Press Release | ||||||||
Signatures |
Press Release |
By category | % | |||
Organic growth |
71.5 | % | ||
Projects |
60.5 | % | ||
R&D |
11.0 | % | ||
Sustaining of existing operations |
28.5 | % | ||
Total |
100.0 | % | ||
By business area | % | |||
Bulk materials |
55.6 | % | ||
Ferrous minerals |
46.7 | % | ||
Coal |
8.9 | % | ||
Base metals |
21.6 | % | ||
Fertilizers |
9.6 | % | ||
Logistics for general cargo |
2.4 | % | ||
Power generation |
3.6 | % | ||
Steel |
2.9 | % | ||
Others |
4.3 | % | ||
Total |
100.0 | % | ||
By geography | % | |||
Brazil |
63.7 | % | ||
South
America (ex- Brazil) |
6.0 | % | ||
Canada |
11.7 | % | ||
Africa |
9.1 | % | ||
Asia |
5.7 | % | ||
Australasia |
3.3 | % | ||
Others |
0.5 | % | ||
Total |
100.0 | % | ||
1 | The capex budget includes financial disbursements in
consolidated format according to generally accepted US accounting principles
(US GAAP). The main subsidiaries consolidated according to US GAAP are:
Compañia Minera Misky Mayo S.A.C., Ferrovia Centro-Atlântica (FCA), Ferrovia
Norte Sul S.A, PT Vale Indonesia Tbk (formerly International Nickel Indonesia
Tbk), Vale Australia Pty Ltd., Vale Canada Limited (formerly Vale Inco
Limited), Vale Colômbia Ltd., Mineração Corumbaense Reunida S.A., Vale
Fertilizantes S.A., Vale International, Vale Manganês S.A., Vale Manganèse
France, Vale Manganese Norway S.A. and Vale Nouvelle Caledonie SAS. |
2
Expected capex | ||||||||||||||
Estimated | US$ million | |||||||||||||
Project | start-up | 2012 | Total | Status1 | ||||||||||
IRON ORE MINING AND LOGISTICS |
||||||||||||||
Carajás Additional 40 Mtpy Construction of an iron ore dry processing plant, located in Carajás, Pará, Brazil. Estimated nominal capacity of 40 Mtpy. |
2H13 | 622 | 2,968 | Installation license (LI) was issued. We are executing earthworks
services and civil engineering works. 43% of physical progress. Total executed capex of US$1.3 billion. |
||||||||||
CLN 150 Mtpy Increase Northern system railway and port capacity, including the construction of a fourth pier at the Ponta da Madeira maritime terminal. Located in Maranhão, Brazil. Increase estimated EFCs logistics nominal capacity to approximately 150 Mtpy. |
1H14 | 890 | 3,477 | Earthworks and offshore civil engineering works at Ponta da Madeira
maritime terminal started. Critical equipments for the car dumpers
were received Railway Installation licenses (LI) issuance expected for 2H12. 55% of physical progress. Total executed capex of US$1.8 billion. |
||||||||||
Carajás Serra Sul S11D Development of a mine and processing plant, located in the Southern range of Carajás, Pará, Brazil. Estimated nominal capacity of 90 Mtpy. |
2H16 | 794 | 8,039 | Investing capital for earthworks services and building the access
road, before the issuance of environmental permits. Preliminary environmental license (LP) issuance expected for 1H12. Installation license (LI) issuance expected for 1H13. 22% of physical progress. Total realized capex of US$804 million. |
||||||||||
Serra Leste Construction of new processing plant, located in Carajás, Pará, Brazil Estimated nominal capacity of 6 Mtpy. |
1H13 | 239 | 478 | Construction of the access road on progress. Earthworks and civil
engineering works for the plant started. Excavation on progress Issuance of installation licenses (LI) expected for following months. 21% of physical progress. Total executed capex of US$79 million. |
||||||||||
Conceição Itabiritos Construction of concentration plant, located in the Southeastern system, Minas Gerais, Brazil. Estimated nominal capacity of 12 Mtpy. |
2H13 | 184 | 1,174 | Project evolving on time and on budget. The issuance of pending
installation licenses (LI) is expected for 1H12. 79% of physical progress. Total executed capex of US$428 million. |
||||||||||
Vargem Grande Itabiritos Construction of new iron ore treatment plant, located in the Southern system, Minas Gerais, Brazil. Estimated nominal capacity of 10 Mtpy. |
1H14 | 429 | 1,645 | Issuance of installation license (LI) expected for 1H13. 38% of physical progress. Total executed capex of US$262 million. |
||||||||||
Conceição Itabiritos II Adaptation of the plant to process low-grade itabirites, located in the Southeastern system, Minas Gerais, Brazil. Estimated nominal capacity of 19 Mtpy (without additional net capacity). |
2H14 | 297 | 1,189 | Project at initial stages, with excavations for the installation of
primary crushers going on. Installation licenses (LI) issued. 14% of physical progress. Total executed capex of US$65 million. |
3
Expected capex | ||||||||||||||
Estimated | US$ million | |||||||||||||
Project | start-up | 2012 | Total | Status1 | ||||||||||
Simandou
I - Zogota Development of the Zogota mine and processing plant in Simandou South, Guinea. Estimated nominal capacity of 15 Mtpy. |
1H12 | 380 | 1,260 | Project in early stage of development. First production expected for 2012. | ||||||||||
Teluk Rubiah Construction of a maritime terminal with enough depth for the 400,000 dwt vessels and a stockyard. Located in Teluk Rubiah, Malaysia. Stockyard capable of handling up to 30 Mtpy of iron ore products. |
1H14 | 367 | 1,371 | Preliminary environmental license, construction and installation
license issued. Issuance of operation license expected for 1H14. On schedule. Contracts with civil engineering service providers signed. 9% of physical progress. Total executed capex is US$120 million. |
||||||||||
PELLET PLANTS |
||||||||||||||
Tubarão VIII Eighth pellet plant at our existing complex at the Tubarão Port, Espírito Santo, Brazil. Estimated nominal capacity of 7.5 Mtpy. |
2H12 | 239 | 968 | Currently assembling of the stacker reclaimer of the pellets
stockyard. Issuance of operation license (LO) expected for 2H12. 74% of physical progress. Total executed capex of US$547 million. |
||||||||||
Samarco IV Construction of Samarcos fourth pellet plant, and expansion of mine, pipeline and maritime terminal infrastructure. Vale has a 50% stake in Samarco. Estimated nominal capacity of 8.3 Mtpy, increasing Samarcos capacity to 30.5 Mtpy. |
1H14 | | 1,693 | 2 | Project at initial stages. 11% of physical progress of the pellet plant. The 2012 budget will be internally sourced by Samarco. |
|||||||||
COAL MINING AND LOGISTICS |
||||||||||||||
Moatize II New pit and duplication of the Moatize CHPP, as well as all related infrastructure, located in Tete, Mozambique. Nominal capacity of 11 Mtpy (70% coking coal and 30% thermal). |
2H14 | 499 | 2,068 | Geological research studies on progress 2% of physical progress. Total executed capex of US$15 million. |
||||||||||
Nacala corridor Railway and port infrastructure connecting Moatize site to the Nacala-à-Velha maritime terminal, located in Nacala, Mozambique. Estimated nominal capacity of 18 Mtpy. |
2H14 | 691 | 4,444 | Environmental licenses issued for the railway
and maritime terminal. Development of the detailed aspects of the engineering project on progress. Project in early stage of development. Total executed capex of US$8 million. |
||||||||||
COPPER MINING |
||||||||||||||
Salobo Development of mine, plant, and related infrastructure, located in Marabá, Pará, Brazil. Estimated nominal capacity of 100,000 tpy of copper in concentrate. |
1H12 | 296 | 2,337 | Concluding mechanical assembly of the primary
crushing and of the water collection, supply
and storage system. Plant operation license (LO) expected for 1H12. 96% of physical progress. Total executed capex of US$1.9 billion. |
4
Expected capex | ||||||||||||||
Estimated | US$ million | |||||||||||||
Project | start-up | 2012 | Total | Status1 | ||||||||||
Salobo II Salobo expansion, raising of the tailing dam height and increase in mine capacity, located in Marabá, Pará, Brazil Additional estimated nominal capacity of 100,000 tpy of copper in concentrate. |
2H13 | 581 | 1,427 | Civil works at the flotation circuit on
progress. The construction of the ball mill was
initiated. Plant operation license (LO) issuance expected for 1H13. 46% of physical progress. Total executed capex of US$268 million. |
||||||||||
NICKEL MINING AND REFINING |
||||||||||||||
Long Harbour Hydrometallurgical facility. Located in Long Harbour, Newfoundland and Labrador, Canada. Estimated nominal capacity of refining 50,000 tpy of finished nickel, and associated copper and cobalt. |
2H13 | 1,208 | 3,600 | Plant under construction. Electromechanical
assembly on progress. 54% of physical progress. Total executed capex of US$1.3 billion. |
||||||||||
Totten Nickel mine (re-opening) in Sudbury, Ontario, Canada. Estimated nominal capacity of 8,200 tpy |
2H13 | 157 | 759 | Total executed capex of US$358 million. | ||||||||||
POTASH MINING AND LOGISTICS |
||||||||||||||
Rio Colorado Investments in a solution mining system, located in Mendoza, Argentina, renovation of railway tracks (440 km), construction of a railway spur (350 km) and a maritime terminal in Bahia Blanca, Argentina. Estimated nominal capacity of 4.3 Mtpy of potash (KCl). |
2H14 | 1,081 | 5,915 | Agreement finalized with the five Argentinean
provinces involved in the project. Excavations
started. Civil engineering works on progress. 22% of physical progress. Total executed capex of US$509 million. |
||||||||||
ENERGY |
||||||||||||||
Biodiesel Project to produce biodiesel from palm oil. Plantation of 80,000 ha of palm trees. Located in Pará, Brazil. Estimated nominal capacity of 360,000 tpy of biodiesel. |
2015 | 227 | 633 | Planting palm trees. Biodiesel plants FEL III
expected for July 2013. Preliminary environmental license (LP) and construction and installation license (LI) issuance expected 2H13. Total executed capex of US$286 million. |
||||||||||
STEELMAKING |
||||||||||||||
CSP2 Development of a steel slab plant in partnership with Dongkuk and Posco, located in Ceará, Brazil. Vale holds 50% of the joint venture. Estimated nominal capacity of 3.0 Mtpy. |
1H15 | 563 | 2,346 | Early stage of development. The partnership is developing the FEL III feasibility study. |
1 | as of September 2011 |
|
2 | Expected capex is relative to Vales stake in the projects. |
5
By mineral | 2012 | |||
Iron ore |
312,000 | |||
Pellets |
50,000 | |||
Coal |
16,600 | |||
Nickel |
300 | |||
Copper |
340 | |||
Potash |
650 | |||
Phosphate rock |
8,000 |
6
7
Vale S.A. (Registrant) |
||||
Date: November 28, 2011 | By: | /s/ Roberto Castello Branco | ||
Roberto Castello Branco | ||||
Director of Investor Relations | ||||