Form 6-K
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
From: May 15, 2009
IVANHOE MINES LTD.
(Translation of Registrants Name into English)
Suite 654 999 CANADA PLACE, VANCOUVER, BRITISH COLUMBIA V6C 3E1
(Address of Principal Executive Offices)
(Indicate by check mark whether the registrant files or will file annual reports under cover of
Form 20-F or Form 40-F.)
Form 20-F- o Form 40-F- þ
(Indicate by check mark whether the registrant by furnishing the information contained in this form
is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the
Securities Exchange Act of 1934.)
Yes: o No: þ
(If Yes is marked, indicate below the file number assigned to the registrant in connection with
Rule 12g3-2(b): 82-_____.)
Enclosed:
Press release
|
|
|
|
|
|
|
|
May 15, 2009 |
IVANHOE MINES ANNOUNCES FINANCIAL RESULTS
AND REVIEW OF OPERATIONS FOR THE FIRST QUARTER OF 2009
High-grade molybdenum and rhenium deposit discovered
by subsidiary Ivanhoe Australia
SINGAPORE Ivanhoe Mines Ltd. today announced its results for the quarter ended March 31, 2009.
All figures are in US dollars, unless otherwise stated.
HIGHLIGHTS
|
|
|
During the quarter, Ivanhoes 83%-owned subsidiary, Ivanhoe Australia (IVA ASX),
announced the discovery of a high-grade molybdenum and rhenium deposit at its Merlin
Project on its Cloncurry tenements in northwestern Queensland. A scoping study of mine
development options is underway. Rhenium is used in super-strength aerospace alloys, while
molybdenum is mainly used as an alloy in stainless steels and in alloy steels. |
|
|
|
|
On April 16, 2009, Ivanhoe Australia made a significant gold-focused investment by
purchasing an initial 10% equity stake in Emmerson Resources, with the opportunity to
increase this to 19.9%. Ivanhoe also entered into a joint venture covering all of
Emmersons tenements in the Tennant Creek Mineral Field. This field is one of the richest
and largest Proterozoic goldfields in Australia with historical production of more than 5.5
million ounces of high-grade gold and approximately 488,000 tonnes of copper. |
|
|
|
|
Ivanhoes 80%-owned subsidiary, SouthGobi Energy Resources (SGQ TSX.V), reported coal
sales of $3.5 million from its Ovoot Tolgoi mine in southern Mongolia, representing
approximately 127,000 tonnes of coal sold to customers in China. In another Asian coal
venture, SouthGobi is preparing to begin trial shipments to customers in Asia of an initial
30,000 tonnes of high-quality metallurgical coal from the new Mamahak Project in East
Kalimantan, Indonesia. |
|
|
|
|
In February 2009, Ivanhoe Mines and its strategic partner, Rio Tinto, negotiated a draft
Investment Agreement with a new Working Group appointed by the Mongolian Government. An
agreement is required to begin construction of the Oyu Tolgoi copper-gold mining complex. |
|
|
|
|
The draft Investment Agreement and a companion Shareholders Agreement was approved in
principle by the Cabinet and the National Security Council and was introduced into the
State Great Khural, Mongolias national Parliament, in March. The parliamentary review
process is continuing. |
|
|
|
|
In Q109, Ivanhoe Mines expensed $37.4 million in exploration and development
activities, compared to $57.3 million in Q108. In Q109, Ivanhoe Mines exploration
activities were largely focused in Mongolia and Australia. |
MONGOLIA: OYU TOLGOI COPPER-GOLD PROJECT
Oyu Tolgoi awaiting an approved Investment Agreement
In January 2009, Ivanhoe Mines and Rio Tinto re-started negotiations with a newly formed Government
Working Group for a competitive Investment Agreement that would recognize the realities of the
current international investment environment and the economic benefits inherent in the development
of the Oyu Tolgoi Project.
Mongolian law provides for the completion of Investment Agreements to establish long-term stability
of taxation and other fiscal policies and assurances regarding the operational environment
necessary for new mine developments. An Investment Agreement for Oyu Tolgoi requires the approval
of the State Great Khural, which is Mongolias national Parliament.
In late February 2009, the negotiators reached agreement on an acceptable draft Investment
Agreement and a companion Shareholders Agreement. The draft agreements were reviewed and approved
in principle by the Cabinet and the National Security Council. Following the completion of
negotiations, each page of the draft Investment Agreement was initialled by representatives of both
the Mongolian Cabinet and Ivanhoe Mines Mongolia Inc. LLC before the document was presented to
Parliament in March as part of the final approval process. The parliamentary review process has
continued into May.
Ivanhoe Mines and Rio Tinto remain prepared to complete an Investment Agreement with the Government
that is equitable and fair for both sides. The companies also are continuing to assess the
implications for the Oyu Tolgoi Project and its development schedule as a result of the delays in
approval of the Investment Agreement and Shareholders Agreement that have been experienced in
Mongolia, the sharp declines in certain commodity prices and continuing uncertainty in
international financial markets.
Engineering and development advancing in readiness for mine construction
During Q109, the engineering and development team remained focused on maintaining the Oyu Tolgoi
Project in a position to commence construction once an Investment Agreement is finalized.
There was limited underground work at site during Q109. The main activity was preparation for the
first ventilation raise (a vertical connection from underground to surface), to supply fresh air
from surface to the underground workings. Other site work was focused on maintaining facilities and
supporting the limited underground and exploration activities.
Ivanhoe Mines has continued to advance mine planning, engineering and will prepare an update to the
Oyu Tolgoi Projects Integrated Development Plan once an acceptable Investment Agreement has been
negotiated with the Government of Mongolia and approved by all parties including the Board of
Directors of Ivanhoe Mines.
2
MONGOLIA: COAL PROJECTS
SOUTHGOBI ENERGY RESOURCES (80% owned)
SouthGobi Energys Ovoot Tolgoi coal mine in production
SouthGobi is producing and selling coal at its Ovoot Tolgoi Project in southern Mongolias Gobi
region, 45 kilometres north of Mongolias border with China.
SouthGobi recognized revenue of $3.5 million in Q109, representing approximately 127,000 tonnes of
coal sold at an average realized price at the mine gate of approximately $29 per tonne.
SouthGobis Q109 sales were impacted by difficulties expediting the movement of its coal shipments
across the Mongolia-China border due to sporadic openings at the Ceke crossing. The border crossing
operated only five days a week, on dayshift, during January and February this year, greatly
limiting the volume of coal that SouthGobi was able to sell to customers in China. As a result,
SouthGobi curtailed production to a dayshift in January 2009. This was followed by a mine shut
down February 24, although crews continued loading stockpiled coal into customers trucks. In
March 2009, the border point began operating eight hours a day, seven days a week, which enabled
the shipment of more than 115,000 tonnes of coal during the month. SouthGobi expects to be in a
position to resume mining operations at Ovoot Tolgoi in the near future if the border crossing
maintains its current openings. SouthGobi is in talks with the Mongolian Government to keep the
border open 24 hours a day year round.
SouthGobi recorded cost of sales of $3.2 million in Q109, comprised of the cost of the product
sold, mine administration costs, equipment depreciation and depletion of stripping costs. Total
cash costs per tonne of product sold in Q109 were $18.51 compared to $14.09 in Q408. The increase
was due to operational costs of approximately $4.00 per tonne that were expensed in Q109 due to
the mine being shut down in February 2009. During Q109, the total waste mined was 344,850 Bank
Cubic Meters (BCM) and the total coal mined was 157,115 tonnes at a strip ratio of approximately
2.19 BCM waste per tonne of saleable coal. Of the total coal mined, approximately 47,000 tonnes
were oxidized steam coal and 110,000 tonnes were premium coal.
In 2008, SouthGobi ordered a second fleet of coal-mining equipment to expand Ovoot Tolgois
production capacity. The fleet, scheduled to be commissioned in September 2009, consists of a
Liebherr 966 hydraulic excavator (34-cubic-metre capacity) and four Terex MNT4400 trucks (260-tonne
capacity).
SouthGobi has appointed Norwest, a major international engineering firm, to complete a new
Technical Report for the Ovoot Tolgoi project incorporating data obtained from drilling completed
up to the end of 2008. The report is expected to be completed later in 2009.
INDONESIA: COAL PROJECTS
SOUTHGOBI ENERGY RESOURCES (80% owned)
SouthGobi stockpiling test shipments at Mamahak Coal Project, Indonesia
In January 2009, SouthGobi announced that a location permit was received, allowing the commencement
of surface coal extraction at its Mamahak Project in East Kalimantan, Indonesia. SouthGobi has an
85% working interest in Mamahak, with provisions to increase its interest to 100%.
During Q109, SouthGobi received a series of results from its coal-sampling programs at Mamahak.
The results suggest the coal is of a premium quality and has some unique characteristics, including
high fluidity, that make it suitable for coking processes. The results prompted SouthGobi to
continue development at the site. The coal-extraction infrastructure, including a 34-kilometre haul
road to the Mahahkam River, and barge load-out are being completed. SouthGobi is preparing to begin
trial shipments to customers in Asia of an initial 30,000 tonnes of high-quality metallurgical coal
from the
Mamahak Project. SouthGobi has engaged two mining contractors that have significant experience in
operations similar to Mamahak.
3
AUSTRALIA
IVANHOE AUSTRALIA (83% owned)
Scoping Study this year of mining and processing options for Merlin Molybdenum and Rhenium Project
Discovery
Ivanhoe Australia incurred exploration expenses of $6.1 million in Q109, compared to $9.5 million
in Q108. The decrease of $3.4 million was largely due to steps taken in Q408 to significantly
reduce expenditures by focusing on the companys key projects and decreasing its greenfields
exploration.
Ivanhoe Australias key projects, all situated on granted Mining Leases, are Mount Elliott, Mount
Dore, Starra Line and the new Merlin molybdenum and rhenium project in the Mount Dore mining
leases. During Q109, work focused on drilling of the Merlin Projects northern extensions, as well
as limited infill drilling on Mount Elliot and extensional drilling on the Mount Dore sulphides.
The Merlin Deposit is a clearly defined, high-grade body of molybdenum and rhenium sulphide
mineralization starting at a depth of about 100 metres and extending down-dip for over 400 metres.
The Merlin discovery now has been tested by 100 drill holes; assay results are available for 83 of
these holes. Visual estimates from core logging extend the molybdenum mineralization at least 400
metres north of the previous limit of drilling.
Two sub-zones now are recognized within the Merlin mineralization: a molybdenum and rhenium-rich
footwall zone, or lower zone, and an upper hangingwall zone that contains more copper and zinc,
along with molybdenum and rhenium.
At depth, this hangingwall zone becomes more copper- and zinc-dominant and the molybdenum grades
decrease. The exact nature of this rapid change from molybdenite to chalcopyrite-sphalerite is
still unclear; holes are being drilled to test the transition zone and provide a robust limit to
the Merlin zone down-dip to the east.
The current strike length of the zone, for which results are available, is over 500 metres;
however, mineralization has been found over a strike length of 900 metres in step-out holes.
Drilling is continuing to the north on 100-metre step-out traverses. Infill drilling is required to
extend the footwall zone to the south, where the drill spacing remains broad, and to infill the
high-grade zone of the footwall zone down dip. This area contains the highest grade and thickest
mineralization drilled to date.
Preliminary project studies for evaluating the development options are progressing, with the
mining, processing and marketing aspects advanced to a higher level of detail. Given the high value
of rhenium in the deposit, a critical area of metallurgical study is required to evaluate options
for further processing of the molybdenum sulphide concentrate to allow high rhenium recovery. A
Scoping Study for the Merlin Project is expected to be completed during Q209.
Ivanhoe Australia holds 15 Exploration Permits for Minerals (EPMs) and 20 Mining Leases, for a
total of 1,663 square kilometres, in the Cloncurry area. Ivanhoe Australia also has six EPM
applications in process, covering 757 square kilometres.
4
Gold exposure increased with Emmerson Resources Shareholding and Joint Venture Agreement
In April 2009, Ivanhoe Australia purchased an initial 10% equity stake in Emmerson Resources
(Emmerson) for approximately A$2.9 million, with the opportunity to increase this to 19.9% with an
additional investment of A$5.6 million. Ivanhoe Australia also entered into a joint-venture
agreement covering all of Emmersons tenements in the Tennant Creek Mineral Field (TCMF), in
Australias Northern Territory. Ivanhoe Australia is required to spend A$18 million over three
years to earn a 51% equity interest, which could increase to 70% in particular projects if certain
Mineral Resource thresholds are met.
Emmerson is an Australian mineral exploration company listed on the Australian Stock Exchange.
Emmersons tenements in the TCMF cover approximately 2,700 square kilometres in the centre of the
Northern Territory.
KAZAKHSTAN
ALTYNALMAS GOLD (49% owned)
Work on feasibility study to begin this year
Altynalmas Golds principal assets are the Bakyrchik Gold Project and the Bolshevik Project, which
are located on the highly prospective Kyzyl Shear in Kazakhstan.
Subject to its Board approval, Altynalmas Gold plans to undertake a 40,000-metre delineation
drilling program between June 2009 and January 2010. In parallel with this exploration program,
Altynalmas Gold intends to prepare a feasibility study scheduled for completion in February 2011.
Construction of a 100,000-tonne-per-year rotary kiln (Pilot Roaster) began in September 2007 and
was completed in December 2008. The purpose of the Pilot Roaster plant is to assess the viability
of roasting, using a rotary kiln as outlined in the work program approved by Kazakhstans Ministry
of Energy and Mineral Resources. On April 18, 2009, a decision was made to shut down the Pilot
Roaster until further modifications to the ore preparation and rotary kiln are made at a capital
cost of approximately $0.5 million.
Laboratory bench-scale, fluid-bed-roasting tests recently completed show that high gold recoveries
can be achieved for a whole-ore roast with a reducing first stage, followed by a highly oxidizing
second stage. This will be the basis of the feasibility study for the commercial process that is
planned for Altynalmas Golds operations.
FINANCIAL RESULTS
In Q109, Ivanhoe Mines recorded a net loss of $56.0 million (or $0.15 per share), compared to a
net loss of $63.6 million (or $0.17 per share) in Q108, representing a decrease of $7.6 million.
Results for Q109 were mainly affected by $37.4 million in exploration expenses; $7.8 million in
general and administrative expenses; $4.8 million in interest expense; and $9.3 million in mainly
unrealized foreign exchange losses. These amounts were offset by $10.7 million in income from
discontinued operations.
Exploration expense of $37.4 million in Q109 decreased $19.9 million from $57.3 million in Q108.
The exploration expenses included $26.9 million spent in Mongolia ($44.1 million in Q108),
primarily for Oyu Tolgoi and Ovoot Tolgoi, and $6.1 million incurred by Ivanhoe Australia ($9.5
million in Q108).
Ivanhoe Mines cash position, on a consolidated basis at March 31, 2009, was $327.1 million.
5
SELECTED ANNUAL FINANCIAL INFORMATION
This selected financial information is in accordance with U.S. GAAP, as presented in the annual
consolidated financial statements.
($ in millions of U.S. dollars, except per share information)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Quarter Ended |
|
|
|
Mar-31 |
|
|
Dec-31 |
|
|
Sep-30 |
|
|
Jun-30 |
|
|
|
2009 |
|
|
2008 |
|
|
2008 |
|
|
2008 |
|
Revenue |
|
$ |
3.5 |
|
|
$ |
3.1 |
|
|
$ |
0.0 |
|
|
$ |
0.0 |
|
Exploration expenses |
|
|
(37.4 |
) |
|
|
(76.0 |
) |
|
|
(59.7 |
) |
|
|
(67.3 |
) |
General and administrative |
|
|
(7.8 |
) |
|
|
(8.1 |
) |
|
|
(5.1 |
) |
|
|
(7.5 |
) |
Foreign exchange (losses) gains |
|
|
(9.3 |
) |
|
|
(40.6 |
) |
|
|
(20.0 |
) |
|
|
(1.0 |
) |
Writedown of other long-term investments |
|
|
|
|
|
|
(18.0 |
) |
|
|
|
|
|
|
|
|
Gain on sale of long-term investments |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
201.4 |
|
Net (loss) income from continuing operations |
|
|
(66.7 |
) |
|
|
(168.1 |
) |
|
|
(98.7 |
) |
|
|
118.3 |
|
Income from discontinued operations |
|
|
10.7 |
|
|
|
8.1 |
|
|
|
10.7 |
|
|
|
9.2 |
|
Net (loss) income |
|
|
(56.0 |
) |
|
|
(160.0 |
) |
|
|
(88.0 |
) |
|
|
127.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) income per share basic |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Continuing operations |
|
$ |
(0.18 |
) |
|
$ |
(0.45 |
) |
|
$ |
(0.26 |
) |
|
$ |
0.32 |
|
Discontinued operations |
|
$ |
0.03 |
|
|
$ |
0.02 |
|
|
$ |
0.03 |
|
|
$ |
0.02 |
|
Total |
|
$ |
(0.15 |
) |
|
$ |
(0.43 |
) |
|
$ |
(0.23 |
) |
|
$ |
0.34 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) income per share diluted |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Continuing operations |
|
$ |
(0.18 |
) |
|
$ |
(0.45 |
) |
|
$ |
(0.26 |
) |
|
$ |
0.29 |
|
Discontinued operations |
|
$ |
0.03 |
|
|
$ |
0.02 |
|
|
$ |
0.03 |
|
|
$ |
0.02 |
|
Total |
|
$ |
(0.15 |
) |
|
$ |
(0.43 |
) |
|
$ |
(0.23 |
) |
|
$ |
0.31 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Quarter Ended |
|
|
|
Mar-31 |
|
|
Dec-31 |
|
|
Sep-30 |
|
|
Jun-30 |
|
|
|
2008 |
|
|
2007 |
|
|
2007 |
|
|
2007 |
|
Revenue |
|
$ |
0.0 |
|
|
$ |
0.0 |
|
|
$ |
0.0 |
|
|
$ |
0.0 |
|
Exploration expenses |
|
|
(57.3 |
) |
|
|
(96.6 |
) |
|
|
(74.8 |
) |
|
|
(79.1 |
) |
General and administrative |
|
|
(6.8 |
) |
|
|
(9.0 |
) |
|
|
(7.0 |
) |
|
|
(5.9 |
) |
Foreign exchange (losses) gains |
|
|
(1.3 |
) |
|
|
2.3 |
|
|
|
2.1 |
|
|
|
6.7 |
|
Writedown of other long-term investments |
|
|
|
|
|
|
(24.5 |
) |
|
|
|
|
|
|
|
|
Gain on sale of long-term investments |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) income from continuing operations |
|
|
(69.6 |
) |
|
|
(265.5 |
) |
|
|
(90.0 |
) |
|
|
(78.7 |
) |
Income from discontinued operations |
|
|
6.0 |
|
|
|
11.9 |
|
|
|
6.8 |
|
|
|
4.6 |
|
Net (loss) income |
|
|
(63.6 |
) |
|
|
(253.6 |
) |
|
|
(83.1 |
) |
|
|
(74.2 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) income per share basic |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Continuing operations |
|
$ |
(0.19 |
) |
|
$ |
(0.71 |
) |
|
$ |
(0.24 |
) |
|
$ |
(0.21 |
) |
Discontinued operations |
|
$ |
0.02 |
|
|
$ |
0.04 |
|
|
$ |
0.02 |
|
|
$ |
0.01 |
|
Total |
|
$ |
(0.17 |
) |
|
$ |
(0.67 |
) |
|
$ |
(0.22 |
) |
|
$ |
(0.20 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) income per share diluted |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Continuing operations |
|
$ |
(0.19 |
) |
|
$ |
(0.71 |
) |
|
$ |
(0.24 |
) |
|
$ |
(0.21 |
) |
Discontinued operations |
|
$ |
0.02 |
|
|
$ |
0.04 |
|
|
$ |
0.02 |
|
|
$ |
0.01 |
|
Total |
|
$ |
(0.17 |
) |
|
$ |
(0.67 |
) |
|
$ |
(0.22 |
) |
|
$ |
(0.20 |
) |
6
QUALIFIED PERSONS
Disclosures of a scientific or technical nature in this release and the Companys MD&A in respect
of each of Ivanhoe Mines material mineral resource properties were prepared by, or under the
supervision of, the qualified persons (as that term is defined in NI 43-101) listed below:
|
|
|
|
|
Oyu Tolgoi Project
|
|
Stephen Torr, P.Geo,
Ivanhoe Mines
|
|
Employee of the Company |
|
|
|
|
|
Ovoot Tolgoi Project
|
|
Stephen Torr, P.Geo,
SouthGobi Energy
|
|
Employee of the Company |
Ivanhoe Mines results for the three months ended March 31, 2009, are contained in the audited
Consolidated Financial Statements and Managements Discussion and Analysis of Financial Condition
and Results of Operations, available on the SEDAR website at www.sedar.com and Ivanhoe Mines
website at www.ivanhoemines.com.
Ivanhoe Mines shares are listed on the Toronto, New York and NASDAQ stock exchanges under the
symbol IVN.
Information contacts
Investors: Bill Trenaman +1.604.688.5755 / Media: Bob Williamson +1.604.688.5755
Website: www.ivanhoemines.com
Forward Looking Statements:
Certain statements made herein, including statements relating to matters that are not historical
facts and statements of our beliefs, intentions and expectations about developments, results and
events which will or may occur in the future, constitute forward-looking information within the
meaning of applicable Canadian securities legislation and forward-looking statements within the
meaning of the safe harbor provisions of the United States Private Securities Litigation Reform
Act of 1995. Forward-looking information and statements are typically identified by words such as
anticipate, could, should, expect, seek, may, intend, likely, plan, estimate,
will, believe and similar expressions suggesting future outcomes or statements regarding an
outlook. These include, but are not limited to, statements respecting anticipated business
activities; planned expenditures; corporate strategies; proposed acquisitions and dispositions of
assets; discussions with third parties respecting material agreements; the expected timing and
outcome of Ivanhoe Mines discussions with representatives of the Government of Mongolia for an
Investment Agreement in respect of the Oyu Tolgoi Project; the timing of commencement of full
construction of the Oyu Tolgoi Project: the estimated timing and cost of bringing the Oyu Tolgoi
Project into commercial production; anticipated future production and cash flows; target milling
rates; the impact of amendments to the laws of Mongolia and other countries in which Ivanhoe Mines
carries on business; the anticipated future production for the Ovoot Tolgoi Coal Mine; the
potential improvement of the export conditions at the Ceke border between Mongolia and China and
the completion of a Technical Report for the Ovoot Tolgoi Coal Mine; the planned shipment of 30,000
tonnes of coal from the Mamahak Project in East Kalimantan, Indonesia for testing; the completion
of a Scoping Study for the Merlin Project; the potential of plans to make non-core projects
self-funding, and other statements that are not historical facts.
7
All such forward-looking information and statements are based on certain assumptions and analyses
made by Ivanhoe Mines management in light of their experience and perception of historical trends,
current conditions and expected future developments, as well as other factors management believes
are appropriate in the circumstances. These statements, however, are subject to a variety of risks
and uncertainties and other factors that could cause actual events or results to differ materially
from those projected in the forward-looking information or statements. Important factors that could
cause actual results to differ from these forward-looking statements include those described under
the heading Risks and Uncertainties elsewhere in the Companys MD&A. The reader is cautioned not
to place undue reliance on forward-looking information or statements.
The MD&A also contains references to estimates of mineral reserves and mineral resources. The
estimation of reserves and resources is inherently uncertain and involves subjective judgments
about many relevant factors. The accuracy of any such estimates is a function of the quantity and
quality of available data, and of the assumptions made and judgments used in engineering and
geological interpretation, which may prove to be unreliable. There can be no assurance that these
estimates will be accurate or that such mineral reserves and mineral resources can be mined or
processed profitably. Mineral resources that are not mineral reserves do not have demonstrated
economic viability. Except as required by law, the Company does not assume the obligation to revise
or update these forward-looking statements after the date of this document or to revise them to
reflect the occurrence of future unanticipated events.
8
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused
this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
|
|
|
|
IVANHOE MINES LTD.
|
|
Date: May 15, 2009 |
By: |
/s/ Beverly A. Bartlett
|
|
|
|
BEVERLY A. BARTLETT |
|
|
|
Vice President &
Corporate Secretary |
|