Skip to main content

Telson Mining Increases Private Placement

Tickers: XTSX:TSN, PINX:SOHFF
Tags: #Mining



Vancouver, British Columbia - TheNewswire - July 02, 2020 - Telson Mining Corporation ("Telson" or the "Company" (TSXV:TSN), (OTC:SOHFF), (Frankfurt:TSGN (formerly SQ82)) announces that it is increasing the maximum amount to be raised in a non-brokered private placement which was initially announced on June 16, 2020. The Company now intends to conduct a non-brokered private placement (the "Private Placement") of up to 14,000,000 units (the "Units") at a price of $0.10 per Unit for total proceeds of up to $1,400,000. Each Unit will consist of one common share of the Company and one half of a transferable share purchase warrant (each whole warrant being a "Warrant" of the Company). Each whole Warrant will entitle the holder to acquire one additional common share of the Company for a period of two years at an exercise price of $0.15 per share. The proceeds from the Private Placement are expected to be used to advance the construction of the Tahuehueto gold mine and for general working capital. Closing of the Private Placement is subject to TSX Venture Exchange approval.

About Telson Mining Corporation

Telson Mining Corporation is a Canadian based mining company with two 100% owned Mexican gold, silver, and base metal mining projects.

Telson's Tahuehueto gold mining project, located in north-western Durango State, Mexico. Construction at Tahuehueto has been advanced to an estimated 60-70% of completion and waiting for final funding to finish construction of the processing plant and related assets to produce gold, silver, lead and zinc in concentrates within its own on-site mineral processing facility, with a designed capacity of at least 1,000 tonnes per day. The Company is targeting completion of construction during early 2021.

Campo Morado is a polymetallic base metal mine with mining and milling equipment capable of producing up to 2,500 tonnes per day. Four months after purchasing Campo Morado, Telson brought the mine back into operation initiating preproduction in October 2017 and declared commercial production in May 2018, operating the mine continuously for 22 months until August 2019 when the project was put on care and maintenance. . Telson brought the mine out of care and maintenance and reinitiated mining and milling operations during late January 2020, temporarily suspended operations during April and May 2020 as mandated by the Mexican Government for COVID-19 precautions, and re-initiated Mining operations June 4, 2020 after mining was declared an essential service within Mexico .

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) "Ralph Shearing"

Ralph Shearing, President, CEO and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, readers should be cautioned that Telson's production decision has been made without a comprehensive feasibility study of established reserves such that there is greater risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than would be the case if a feasibility study was completed and relied upon to make a production decision. Telson has completed a preliminary economic assessment ("PEA") mining study on the Campo Morado mine that provides a conceptual life of mine plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated November 8, 2017 and April 4,2018).

Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operations at Campo Morado; the ability to recommence outstanding payments to Nyrstar; and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company's properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as "plans", "expects", "scheduled", "estimates", "forecasts", "intends", "anticipates" or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the current exploration, development, environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that recommencement of operations at Campo Morado will proceed as planned; that discussions with Nyrstar and the abeyance of any potential default proceedings will be completed in a timely manner and on reasonable terms, the continuity of the price of gold and other metals, economic and political conditions and operations. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell
Corporate Communications Manager
ir@telsonmining.com
Tel: +1 (604) 684-8071

Copyright (c) 2020 TheNewswire - All rights reserved.

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.