e8vk
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the
Securities Exchange Act of 1934
Date of Report (Date of earliest event reported): December 18, 2008
Energy Transfer Partners, L.P.
(Exact name of Registrant as specified in its charter)
|
|
|
|
|
Delaware
|
|
1-11727
|
|
73-1493906 |
(State or other jurisdiction
|
|
(Commission File Number)
|
|
(IRS Employer |
of incorporation)
|
|
|
|
Identification Number) |
3738 Oak Lawn Avenue
Dallas, TX 75219
(Address of principal executive offices)
(214) 981-0700
(Registrants telephone number, including area code)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the
filing obligation of the registrant under any of the following provisions:
|
|
|
o |
|
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
|
|
|
|
o |
|
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
|
|
|
|
o |
|
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
|
|
|
|
o |
|
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
|
We are supplementing our disclosures contained in Item 1A. Risk Factors of our Annual Report
on Form 10-K for the fiscal year ended August 31, 2007, and in our most recent Quarterly Report on
Form 10-Q for the quarter ended September 30, 2008, with the following information.
Unless the context otherwise requires, references to (1) Energy Transfer, ETP, we, us,
our and similar terms, as well as references to the Partnership, are to Energy Transfer
Partners, L.P. and all of its operating limited partnerships and subsidiaries and (2) ETE are to
Energy Transfer Equity, L.P.
Risk Factors Relating to the Joint Venture with OGE
The completion of the joint venture with OGE is subject to the timely and successful execution of a
financing plan in accordance with specified terms as well as numerous other closing conditions and
we may therefore not be able to successfully complete the joint venture.
Consummation of the joint venture transaction with OGE is conditioned on receipt of certain
third-party consents and certain other customary closing conditions. The transaction is also
conditioned upon obtaining financing pursuant to a specified financing plan that would provide ETP
Enogex Partners with funds to make payments to us and OGE at the closing of the transaction, to
refinance certain existing debt and to provide longer-term credit capacity. Specifically, the
financing plan, which we refer to as the ETP Enogex Financing Plan, requires that (a) ETP Enogex
Partners enter into at least a $700 million senior secured revolving credit facility having an
interest rate of no more than LIBOR plus 275 to 375 basis points (dependent on the facilitys
credit ratings), (b) ETP Enogex Partners issue a minimum of $700 million of senior unsecured notes
having an interest rate of no more than 9.0% and (c) Transwestern Pipeline Company issue approximately $800 million
in senior unsecured notes having an interest rate of no more than 8.0%. We and OGE have agreed
that, as a condition to the consummation of the transaction, the terms of the ETP Enogex Financing
Plan must be at least as favorable to ETP Enogex Partners as certain agreed upon terms, which terms
we and OGE believed approximated
existing market terms at the time the agreement for this transaction was signed. Subsequent to
entering into this agreement, credit markets have deteriorated and we believe that financing for
the joint venture is not currently available on terms that would satisfy the financing condition to
closing this transaction. Although we and OGE could waive this condition to closing if we mutually
agreed to financing terms less favorable than those specified in the contribution agreement, we
currently do not intend to waive this condition to closing. As a result, given the recent substantial
disruption in the credit markets, we believe it is unlikely we will be able to obtain financing
that meets the minimum specified terms or obtain the consents required to complete the transaction. If the joint venture has not been consummated by March
31, 2009, either we or OGE may terminate the contribution agreement relating to the formation of
the joint venture. If the credit markets do not improve significantly prior to March 31, 2009, the
ETP Enogex Financing Plan may not be put
into place and the agreement to enter into the joint venture may be terminated.
The joint venture with OGE, if completed, may not be able to successfully integrate the operations of Enogex and
ETP.
If the joint venture with OGE is completed, we will, pursuant to a contribution agreement, contribute our 100% equity interest in
Transwestern Pipeline Company, our 100% equity interest in ETC Canyon Pipeline and our 50% equity
interest in MEP to ETP Enogex Partners, and OGE will contribute its 100% equity interest in Enogex
to ETP Enogex Partners, in each case subject to the satisfaction of closing conditions, including
ETP Enogex Partners obtaining financing in accordance with the ETP Enogex Financing Plan. If ETP
Enogex Partners is not able to successfully integrate these operations, it could have an
adverse impact on our results of operations.
If the joint venture is completed, we will own 50% of the equity in ETP Enogex Partners and will
not be able to exercise full control over ETP Enogex Partners.
If the joint venture is completed, we will own 50% of the ownership interests in ETP Enogex Partners and ETP
Enogex Partners will be managed by a
four-person management council, of which we will designate two members and OGE will designate two
members. Following an initial period, and assuming the occurrence of certain events, ETP Enogex
Partners will be governed by a nine-member board of directors. We will be entitled to designate
three members of the board, OGE will be entitled to designate three members of the board and the
remaining three members will be mutually agreed upon by us and OGE. Accordingly, we will not be
able to exercise full control over ETP Enogex Partners, including with respect to:
|
|
|
decisions relating to the incurrence of expenses; |
|
|
|
|
establishing reserves for working capital, maintenance capital expenditures,
environmental matters and legal and rate proceedings; |
|
|
|
|
incurring additional indebtedness; and |
|
|
|
|
requiring us to make additional capital contributions to ETP Enogex Partners to fund
working capital, maintenance capital and expansion capital expenditures which could be
material. |
If the joint venture is completed and subsequently unable to obtain adequate financing, we may need to fund our share of ETP
Enogex Partners capital expenditure requirements.
If the joint venture is completed and is not able to obtain adequate financing on favorable terms, we and OGE,
as 50% owners of ETP Enogex Partners, may be required to contribute additional funds to support ETP
Enogex Partners capital expenditure programs.
Other Risk Factors Related to Our Business
We may not be able to obtain funding on acceptable terms or at all under our revolving credit
facility or otherwise because of the deterioration of the credit and capital markets. This may
hinder or prevent us from meeting our future capital needs.
Global financial markets and economic conditions have been, and continue to be, disrupted and
volatile due to
a variety of factors, including significant write-offs in the financial services sector and the
current weak economic conditions. As a result, the cost of raising money in the debt and equity
capital markets has increased substantially while the availability of funds from those markets has
diminished significantly. In particular, as a result of concerns about the stability of financial
markets generally and the solvency of lending counterparties specifically, the cost of obtaining
money from the credit markets generally has increased as many lenders and institutional investors
have increased interest rates, enacted tighter lending standards, refused to refinance existing
debt on similar terms or at all and reduced, or in
some cases ceased, to provide funding to borrowers. In addition, lending counterparties under
existing revolving credit facilities and other debt instruments may be unwilling or unable to meet
their funding obligations. Due to these factors, we cannot be certain that new debt or equity
financing will be available on acceptable terms. If funding is not available when needed, or is
available only on unfavorable terms, we may be unable to meet our obligations as they come due or
we may be required to post collateral to support our obligations. Moreover, without adequate
funding, we may be unable to execute our growth strategy, complete future acquisitions or announced
and future pipeline construction projects, take advantage of other business opportunities or
respond to competitive pressures, any of which could have a material adverse effect on our revenues
and results of operations.
Completion of pipeline expansion projects will require significant amounts of debt and equity
financing which may not be available to us on acceptable terms, or at all.
We plan to fund our expansion capital expenditures, including any future pipeline expansion
projects we may undertake, with proceeds from sales of our senior notes and common units and
borrowings under our revolving credit facility. However, we cannot be certain that we will be able
to issue our senior notes and common units on terms satisfactory to us, or at all. In addition, we
may be unable to obtain adequate funding under our current revolving credit facility because our
lending counterparties may be unwilling or unable to meet their funding obligations. If we are
unable to finance our expansion projects as expected, we could be required to seek alternative
financing, the terms of which may not be attractive to us, or to revise or cancel our expansion
plans.
Many of our customers drilling activity levels and spending for transportation on our pipeline
system may be impacted by the current deterioration in commodity prices and the credit markets.
Many of our customers finance their drilling activities through cash flow from operations, the
incurrence of debt or the issuance of equity. Recently, there has been a significant decline in the
credit markets and the availability of credit. Additionally, many of our customers equity values
have substantially declined. The combination of a reduction of cash flow resulting from recent
declines in natural gas prices, a reduction in borrowing bases under reserve-based credit
facilities and the lack of availability of debt or equity financing may result in a significant
reduction in our customers spending for natural gas drilling activity, which could result in lower
volumes being transported on our pipeline system. For example, a number of our customers have
announced reduced drilling capital expenditure budgets for the remainder of 2008 and 2009. A
significant reduction in drilling activity could have a material adverse effect on our operations.
The FERC is pursuing legal action against us relating to certain natural gas trading and
transportation activities, and related third party actions have been filed against us and ETE.
On July 26, 2007, the FERC issued to us an Order to Show Cause and Notice of Proposed
Penalties, which we refer to as the Order and Notice, that contains allegations that we violated
FERC rules and regulations. The FERC has alleged that we engaged in manipulative or improper
trading activities in the Houston Ship Channel, primarily on two dates during the fall of 2005
following the occurrence of Hurricanes Katrina and Rita, as well as on eight other occasions from
December 2003 through August 2005, in order to benefit financially from our commodities derivatives
positions and from certain of our index-priced physical gas purchases in the Houston Ship Channel.
The FERC has alleged that during these periods we violated the FERCs then-effective Market
Behavior Rule 2, an antimarket manipulation rule promulgated by the FERC under authority of the
Natural Gas Act, or NGA.We allegedly violated this rule by artificially suppressing prices that
were included in the Platts Inside FERC Houston Ship Channel index, published by McGraw-Hill
Companies, on which the pricing of many physical natural gas contracts and financial derivatives
are based. Additionally, the FERC has alleged that we manipulated daily prices at the Waha and
Permian Hubs in west Texas on two dates. Our Oasis pipeline transports interstate natural gas
pursuant to Natural Gas Policy Act, or NGPA, Section 311 authority and is subject to the
FERC-approved rates, terms and conditions of service. The allegations related to the Oasis pipeline
include claims that the Oasis pipeline violated NGPA regulations from January 26, 2004 through June
30, 2006 by granting undue preference to its affiliates for interstate NGPA Section 311 pipeline
service to the detriment of similarly situated non-affiliated shippers and by charging in excess of
the FERC-approved maximum lawful rate for interstate NGPA Section 311 transportation. On October
29, 2008, we moved for summary disposition of the claim that Oasis unduly discriminated against
nonaffiliated shippers and unduly preferred affiliated shippers. The presiding administrative law
judge granted this motion on November 18, 2008, holding that FERC Staff had failed to make a prima
facie case in support of this claim. This ruling, if allowed to stand, significantly narrows the
FERCs Oasis-related claims in the Order and Notice proceeding. The FERC also seeks to revoke, for
a period of 12 months, our blanket marketing authority for sales of natural gas in interstate
commerce at market-based prices, which activity is expected to account for approximately 1.0% of
our operating income for our 2008 calendar year. If the FERC is successful in revoking our blanket
marketing authority, our sales of natural gas at market-based prices would be limited to sales to
retail customers (such as utilities and other end users) and sales from our own production, and any
other sales of natural gas by us would be required to be made at contract prices that would be
subject to individual FERC approval.
In its Order and Notice, the FERC specified that it was seeking $70.1 million in disgorgement
of profits, plus interest, and $97.5 million in civil penalties relating to these matters. The FERC
has taken the position that, once it receives our response, it has several options as to how to
proceed, including issuing an order on the merits, requesting briefs, or setting specified issues
for a trial- type hearing before an administrative law judge. On August 27, 2007, ETP filed a
request for rehearing of the Order and Notice. On December 20, 2007, the FERC issued an order
denying rehearing and directed the FERC Enforcement Staff to file a brief recommending disposition
of issues by order or by evidentiary hearing. ETP filed its response to the Order and Notice with
the FERC on October 9, 2007, which response refuted the FERCs claims and requested a dismissal of
the FERC proceeding. On February 14, 2008, the Enforcement Staff of the FERC filed a brief
recommending that the FERC refer various matters relating to its market manipulation allegations
for an evidentiary hearing before a FERC administrative law judge. The Enforcement Staff also
recommended that the FERC issue an order assessing the $15.5 million portion of the
above-referenced penalty against ETP with respect to the allegations related to ETPs Oasis
pipeline and that the Oasis-related penalty assessment, if not paid, then be referred by the FERC
to a federal district court for de novo review. The Enforcement Staff also recommended that the
FERC impose certain changes in Oasiss business operations and refunds to certain Oasis customers
as previously proposed in the Order and Notice. Finally, the Enforcement Staff recommended that the
FERC pursue market manipulation claims related to ETPs trading activities in October 2005, for
November 2005 monthly deliveries, a period not previously covered by FERCs allegations in the
Order and Notice, and that ETP be assessed an additional civil penalty of $25.0 million and be
required to disgorge approximately $7.3 million of alleged unjust profits related to this
additional month. If the FERC pursues the claims related to this additional month, the total amount
of civil penalties and disgorgement of profits sought by the FERC would be approximately
$200 million. On March 31, 2008, we responded to the Enforcement Staffs brief. On April 25, 2008,
the Enforcement Staff filed an answer to our March 31, 2008 pleading. On May 15, 2008, the FERC
ordered hearings to be conducted by FERC administrative law judges with respect to the FERCs Oasis
claims and market manipulation claims. The hearing related to the Oasis claims was scheduled to
commence in December 2008 with the administrative law judges initial decisions due by May 11,
2009, and the hearing related to the market manipulation claims is scheduled to commence in April
2009 with the administrative law judges initial decision due by October 26, 2009. The FERC also
ordered that, following the completion of the hearings, the administrative law judges make
initial findings with respect to whether we engaged in market manipulation in violation of the NGA
and FERC regulations and whether Oasis violated the NGPA and FERC regulations. The FERC reserved
for itself the issues of possible civil penalties, the revocation of our blanket market
certificate, the method by which we and Oasis would disgorge any unjust profits and whether any
conditions should be placed on Oasiss Section 311 authorization. Following the issuance of each of
the administrative law judges initial decisions, the FERC would then issue an order with respect
to each of these matters. On May 23, 2008, we requested rehearing and stay of the FERCs May 15,
2008 order establishing hearing, and we renewed those requests on June 26, 2008. On August 7, 2008,
FERC denied rehearing of its May 15, 2008 order. On August 8, 2008, we filed a petition with the
U.S. Court of Appeals for the Fifth Circuit to review and set aside FERCs May 15 and August 7,
2008 orders on the grounds that we are entitled to adjudicate FERCs claims in federal district
court pursuant to the NGA and the NGPA. On August 28, 2008, we filed an amended petition seeking
review of the Order and Notice and the December 20, 2007 order denying rehearing.
On November 18, 2008, the administrative law judge presiding over the Oasis claims
issued an initial decision granting our motion for summary disposition of the claim that Oasis
unduly discriminated in favor of affiliates regarding the provision of
Section 311(a)(2) interstate transportation service. Following this initial decision with respect to the
principal claim related to Oasis, in December 2008 we reached an agreement in principle
with the Enforcement Staff to settle all of the claims related to
Oasis. This agreement in principle is subject to finalization of full
settlement documents between us and the Enforcement Staff and then
approval by FERC. Until we receive FERC approval of the settlement
documents, the terms of the proposed settlement
are confidential. The proposed settlement will thereafter be subject
to further administrative proceedings and possible judicial review.
We do not believe that the Oasis settlement, as currently agreed upon
in principle, will have a material adverse effect on our business,
financial condition or results of operations.
It is our position that our trading and transportation activities during the periods at issue
complied in all material aspects with applicable law and regulations, and we intend to contest
these cases vigorously. However, the laws and regulations related to alleged market manipulation
are vague, subject to broad interpretation, and offer little guiding precedent, while at the same
time the FERC holds substantial enforcement authority. At this time, we are unable to predict the
final outcome of these matters.
On July 26, 2007, the United States Commodity Futures Trading Commission, or the CFTC, filed
suit in United States District Court for the Northern District of Texas alleging that we violated
provisions of the Commodity Exchange Act, or CEA, by attempting to manipulate natural gas prices in
the Houston Ship Channel. On March 17, 2008, we entered into a consent order with the CFTC, which
we refer to as the Consent Order. Pursuant to the Consent Order, we agreed to pay the CFTC $10.0
million and the CFTC agreed to release us and our affiliates, directors and employees from all
claims or causes of action asserted by the CFTC in this proceeding. The Consent Order provides that
we are permanently enjoined from attempting to manipulate the price of any commodity in interstate
commerce in violation of the CEA. By consenting to the entry of the Consent Order, we neither
admitted nor denied the allegations made by the CFTC in this proceeding. The settlement reduced our
existing accrual and was paid from cash flow from operations in March 2008.
In addition to the pending FERC legal action, third parties have asserted claims and may
assert additional claims against us and ETE for damages related to these matters. In this regard,
several natural gas producers and a natural gas marketing company have initiated legal proceedings
in Texas state courts against us and ETE for claims related to the FERC claims. These suits contain
contract and tort claims relating to alleged manipulation of natural gas prices at the Houston Ship
Channel and the Waha Hub in West Texas, as well as the natural gas price indices related to these
markets and the Permian Basin natural gas price index during the period from December 2003 through
December 2006, and seek unspecified direct, indirect, consequential and exemplary damages. One of
the suits against us and ETE contains an additional allegation that we and ETE transported gas in a
manner that favored our affiliates and discriminated against the plaintiff, and otherwise
artificially affected the market price of gas to other parties in the market. We have also been
served with a complaint from an owner of royalty interests in natural gas producing properties,
individually and on behalf of a putative class of similarly situated royalty owners, working
interest owners and producer/operators, seeking arbitration to recover damages based on alleged
manipulation of natural gas prices at the Houston Ship Channel. We have filed an original action in
Harris County state court seeking a stay of the arbitration on the ground that the action is not
arbitrable. The claimants agreed to a stay of the arbitration pending resolution of cross motions
for summary judgment in the state court proceeding. On November 12, 2008, the state court granted
our motion for summary judgment.
A consolidated class action complaint has been filed against us in the United States District
Court for the Southern District of Texas. This action alleges that we engaged in intentional and
unlawful manipulation of the price of natural gas futures and options contracts on the New York
Mercantile Exchange, or NYMEX, in violation of the CEA. It is further alleged that during the class
period of December 29, 2003 to December 31, 2005, we had the market power to manipulate index
prices, and that we used this market power to artificially depress the index prices at major
natural gas trading hubs, including the Houston Ship Channel, in order to benefit our natural gas
physical and financial trading positions, and that we intentionally submitted price and volume
trade information to trade publications. This complaint also alleges that we violated the CEA by
knowingly aiding and abetting violations of the CEA. The plaintiffs state that this allegedly
unlawful depression of index prices by us manipulated the NYMEX prices for natural gas futures and
options contracts to artificial levels during the class period, causing unspecified damages to the
plaintiffs and all other members of the putative class who sold natural gas futures or who
purchased and/or sold natural gas options contracts on NYMEX during the class period. The
plaintiffs have requested certification of their suit as a class action and seek unspecified
damages, court costs and other appropriate relief. On January 14, 2008, we filed a motion to
dismiss this suit on the grounds of failure to allege facts sufficient to state a claim. On March
20, 2008, the plaintiffs filed a second consolidated class action complaint. In response to this
new pleading, on May 5, 2008, we filed a motion to dismiss the complaint. On June 19, 2008, the
plaintiffs filed a response opposing our motion to dismiss. We filed a reply in support of our
motion on July 9, 2008.
On March 17, 2008, a second class action complaint was filed against us in the United States
District Court for the Southern District of Texas. This action alleges that we engaged in unlawful
restraint of trade and intentional monopolization and attempted monopolization of the market for
fixed-price natural gas baseload transactions at the Houston Ship Channel from December 2003
through December 2005 in violation of federal antitrust law. The complaint further alleges that
during this period we exerted monopoly power to suppress the price for these transactions to
non-competitive levels in order to benefit our own physical natural gas positions. The plaintiff
has, individually and on behalf of all other similarly situated sellers of physical natural gas,
requested certification of its suit as a class action and seeks unspecified treble damages, court
costs and other appropriate relief. On May 19, 2008, we filed a motion to dismiss this complaint.
On July 2, 2008 the plaintiffs filed a response opposing our motion to dismiss. We filed a reply in
support of our motion on August 18, 2008.
We are expensing the legal fees, consultants fees and other expenses relating to these
matters in the periods in which such expenses are incurred. In addition, our existing accruals for
litigation and contingencies include an accrual related to these matters. At this time, we are
unable to predict the outcome of these matters. However, it is possible that the amount we become
obliged to pay as a result of the final resolution of these matters, whether on a negotiated
settlement basis or otherwise, will exceed the amount of our existing accrual related to these
matters. In accordance with applicable accounting standards, we will review the amount of our
accrual related to these matters as developments related to these matters occur and we will adjust
our accrual if we determine that it is probable that the amount we may ultimately become obliged to
pay as a result of the final resolution of these matters is greater than the amount of our existing
accrual for these matters. As our accrual amounts are non-cash, any cash payment of an amount in
resolution of these matters would likely be made from cash from operations or borrowings, which
payments would reduce our cash available to service our indebtedness
either directly or as a result of
increased principal and interest payments necessary to service any borrowings incurred to finance
such payments. If these payments are substantial, we may experience a material adverse impact on
our results of operations and our liquidity.
Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly
caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
|
|
|
|
|
|
Energy Transfer Partners, L.P.
|
|
|
By: |
Energy Transfer Partners GP, L.P.,
|
|
|
|
General Partner |
|
|
|
|
|
|
By: |
Energy Transfer Partners, L.L.C.,
|
|
|
|
General Partner |
|
|
|
|
|
|
|
|
|
Date: December 18, 2008 |
/s/ Martin Salinas
|
|
|
Martin Salinas |
|
|
Chief Financial Officer and officer duly
authorized to sign on behalf of the registrant |
|
|