a)

Material mined (100%)

('000 tonnes)

21,203

19,104

18,988

19,911

20,883

40,794

21,203

Ore milled (100%)

('000 tonnes)

13,155

11,784

11,355

12,841

12,912

25,753

13,155

Average copper grade

(%)

0.42%

0.43%

0.43%

0.43%

0.42%

0.42%

0.42%

Production

Payable copper

('000 tonnes)

16.1

14.8

14.1

16.1

16.0

32.1

16.1

Payable Molybdenum

('000 tonnes)

0.14

0.12

0.12

0.15

0.15

0.30

0.14

Sales

Payable copper

('000 tonnes)

10.5

10.7

11.6

23.2

18.8

42.0

10.5

Payable Molybdenum

('000 tonnes)

0.21

0.18

0.14

0.14

0.10

0.24

0.21

(a) Highland Valley (BHP Billiton 33.6%) included from 1 October 2000, the effective date of the acquisition of Rio Algom.

 

 

 

 

 

 

 

 

 

 

 

Cannington, Australia

Material mined

('000 tonnes)

460

464

507

543

555

1,098

890

Ore milled

('000 tonnes)

461

422

490

496

538

1,034

869

Average head grades

- Silver

(g/t)

606

539

577

598

567

582

641

- Lead

(%)

12.8%

12.7%

13.2%

13.2%

12.1%

12.6%

13.6%

- Zinc

(%)

5.6%

5.5%

5.5%

4.8%

5.3%

5.0%

5.3%

Production

Payable silver

('000 ounces)

7,591

6,462

7,806

7,804

7,915

15,719

15,220

Payable lead

(tonnes)

49,503

45,228

54,271

52,879

51,914

104,793

100,830

Payable zinc

(tonnes)

17,994

15,877

17,176

14,058

17,285

31,343

31,141

Sales

Payable silver

('000 ounces)

6,583

8,107

8,681

7,231

8,045

15,276

13,571

Payable lead

(tonnes)

43,036

55,949

61,243

49,423

52,577

102,000

89,115

Payable zinc

(tonnes)

13,262

20,588

17,496

13,220

17,850

31,070

24,943

 

 

 

 

 

 

 

 

 

 

 

Selbaie, Canada

Ore milled

('000 tonnes)

933

902

896

1,006

1,029

2,035

2,211

Average head grades

- Zinc

(%)

1.54%

1.57%

1.42%

1.50%

1.29%

1.39%

1.56%

- Copper

(%)

0.43%

0.46%

0.42%

0.34%

0.34%

0.34%

0.43%

- Gold

(g/t)

0.43

0.40

0.42

0.34

0.24

0.29

0.47

- Silver

(g/t)

29.05

25.22

18.12

25.02

37.23

31.19

28.09

Production

Payable zinc

(tonnes)

10,312

8,868

7,969

9,456

8,106

17,562

21,671

Payable copper

(tonnes)

3,183

3,279

2,872

2,470

2,668

5,138

6,573

Payable gold concentrate

(ounces)

9,344

8,472

8,198

6,207

4,929

11,136

21,245

Payable silver

('000 ounces)

469

362

259

379

676

1,055

915

Sales

Payable zinc

(tonnes)

9,780

9,110

8,406

9,959

7,932

17,891

19,163

Payable copper

(tonnes)

3,390

3,260

3,035

3,196

2,615

5,811

6,373

Payable gold concentrate

(ounces)

11,777

10,177

8,207

8,112

8,002

16,114

18,059

Payable silver

('000 ounces)

494

445

405

284

321

605

1,029

 

 

 

 

 

 

 

 

 

 

 

Pering, South Africa

Ore milled

('000 tonnes)

336

327

345

339

342

681

672

Average head grades

- Zinc

(%)

2.22%

2.03%

2.09%

2.00%

1.90%

1.96%

2.12%

- Lead

(%)

0.68%

0.55%

0.60%

0.49%

0.54%

0.52%

0.68%

Production

Payable zinc

(tonnes)

5,498

5,010

5,397

5,888

5,318

11,206

10,503

Payable lead

(tonnes)

1,601

1,320

1,486

1,153

1,298

2,451

3,217

Sales

Payable zinc

(tonnes)

4,990

5,170

5,060

4,900

4,859

9,759

9,917

Payable lead

(tonnes)

1,250

1,590

1,490

1,336

1,217

2,553

2,952

 

 

 

 

 

 

 

 

 

 

 

San Manuel, USA

Production

Copper cathode (SXEW)

('000 tonnes)

2.6

2.5

2.3

2.3

2.2

4.5

5.4

 

 

 

 

 

 

 

 

 

 

 

Pinto Valley, USA

Production

 

Copper cathode (SXEW)

('000 tonnes)

4.4

3.9

3.8

3.4

3.4

 

6.8

8.7

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

CARBON STEEL MATERIALS

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

IRON ORE (a)

Pilbara, Australia

Production

Mt Newman Joint Venture

5,500

4,591

5,239

5,973

6,423

12,396

11,120

Goldsworthy Joint Venture

1,730

1,453

1,788

1,656

1,667

3,323

3,360

Yandi Joint Venture

5,840

6,354

6,882

7,046

6,933

13,979

12,920

Jimblebar

1,250

991

1,272

1,182

1,332

2,514

2,380

Total (BHP Billiton share)

14,320

13,389

15,181

15,858

16,355

32,213

29,780

Total production (100%)

16,626

15,577

17,636

18,448

19,006

37,453

34,615

Shipments

Lump

3,730

3,950

3,823

3,729

3,483

7,212

7,670

Fines

11,400

11,171

11,545

12,334

12,025

24,359

22,440

Total (BHP Billiton share)

15,130

15,121

15,368

16,063

15,508

31,571

30,110

Total shipments (100%)

17,798

17,789

18,080

18,897

18,245

37,142

35,420

(a) Iron ore production and shipments are reported on a wet tonnes basis.

 

 

 

 

 

 

 

 

 

 

 

Samarco, Brazil

Production

1,910

1,885

1,893

1,223

928

2,151

3,730

Shipments

2,150

1,699

1,460

1,156

1,440

2,596

3,820

 

 

 

 

 

 

 

 

 

 

 

METALLURGICAL COAL (a)

Queensland, Australia

Production

CQCA Joint Venture (b)

Blackwater

1,076

1,066

1,130

977

1,305

2,282

2,132

Goonyella

965

967

1,122

986

850

1,836

1,889

Peak Downs

886

571

779

885

730

1,615

1,779

Saraji

433

504

530

627

528

1,155

1,041

Norwich Park

434

411

503

527

495

1,022

914

CQCA total

3,794

3,519

4,064

4,002

3,908

7,910

7,755

South Blackwater (c)

-

-

-

670

524

1,194

-

Gregory Joint Venture (b)

970

845

960

486

408

894

1,821

BHP Mitsui Coal (d)

Riverside

727

834

966

917

649

1,567

1,472

South Walker Creek

798

844

836

906

817

1,723

1,467

BHP Mitsui Coal total

1,525

1,678

1,802

1,823

1,467

3,290

2,939

Queensland total

6,289

6,042

6,826

6,980

6,307

13,288

12,515

Shipments

Coking coal

4,669

4,401

4,813

4,804

4,011

8,815

9,223

Weak coking coal

1,466

1,138

1,245

1,592

1,674

3,267

2,531

Thermal coal

657

474

624

631

704

1,335

1,290

Total

6,792

6,013

6,682

7,027

6,390

13,417

13,044

(a) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(b) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%).

(c) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP Billiton and

Mitsubishi Development Pty Ltd.

(d) BHP Mitsui Coal production shown on 100% basis before 20% outside equity interest.

 

 

 

 

 

 

 

 

 

 

 

QCT Resources, Australia (a)

Production

CQCA

732

1,093

1,263

-

-

-

732

Gregory Joint Venture

173

213

242

-

-

-

173

South Blackwater

355

531

582

-

-

-

355

Total

1,260

1,837

2,087

-

-

-

1,260

Shipments

Coking coal

876

1,633

1,476

-

-

-

876

Weak coking coal

146

227

231

-

-

-

146

Thermal coal

245

209

268

-

-

-

245

Total

1,267

2,069

1,975

-

-

-

1,267

(a) Production and shipments reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is

equally owned by BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited (QCT) in November 2000.

In June 2001, Mitsubishi acquired the balance of the shares in QCT from BHP Billiton.

 

 

 

 

 

 

 

 

 

 

 

Illawarra, Australia

Production

1,328

1,619

1,889

2,055

1,841

3,896

3,066

Shipments

Coking coal

1,512

1,410

1,686

1,457

1,655

3,112

2,838

Thermal coal

165

67

246

136

94

230

293

Total

1,677

1,477

1,932

1,593

1,749

3,342

3,131

 

 

 

 

 

 

 

 

 

 

 

MANGANESE ORES

South Africa

Saleable production (a)

579

538

490

467

501

968

1,134

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

 

 

 

 

 

 

 

 

 

 

 

Australia

Saleable production (a)

318

379

446

505

387

892

787

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

 

 

 

 

 

 

 

 

 

 

 

MANGANESE ALLOYS

South Africa

Saleable production (a)

106

96

85

69

101

170

217

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

 

 

 

 

 

 

 

 

 

 

 

Australia

Saleable production (a)

67

64

51

50

63

113

131

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

 

 

 

 

 

 

 

 

 

 

 

HOT BRIQUETTED IRON

Boodarie™ Iron, Australia

Production

291

177

276

386

384

770

396

Shipments

107

238

342

358

302

660

161

 

 

 

 

 

 

 

 

 

 

 

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

STAINLESS STEEL MATERIALS

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

NICKEL

CMSA, Colombia

Production

6.9

9.4

9.1

9.6

10.4

20.0

13.3

Sales

5.5

8.8

10.2

9.1

10.4

19.5

11.9

 

 

 

 

 

 

 

 

 

 

 

Yabulu, Australia

Production

Nickel

7.5

7.4

7.7

6.3

7.1

13.4

13.9

Cobalt

0.4

0.5

0.5

0.4

0.4

0.8

0.8

Sales

Nickel

6.3

6.5

8.2

7.7

6.9

14.6

12.6

Cobalt

0.4

0.4

0.4

0.4

0.5

0.9

0.8

 

 

 

 

 

 

 

 

 

 

 

CHROME ORES

South Africa

Saleable production (a)

898

674

665

629

609

1,238

1,819

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

 

 

 

 

 

 

 

 

 

 

 

FERROCHROME

South Africa

Saleable production (a)

249

192

194

207

206

413

522

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

 

 

 

 

 

 

 

 

 

 

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

ENERGY COAL

 

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

Ingwe, South Africa

Production

17,811

14,379

14,571

14,538

13,724

28,262

32,372

Sales

Export

6,489

6,164

6,557

6,289

6,083

12,372

13,058

Local utility

10,273

6,957

6,821

7,477

6,780

14,257

17,371

Inland

1,473

1,207

1,110

1,092

1,111

2,203

2,690

Total

18,235

14,328

14,488

14,858

13,974

28,832

33,119

 

 

 

 

 

 

 

 

 

 

 

New Mexico, USA

Production

Navajo Coal

2,119

1,838

2,170

1,694

1,682

3,376

3,663

San Juan Coal

1,843

2,155

1,720

1,412

1,488

2,900

3,379

Total

3,962

3,993

3,890

3,106

3,170

6,276

7,042

Sales - local utility

3,565

3,566

3,434

3,407

3,489

6,896

7,350

 

 

 

 

 

 

 

 

 

 

 

COAL, Australia

Production

1,227

1,512

1,329

1,173

863

2,036

2,462

Sales

Export

685

1,190

1,201

604

571

1,175

1,634

Inland

235

396

399

398

378

776

627

Total

920

1,586

1,600

1,002

949

1,951

2,261

 

 

 

 

 

 

 

 

 

 

 

Kalimantan, Indonesia (a)

Production

Senakin (b)

1,050

924

1,099

1,161

801

1,962

1,955

Satui (b)

871

926

981

1,068

777

1,845

1,689

Petangis

213

185

211

221

201

422

456

Total

2,134

2,035

2,291

2,450

1,778

4,228

4,100

Sales - export

2,049

1,942

2,308

2,312

1,684

3,996

4,124

(a) Reported on 86.5% basis after allowing for the Indonesian state-owned corporation's 13.5% share of all production.

(b) BHP Billiton sold its interest in Senakin and Satui effective 30 November 2001.

 

 

 

 

 

 

 

 

 

 

 

CDC & CZN, Colombia (a)

Production

687

1,091

1,053

1,138

1,088

2,226

687

Sales - export

676

1,102

959

1,098

688

1,786

676

(a) Carbonnes del Cerrejon (BHP Billiton 33.3%) and Cerrejon Zona Norte (BHP Billiton 16.7%) were acquired in September 2000

and November 2000 respectively.

 

 

 

 

 

 

 

 

 

 

 

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

PETROLEUM

 

BHP Billiton attributable production unless otherwise stated.

CRUDE OIL & CONDENSATE ('000 barrels)

Bass Strait

7,096

6,990

6,946

7,387

7,197

14,584

14,900

North West Shelf - condensate

1,144

1,240

1,239

1,331

1,310

2,641

2,369

North West Shelf - Wanaea/Cossack

1,885

1,820

1,757

1,652

1,919

3,571

3,567

Laminaria

3,875

3,533

3,076

3,001

2,569

5,570

8,244

Buffalo (a)

763

-

-

-

-

-

1,520

Griffin

1,714

2,241

1,194

1,037

863

1,900

3,705

Pakistan (b)

-

3

14

17

19

36

-

Typhoon (c)

-

-

-

835

1,443

2,278

-

Americas

944

941

958

918

919

1,837

1,770

Liverpool Bay

1,978

2,469

2,516

2,830

2,868

5,698

3,694

Bruce/Keith (d)

601

674

678

483

640

1,123

1,048

Total

20,000

19,911

18,378

19,492

19,747

39,239

40,817

NATURAL GAS (billion cubic feet)

Bass Strait

18.96

22.91

26.75

30.05

23.14

53.19

46.74

North West Shelf - Domestic

3.28

3.29

3.81

3.68

3.73

7.41

6.41

North West Shelf - LNG

13.83

14.24

13.47

15.76

15.56

31.32

29.02

Griffin

0.82

0.73

0.84

1.35

1.25

2.60

1.57

Pakistan (b)

-

0.40

2.03

2.66

2.83

5.49

-

Typhoon (c)

-

-

-

0.67

1.48

2.15

-

Americas

5.38

5.19

5.52

5.41

5.45

10.86

10.59

Bruce

9.38

10.43

7.59

3.28

10.65

13.93

14.39

Keith (d)

0.11

0.24

0.25

0.19

0.27

0.46

0.11

Liverpool Bay

9.07

10.18

11.38

8.19

11.87

20.06

13.75

Total

60.83

67.61

71.64

71.24

76.23

147.47

122.58

LPG ('000 tonnes)

Bass Strait

95.70

113.21

117.66

128.52

107.80

236.32

223.85

North West Shelf

30.69

30.44

31.65

36.32

35.53

71.85

62.17

Griffin

1.50

0.51

-

-

-

-

3.07

Bruce

26.72

23.01

24.85

16.51

28.50

45.01

38.29

Keith (d)

0.43

3.45

1.44

1.36

1.18

2.54

0.43

Total

155.04

170.62

175.60

182.71

173.01

355.72

327.81

ETHANE ('000 tonnes)

9.98

15.69

18.53

24.05

18.59

42.64

33.17

(a) Buffalo sold effective September 2000.

(b) Zamzama extended well test commenced in March 2001.

(c) Typhoon commenced production in July 2001.

(d) Keith commenced production in November 2000.

 

 

 

 

 

 

 

 

 

 

 

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

BHP STEEL

 

BHP Billiton attributable production unless otherwise stated.

('000 tonnes)

PRODUCTION

Iron Sands

NZS, New Zealand

712

274

478

397

464

861

1,435

Coke

Port Kembla, Australia

599

578

643

661

620

1,281

1,215

Iron

Port Kembla, Australia

1,231

1,177

1,269

1,262

1,191

2,453

2,529

Raw Steel

Port Kembla, Australia

1,226

1,120

1,176

1,238

1,109

2,347

2,534

NZS, New Zealand

146

157

152

144

153

297

293

Total

1,372

1,277

1,328

1,382

1,262

2,644

2,827

Delta, Ohio (a)

186

190

197

196

196

392

379

Marketable Steel Products

Flat Products

Flat and Tinplate products

1,152

1,094

1,183

1,183

1,054

2,237

2,394

Coated Products

Rolled and coated products

464

462

474

533

400

933

995

Flat and coated products (NZS)

125

139

135

137

117

254

262

Rolled and coated products (offshore)

98

81

89

69

70

139

168

Building products (includes offshore)

34

42

42

40

36

76

74

Total (b)

1,268

1,345

1,469

1,377

1,169

2,546

2,693

Delta, Ohio (a)

182

186

193

192

192

384

371

DESPATCHES (c)

Business unit despatches

Flat Products

1,069

1,098

1,294

1,128

996

2,124

2,312

Coated Products

691

666

813

746

657

1,403

1,423

Total (d)

1,237

1,282

1,587

1,296

1,153

2,449

2,473

External despatches

Australia

Domestic (e)

503

515

585

691

569

1,260

988

Export

515

546

757

387

391

778

1,056

New Zealand

Domestic (e)

62

56

55

61

56

117

129

Export

55

77

97

83

67

150

123

Other offshore

102

88

93

74

70

144

177

Total

1,237

1,282

1,587

1,296

1,153

2,449

2,473

Delta, Ohio (a)

177

190

191

191

189

380

367

(a) Production and despatches reported is that proportion determined by BHP Steel's equity interest in North Star BHP LLC (50%).

(b) Total excludes production for intra-business sales. Therefore, the total figure is less than the sum of the individual businesses.

(c) Steel products only. Excludes pig iron and by-products.

(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses.

(e) Includes despatches to OneSteel Limited from 1 November 2000.

 

 

 

 

 

 

 

 

 

 

 

 

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

EXPLORATION, TECHNOLOGY & NEW BUSINESS

BHP Billiton attributable production and sales unless otherwise stated.

DIAMONDS

Ekati™, Canada

Production (a)

('000 carats)

318

375

427

767

928

1,695

627

(a) Interest in Ekati™ increased from 51% to 80% effective July 2001.

 

 

 

 

 

 

 

 

 

 

 

PRODUCTION AND SHIPMENT REPORT

 

 

 

 

 

 

 

QUARTER ENDED

HALF YEAR ENDED

DEC

MARCH

JUNE

SEPT

DEC

DEC

DEC

 

 

 

2000

2001

2001

2001

2001

 

2001

2000

STEEL - DISCONTINUED OPERATIONS (a)

BHP Billiton attributable production unless otherwise stated.

('000 tonnes)

PRODUCTION

Iron Ore

Whyalla, Australia

254

-

-

-

-

-

910

Coke

Whyalla, Australia

49

-

-

-

-

-

198

Iron

Whyalla, Australia

102

-

-

-

-

-

372

Raw Steel

Whyalla, Australia

99

-

-

-

-

-

344

Newcastle, Australia

-

-

-

-

-

-

-

Sydney, Australia

36

-

-

-

-

-

164

Total

135

-

-

-

-

-

508

Marketable Steel Products

Long products

171

-

-

-

-

-

722

Other offshore (USA) (b)

-

-

-

-

-

-

-

Total (b)

171

-

-

-

-

-

711

DESPATCHES (c)

Business unit despatches

Long Products

166

-

-

-

-

-

693

Other offshore (USA) (b)

-

-

-

-

-

-

-

Total (d)

166

-

-

-

-

-

693

External despatches

Australia

Domestic

150

-

-

-

-

-

632

Export

16

-

-

-

-

-

61

Other offshore (USA) (b)

-

-

-

-

-

-

-

Total

166

-

-

-

-

-

693

(a) Data tables reflect the spin-out of OneSteel Limited from BHP Billiton effective 31 October 2000.

(b) US steel businesses were sold in June 2000.

(c) Steel products only. Excludes pig iron and by-products.

(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses.

 

 

 

 

 

 

 

 

 

 

 

BHP Billiton Limited ABN 49 004 028  077
Registered in Australia
Registered Office: 600 Bourke Street Melbourne Victoria 3000
Telephone +61 3 9609 3333 Facsimile +61 3 9609 3015

BHP Billiton Plc Registration number 3196209
Registered in England and Wales
Registered Office: 1-3 Strand London WC2N 5HA United Kingdom
Telephone +44 20 7747 3800 Facsimile +44 20 7747 3900

The BHP Billiton Group is headquartered in Australia