Filed By Filing Services Canada Inc. 403-717-3898


FORM 6-K
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

Report of Foreign Private Issuer

Pursuant to Rule 13a-16 or 15d-16
of the Securities Exchange Act of 1934




For: June 13 - 30, 2005



Platinum Group Metals Ltd.

(SEC File No. 0-30306)


Suite 328 – 550 Burrard Street, Vancouver BC, V6C 2B5, CANADA

Address of Principal Executive Office


The registrant files annual reports under cover:

Form 20-F  X 

                Form 40-F      

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):         


Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):         


Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934:

Yes                      No   X     

 

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82-              


Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

Date: July 6, 2005

   “R. Michael Jones”                 

R. MICHAEL JONES

President, Director




FORM 53-901F

MATERIAL CHANGE REPORT

UNDER SECTION 85(1) OF THE SECURITIES ACT (BRITISH COLUMBIA)

AND SECTION 118(1) OF THE SECURITIES ACT (ALBERTA)


Item 1.

Reporting Issuer

PLATINUM GROUP METALS LTD.

328 - 550 Burrard Street Vancouver BC, V6C 2B5


Telephone:

(604) 899-5450     Facsimile:

(604) 484-4710

Item 2.

Date of Material Change

June 28, 2005

Item 3.

Press Release

The Issuer issued a press release at Vancouver, BC dated June 28, 2005 to the TSXV.

Item 4.

Summary of Material Change

Platinum Group Metals Ltd. (PTM-TSXV) announces assay results from drill intercepts which confirm the high grade nature of the resource area. The new results allow for expansion of the resource area within the Western Bushveld Joint Venture ("WBJV").


Item 5.

Full Description of Material Change  

See News Release dated June 28, 2005.

Item 6.

Reliance on Section 85(2) of the Act (British Columbia) And Section 118(2) of the Act (Alberta)

N/A

Item 7.  

Omitted Information

N/A

Item 8.

Senior Officers

The following senior officer of the Issuer is knowledgeable about the material change and may be contacted by the Commission at the following telephone number:

R. Michael Jones, President & CEO

Phone: (604) 899-5450

Item 9.

Statement of Senior Officer

The foregoing accurately discloses the material change referred to herein. Dated at Vancouver, British Columbia this 5th day of July, 2005.

Platinum Group Metals Ltd.

"R. Michael Jones"

R. Michael Jones,

President & CEO




Platinum Group Metals Ltd.

MATERIAL CHANGE REPORT

328 - 550 Burrard Street, Vancouver BC, V6C 2B5

Page 1 of 1





Platinum Group Metals Ltd.

Suite 328 - 550 Burrard Street, Vancouver V6C 2B5

Telephone: (604) 899-5450 Fax: (604) 484-4710

E-mail: info@platinumgroupmetals.net

Web Site: www.platinumgroupmetals.net

PTM:TSX; PTMQF:OTCBB

SEC Form 20F, File No. 0-30306

 No.05-109

 

News Release

June 28, 2005


Western Bushveld Joint Venture Drilling Expands Reef Areas and Returns High Grades


Platinum Group Metals Ltd. (PTM-TSX; PTMQF-OTCBB) announces assay results from drill intercepts which confirm the high grade nature of the resource area. The new results allow for expansion of the resource area within the Western Bushveld Joint Venture ("WBJV"). The targets for exploration and development continue to be within the well known rock layers of the "Merensky Reef" and "UG2 reefs" which produce the bulk of the world's platinum production.


Highlights of new intercepts on the Merensky Reef include:

WBJV-02-D0 6.41 grams per tonne (g/t) platinum, palladium and gold (2E+Au) cut to a 1.0 metre mining width

WBJV-06-D0 15.02 g/t (2E+Au) cut to a 1.0 metre mining width

ELN-06-D2  7.24 g/t (3E+Au) at 1.46 metres mining width


The WBJV holes specifically highlighted above are from PTM's ongoing drilling program and are located on the outer edge of the previous resource area and as a result of their area of influence, add to the area for consideration in a resource update. ELN06 is within the resource and is from a re-analysis of earlier drilling that was not considered in the initial resource calculation announced April 14, 2005 of 4.74 M (3E+Au) ounces inferred included 15Mt grading 7.92 g/t 3E+Au on the Merensky Reef. The previous resource was calculated principally from 9 intercepts with a minimum mining cut of 1 meter.


The average Merensky Reef grade derived now from all available 27 intercepts is 7.80 g/t platinum, palladium, rhodium, and gold (3E+Au) calculated over a mean thickness cut of 1.20 metres. For perspective the BRPM Platinum Mine immediately adjoining the WBJV has a published reserve grade of 4.87 g/t 3E+ Au with approximately a 1 meter mining width. The average WBJV grade includes the new holes where the Merensky Reef was successfully intercepted by PTM, new results on the historically drilled core, and the holes in the earlier resource calculation.  The rhodium values for the PTM holes are still outstanding and will add slightly to the average value. The platinum group element ratio averages of the new intercepts on the Merensky Reef average 64% platinum, 30% palladium, 2% rhodium (est.), and 4 % gold. This is consistent with the platinum ratio in the Western Bushveld generally and confirms PTM's earlier estimates.


PTM has completed 27 boreholes totalling 10,000 metres and results from 13 holes (6,976 metres) are hereby reported. The new results reported have the same general distributions of grades and thickness and geological losses as included in the previous resource estimate, and they enlarge the area to be considered for resources.


Drilling completed by PTM in the past few days has not been sampled but confirms that the Merensky Reef and UG2 Reef extend for a further 3.1 kilometres along strike beyond the initial resource area. The results from the further drilling on strike are expected to be received shortly so that they can be considered in the ongoing project scoping study currently underway. A scoping study is an initial engineering study and economic model to develop concepts for project development.


"We are very pleased with the initial drilling results confirming the excellent tonnes, grade, and depth profile of the deposit and opening up of the area to the northwest along strike and near to surface" said John Gould,









- 2 -



Managing Director with PTM RSA (Pty) Ltd, the wholly-owned subsidiary of PTM-TSX. Mr. Gould has experience in platinum mining at the Amandelbult Platinum mine to the north of the PTM project.


PTM and Anglo Platinum each hold a 37% interest in the joint venture, with BEE partner Africa Wide Mining holding 26%. PTM is the project operator. Anglo Platinum is the world leader in platinum. Drilling is continuing with four machines.


Technical Details

A total of 35 potential pierce points (boreholes and deflections) have been completed and assayed by PTM and Anglo Platinum's work on the Merensky Reef. To date, twenty seven pierce points or 77% intersected reef successfully and eight or 23% intersected minor faulting or cross cutting features that prevented reef evaluation.  A geological loss factor of 30% was used in the previous resource evaluation.  A total of 7 intercepts (26%) are at a grade of 10g/t 3E plus gold or higher over a 1metre mining cut or better. Thirteen intercepts (48%) are above a grade of 6g/t 3E plus gold and 21 of the intersections (78%) are above a grade of 3g/t 3E plus gold. This distribution is as expected from a deposit of this type.


The Western Bushveld Joint Venture Project covers a total of 67 square kilometres and the initial resource covers approximately 15% of the mineral rights area. Hole WBJV-09-D1 is located 3.1 kilometres northwest along strike from the known resource and intersected 3.25 g/t 2E +Au over 0.44 metres at 265 metres below surface on the Merensky Reef. This hole combined with holes WBJV-20, WBJV-25 with near surface reefs and assays pending, and FG-34-D7 with 13.5 g/t 3E+Au over 1.07 meters, 2 kilometres from the resource area, all confirm the considerable expansion potential.


An updated resource calculation over a larger area than previously considered is underway.


Holes WBJV 3,4,5,7 and 11 intersected small scale faults with 2 to 5 metre offsets or small dykes that prevented the reef layer from being intersected and evaluated. The size of fault offsets or disruptions are clearly visible from the marker layers above and below the Merensky Reef and/or the position of the UG2 Reef that was intersected. The Merensky Reef is the focus of PTM's current exploration and development plans although the well developed UG2 intercepts, within 200 metres of surface, drilled in the last few days, with assays pending may provide a rationale to look more closely at the UG2 as well.


A table of the significant reef intercepts to date on the Western Bushveld is shown attached. See website for plan (www.platinumgroupmetals.net).


Qualified Person and Quality Control and Assurance

Mr. Willie Visser is acting as the Qualified Person, "QP" for Platinum Group Metals (RSA) (Pty) Ltd., "PTM RSA" a wholly owned subsidiary of PTM, for this release. He is registered with the SACNASP (South African Council for Natural Scientific Professions) (Registration No. 400279/04). Mr. Visser is the Exploration Manager for PTM RSA with 15 years experience as a geologist, including senior Resource Manager experience. Information on regional deposits has been acquired from public information and is believed to be reliable. Samples were analyzed for Au (ppb), Pt (ppb) and Pd (ppb) Rh (ppb) by standard fire assay with an ICP finish (Inductively Coupled Plasma). The samples were assayed at Genalysis Laboratories Services Pty Ltd in Perth Australia, ALS Chemex in Johannesburg and Set-Point Labs in Johannesburg. PTM employs a rigorous quality control program which includes insertion of blanks, duplicates and certified reference materials in the assay stream once in every 15 or fewer samples. This is in addition to internal quality control measures undertaken by the contracted analytical facilities.








- 3 -



About PTM

PTM is based in Vancouver, Canada and Johannesburg, South Africa. The Company is listed on the TSX in Toronto and is focussed on driving platinum resources to development. The focus of the Company is platinum in South Africa particularly the Western Bushveld Joint Venture with Anglo Platinum with 4.74 Million ounces of platinum, palladium rhodium and gold in resources. PTM is the operator of the Western Bushveld Joint Venture with partners Anglo Platinum and Africa Wide mining. The Company also holds a 70% option interest in the War Springs platinum project in the North Limb of the Bushveld Complex of South Africa and interest in a large mineral rights position in the only platinum-palladium mine area in Canada.


On behalf of the Board of

Platinum Group Metals Ltd.

"R. Michael Jones"

President and Director



[See drill results table attached.]







- 4 -




Merensky Reef

Inter-section No.

Borehole No.

Defl. (*1)

New (*2)

Reef (*3)

Comment (*4)

Facies

From (m)

Interval (m)

Pt

(ppb)

Pd

(ppb)

Rh

(ppb)

Au

(ppb)

4E (g/t)

4E (cmgt)

Assay Method (*5)

X

Coordinate UTM (*6)

Y

Coordinate

UTM (*6)

1

FG02

D2

RR

MR

Pass

Htz

519.56

2.50

 

 

 

 

18.69

4673

4

9268.620

-2812035.890

2

WBJV06

D0

New

MR

Pass

Htz

459.98

1.00

10051

4525

-

448

15.02

1502

2

8608.128

-2813259.832

3

FG34

D9

PR

MR

Pass

FPP

889.70

1.07

9555

2881

971

97

13.50

1464

4

6890.892

-2809868.915

4

WBJV06

D1

New

MR

Pass

Htz

456.41

1.00

8483

4252

-

555

13.29

1329

2

8608.128

-2813259.832

5

FG02

D0

RR

MR

Pass

Htz

519.47

1.97

 

 

 

 

13.21

2602

4

9268.620

-2812035.890

6

ELN01

D3

RR

MR

Pass

Htz

490.91

1.00

 

 

 

 

12.82

1282

4

9866.310

-2812667.580

7

ELN12

D2

RR

MR

Pass

Htz

334.61

2.14

 

 

 

 

11.51

2464

4

8892.174

-2813404.000

8

ELN01

D0

RR

MR

Pass

Htz

490.53

1.00

 

 

 

 

8.08

808

4

9866.310

-2812667.580

9

ELN12

D1

RR

MR

Pass

Htz

334.71

2.03

 

 

 

 

7.93

1611

4

8892.174

-2813404.000

10

ELN06

D2

New

MR

Pass

Htz

400.57

1.46

1314

3873

1783

272

7.24

1057

4

9219.720

-2812880.870

11

FG33

D0

RR

MR

Pass

Pxnt

395.10

1.00

 

 

 

 

6.83

683

4

9664.449

-2813583.619

12

FG34

D7

PR

MR

Pass

FPP

890.20

1.23

4111

1789

299

325

6.52

848

4

6890.892

-2809868.915

13

WBJV02

D0

New

MR

Pass

FPP

464.74

1.00

4054

1948

-

406

6.41

641

2

8573.092

-2812564.088

14

FG30

D3

RR

MR

Pass

CR

505.80

1.00

 

 

 

 

5.38

538

4

8622.793

-2811718.804

15

FG31

D0

RR

MR

Pass

FPP

335.50

1.00

 

 

 

 

5.30

530

4

7781.225

-2811039.799

16

WBJV01

D2

New

MR

Pass

FPP

441.16

1.00

3058

1392

-

276

4.73

473

2

8855.941

-2812165.626

17

WBJV01

D0

New

MR

Pass

FPP

447.65

1.00

2854

1307

-

171

4.33

433

2

8855.941

-2812165.626

18

WBJV08

D1

New

MR

Pass

Pxnt

239.67

1.00

2310

1299

32

547

4.19

419

2

8072.823

-2813337.816

19

WBJV02

D1

New

MR

Pass

FPP

458.84

1.00

2029

1252

-

180

3.46

346

2

8573.092

-2812564.088

20

FG30

D0

RR

MR

Pass

CR

505.30

1.00

 

 

 

 

3.28

328

4

8622.793

-2811718.804

21

FG29

D1

RR

MR

Pass

CR

468.70

1.00

 

 

 

 

3.24

324

4

9749.469

-2812950.226

22

WBJV08

D0

New

MR

Pass

Pxnt

243.00

1.00

1472

691

-

127

2.29

229

2

8072.823

-2813337.816

23

WBJV10

D1

New

MR

Pass

FPP

421.42

1.00

1312

523

74

143

2.05

205

2

9358.783

-2813598.879

24

FG29

D0

RR

MR

Pass

CR

467.70

1.00

 

 

 

 

1.97

197

4

9749.469

-2812950.226

25

WBJV14

D0

New

MR

Pass

Pxnt

235.65

1.00

926

328

22

73

1.35

135

2

8511.950

-2813841.210

26

WBJV09

D1

New

MR

Pass

Htz

265.07

1.00

655

342

-

19

1.02

102

2

5733.700

-2811297.983

27

WBJV12

D0

New

MR

Pass

Pxnt

64.22

1.00

340

143

0

2

0.49

49

2

7999.966

-2814091.185

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

28

WBJV10

D0

New

MR

Not Recognized

FPP

426.82

1.00

56

26

0

0

0.08

8

2

9358.783

-2813598.879

29

ELN11

D0

New

MR

Disturbed

CR

198.82

-

-

-

-

-

-

-

4

9072.615

-2813762.491

30

WBJV03

D0

New

MR

Faulted

-

-

-

-

-

-

-

-

-

2

9215.668

-2812492.532

31

WBJV04

D0

New

MR

Faulted

-

-

-

-

-

-

-

-

-

2

8971.993

-2813587.188

32

WBJV05

D0

New

MR

Faulted

-

-

-

-

-

-

-

-

-

2

8309.380

-2812942.636

33

WBJV07

D0

New

MR

Disturbed

CR

245.71

-

-

-

-

-

-

-

2

8322.021

-2813639.167

34

WBJV09

D0

New

MR

Rejected

Htz

-

-

-

-

-

-

-

-

2

5733.700

-2811297.983

35

WBJV11

D0

New

MR

Disturbed

CR

382.11

-

-

-

-

-

-

-

2

8275.241

-2813317.472

                                   

Explanation to Table

                             

*1: Defl. Reads Deflection, which is a secondary hold drilled out of the the mother hole

*2: New is an indication of the new and additional information in addition to the information used for the Resource calculation {RR = Resource Report, PR = Press Released and New = New Data]

*3: Reef shows MR which indicates Merensky Reef

*4: Within the Comments, pass means that the QA/QC is passed, Faulted means that the Reef was displaced by a geological fault

Disturbed means that the reef is present but not of a quality so as to pass a QA test

*5 Assay Method indicates that either a 4, 3 or 2 PGM + Gold assay technique

*6:The cordinate system is the WG29 local grid system.


- 30 -

 

For furtherinformation contact:

 

R. Michael Jones, President

or John Foulkes, Manager Corporate Development

Platinum Group Metals Ltd., Vancouver

Tel: (604) 899-5450 / Toll Free: (866) 899-5450

 

Larry Roth

Roth Investor Relations, NJ

Tel: (732) 792-2200

The TSX has not reviewed and does not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

Note to U.S. Investors: Investors are urged to consider closely the disclosure in our Form 20F, File No. 0-30306, available at our office:  Suite 328-550 Burrard Street, Vancouver BC, Canada, V6C 2B5 or from the SEC: 1(800) SEC-0330.







Platinum Group Metals Ltd.

Suite 328 - 550 Burrard Street, Vancouver V6C 2B5

Telephone: (604) 899-5450 Fax: (604) 484-4710

E-mail: info@platinumgroupmetals.net

Web Site: www.platinumgroupmetals.net

PTM:TSX; PTMQF:OTCBB

SEC Form 20F, File No. 0-30306

 No.05-110

 

News Release

June 28, 2005

 

Amendment to table header in news release of June 28, 2005



Platinum Group Metals Ltd. (PTM-TSX; PTMQF-OTCBB) has noted an error in the table header of its news release of earlier today detailing the results of drilling completed and sampled on the Merensky Reef.  Although the reported grams per tonne are correct, where the table header describes the splits for Pt, Pd, Rh and Au, the unit of measurement should clearly have read "ppb", not "ppm".  This has been corrected.  The Company has also taken this opportunity to improve the clarity of the legend for the column named "Assay Method".  All other data in the table remains unchanged.  See corrected table attached.  



On behalf of the Board of

Platinum Group Metals Ltd.

"R. Michael Jones"

President and Director


[See corrected drill results table attached.]









- 2 -



Correction to table headings and legend;

Merensky Reef

Inter-section No.

Borehole No.

Defl. (*1)

New (*2)

Reef (*3)

Comment (*4)

Facies

From (m)

Interval (m)

Pt

(ppb)

Pd

(ppb)

Rh

(ppb)

Au

(ppb)

Total

 (g/t)

Total

 (cmgt)

Assay Method (*5)

X

Coordinate UTM (*6)

Y

Coordinate

UTM (*6)

1

FG02

D2

RR

MR

Pass

Htz

519.56

2.50

 

 

 

 

18.69

4673

4

9268.620

-2812035.890

2

WBJV06

D0

New

MR

Pass

Htz

459.98

1.00

10051

4525

-

448

15.02

1502

3

8608.128

-2813259.832

3

FG34

D9

PR

MR

Pass

FPP

889.70

1.07

9555

2881

971

97

13.50

1464

4

6890.892

-2809868.915

4

WBJV06

D1

New

MR

Pass

Htz

456.41

1.00

8483

4252

-

555

13.29

1329

3

8608.128

-2813259.832

5

FG02

D0

RR

MR

Pass

Htz

519.47

1.97

 

 

 

 

13.21

2602

4

9268.620

-2812035.890

6

ELN01

D3

RR

MR

Pass

Htz

490.91

1.00

 

 

 

 

12.82

1282

4

9866.310

-2812667.580

7

ELN12

D2

RR

MR

Pass

Htz

334.61

2.14

 

 

 

 

11.51

2464

4

8892.174

-2813404.000

8

ELN01

D0

RR

MR

Pass

Htz

490.53

1.00

 

 

 

 

8.08

808

4

9866.310

-2812667.580

9

ELN12

D1

RR

MR

Pass

Htz

334.71

2.03

 

 

 

 

7.93

1611

4

8892.174

-2813404.000

10

ELN06

D2

New

MR

Pass

Htz

400.57

1.46

1314

3873

1783

272

7.24

1057

4

9219.720

-2812880.870

11

FG33

D0

RR

MR

Pass

Pxnt

395.10

1.00

 

 

 

 

6.83

683

4

9664.449

-2813583.619

12

FG34

D7

PR

MR

Pass

FPP

890.20

1.23

4111

1789

299

325

6.52

848

4

6890.892

-2809868.915

13

WBJV02

D0

New

MR

Pass

FPP

464.74

1.00

4054

1948

-

406

6.41

641

3

8573.092

-2812564.088

14

FG30

D3

RR

MR

Pass

CR

505.80

1.00

 

 

 

 

5.38

538

4

8622.793

-2811718.804

15

FG31

D0

RR

MR

Pass

FPP

335.50

1.00

 

 

 

 

5.30

530

4

7781.225

-2811039.799

16

WBJV01

D2

New

MR

Pass

FPP

441.16

1.00

3058

1392

-

276

4.73

473

3

8855.941

-2812165.626

17

WBJV01

D0

New

MR

Pass

FPP

447.65

1.00

2854

1307

-

171

4.33

433

3

8855.941

-2812165.626

18

WBJV08

D1

New

MR

Pass

Pxnt

239.67

1.00

2310

1299

32

547

4.19

419

3

8072.823

-2813337.816

19

WBJV02

D1

New

MR

Pass

FPP

458.84

1.00

2029

1252

-

180

3.46

346

3

8573.092

-2812564.088

20

FG30

D0

RR

MR

Pass

CR

505.30

1.00

 

 

 

 

3.28

328

4

8622.793

-2811718.804

21

FG29

D1

RR

MR

Pass

CR

468.70

1.00

 

 

 

 

3.24

324

4

9749.469

-2812950.226

22

WBJV08

D0

New

MR

Pass

Pxnt

243.00

1.00

1472

691

-

127

2.29

229

3

8072.823

-2813337.816

23

WBJV10

D1

New

MR

Pass

FPP

421.42

1.00

1312

523

74

143

2.05

205

3

9358.783

-2813598.879

24

FG29

D0

RR

MR

Pass

CR

467.70

1.00

 

 

 

 

1.97

197

4

9749.469

-2812950.226

25

WBJV14

D0

New

MR

Pass

Pxnt

235.65

1.00

926

328

22

73

1.35

135

3

8511.950

-2813841.210

26

WBJV09

D1

New

MR

Pass

Htz

265.07

1.00

655

342

-

19

1.02

102

3

5733.700

-2811297.983

27

WBJV12

D0

New

MR

Pass

Pxnt

64.22

1.00

340

143

0

2

0.49

49

3

7999.966

-2814091.185

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

28

WBJV10

D0

New

MR

Not Recognized

FPP

426.82

1.00

56

26

0

0

0.08

8

3

9358.783

-2813598.879

29

ELN11

D0

New

MR

Disturbed

CR

198.82

-

-

-

-

-

-

-

4

9072.615

-2813762.491

30

WBJV03

D0

New

MR

Faulted

-

-

-

-

-

-

-

-

-

3

9215.668

-2812492.532

31

WBJV04

D0

New

MR

Faulted

-

-

-

-

-

-

-

-

-

3

8971.993

-2813587.188

32

WBJV05

D0

New

MR

Faulted

-

-

-

-

-

-

-

-

-

3

8309.380

-2812942.636

33

WBJV07

D0

New

MR

Disturbed

CR

245.71

-

-

-

-

-

-

-

3

8322.021

-2813639.167

34

WBJV09

D0

New

MR

Rejected

Htz

-

-

-

-

-

-

-

-

3

5733.700

-2811297.983

35

WBJV11

D0

New

MR

Disturbed

CR

382.11

-

-

-

-

-

-

-

3

8275.241

-2813317.472

                                   

Explanation to Table

                             

*1: Defl. Reads Deflection, which is a secondary hole drilled out of the mother hole

*2: New is an indication of the new and additional information in addition to the information used for the Resource calculation {RR = Resource Report, PR = Press Released and New = New Data]

*3: Reef shows MR which indicates Merensky Reef

*4: Within the Comments, pass means that the QA/QC is passed, Faulted means that the Reef was displaced by a geological fault

      Disturbed means that the reef is present but not of a quality so as to pass a QA test

*5: Assay Method indicates either "4" elements (Pt, Pd, Rh + Au) or "3" elements (Pt, Pd + Au)

*6: The coordinate system is the WG29 local grid system.


- 30 -

 

For further information contact:

 

R. Michael Jones, President

or John Foulkes, Manager Corporate Development

Platinum Group Metals Ltd., Vancouver

Tel: (604) 899-5450 / Toll Free: (866) 899-5450

 

Larry Roth

Roth Investor Relations, NJ

Tel: (732) 792-2200

The TSX has not reviewed and does not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

Note to U.S. Investors: Investors are urged to consider closely the disclosure in our Form 20F, File No. 0-30306, available at our office:  Suite 328-550 Burrard Street, Vancouver BC, Canada, V6C 2B5 or from the SEC: 1(800) SEC-0330.