Form 6-K
United States
Securities and Exchange Commission
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
of the
Securities Exchange Act of 1934
For the month of
October 2011
Vale S.A.
Avenida Graça Aranha, No. 26
20030-900 Rio de Janeiro, RJ, Brazil
(Address of principal executive office)
(Indicate by check mark whether the registrant files or will file annual reports under cover of
Form 20-F or Form 40-F.)
(Check One) Form 20-F þ Form 40-F o
(Indicate by check mark if the registrant is submitting the Form 6-K in paper
as permitted by Regulation S-T Rule 101(b)(1))
(Check One) Yes o No þ
(Indicate by check mark if the registrant is submitting the Form 6-K in paper
as permitted by Regulation S-T Rule 101(b)(7))
(Check One) Yes o No þ
(Indicate by check mark whether the registrant by furnishing the information contained in this Form
is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the
Securities Exchange Act of 1934.)
(Check One) Yes o No þ
(If Yes is marked, indicate below the file number assigned to the registrant in connection with
Rule 12g3-2(b). 82-_____.)
TABLE OF CONTENTS
Vale 3Q11 Production Report
A SOLID PERFORMANCE
Rio de Janeiro, October 26, 2011 Vale S.A. (Vale) operations had a robust performance in
3Q11, as shown by the output increase of the majority of its products, and the recording of
all-time high volumes for iron ore, pellets, copper and thermal coal.
Improvement in operational performance of the existing assets and the ramp-up to name plate
capacity of new projects such as Additional 20Mtpy, Oman, Onça Puma and Tres Valles were the main
drivers for the good results achieved.
Iron ore output reached 87.9 Mt1, being the best quarterly mark ever, led by the Carajás
record of 30.9 Mt. Over the last twelve-month period ended on September 30, 2011, our iron ore
production reached 319.9 Mt in line with the target for 2011.
Pellet production continued achieving new records, reaching 14.1 Mt, primarily due to the
successful ramp-up of the first plant of the Oman operations. Oman I produced 4.6 Mt, on an
annualized basis, already reaching full capacity.
Nickel production had its best third quarter since 2008, with an output of 58,000 metric tons.
Furnace #2 of the Copper Cliff smelter, in Sudbury, resumed operations, thus contributing to
increase production. On the other hand, the performance of Canadian assets was affected by the
regular annual maintenance stoppage of Thompson. Our copper output was 84,300 metric tons, an
all-time high quarterly figure, due to across-the-board performance improvement Sossego,
Sudbury, Thompson and Voiseys Bay and the ramp-up of Tres Valles, our Chilean operation.
Vale New Caledonia (VNC) is retaining nickel hydroxide cake to be used in testing the retrofitting
of the refinery columns, part of the operational process to produce nickel oxide. After the issues
that emerged in the final stage of the commissioning of VNC operations last year, the columns were
redesigned by the equipment supplier, allowing the full operation to be tested during 4Q11.
Moatize, a world-class asset, is being commissioned. It is our first greenfield coal project and
also the first project to be delivered by Vale in Africa. The first shipment of a trial cargo
utilizing the Linha do Sena railroad and the port of Beira (Mozambique) took place in September.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Production |
|
|
|
|
|
000 metric tons |
|
9M11 |
|
|
9M10 |
|
|
%Change |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Iron orea |
|
|
239,687 |
|
|
|
227,533 |
|
|
|
5.3 |
% |
Pelletsa |
|
|
39,886 |
|
|
|
36,783 |
|
|
|
8.4 |
% |
Manganese ore |
|
|
1,799 |
|
|
|
1,364 |
|
|
|
31.9 |
% |
Ferroalloy |
|
|
330 |
|
|
|
335 |
|
|
|
-1.5 |
% |
Coal |
|
|
4,574 |
|
|
|
5,146 |
|
|
|
-11.1 |
% |
Nickel |
|
|
173 |
|
|
|
114 |
|
|
|
51.8 |
% |
Copper |
|
|
217 |
|
|
|
132 |
|
|
|
64,8 |
% |
Potash |
|
|
445 |
|
|
|
493 |
|
|
|
-9.7 |
% |
Phosphate rock |
|
|
9,903 |
|
|
|
5,689 |
|
|
|
74.1 |
% |
|
|
|
|
1 |
|
Mt = million metric tons |
|
|
|
kt = thousand metric tons |
|
|
|
t = metric tons |
|
a |
|
Including Samarcos attributable production. |
1
BULK MATERIALS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IRON ORE |
|
|
82,614 |
|
|
|
80,257 |
|
|
|
87,890 |
|
|
|
227,533 |
|
|
|
239,687 |
|
|
|
9.5 |
% |
|
|
6.4 |
% |
|
|
5.3 |
% |
Southeastern System |
|
|
31,530 |
|
|
|
30,528 |
|
|
|
31,297 |
|
|
|
86,885 |
|
|
|
90,518 |
|
|
|
2.5 |
% |
|
|
-0.7 |
% |
|
|
4.2 |
% |
Itabira |
|
|
10,621 |
|
|
|
10,499 |
|
|
|
10,919 |
|
|
|
28,668 |
|
|
|
30,499 |
|
|
|
4.0 |
% |
|
|
2.8 |
% |
|
|
6.4 |
% |
Mariana |
|
|
9,697 |
|
|
|
9,861 |
|
|
|
9,923 |
|
|
|
27,702 |
|
|
|
29,158 |
|
|
|
0.6 |
% |
|
|
2.3 |
% |
|
|
5.3 |
% |
Minas Centrais |
|
|
11,212 |
|
|
|
10,168 |
|
|
|
10,455 |
|
|
|
30,515 |
|
|
|
30,862 |
|
|
|
2.8 |
% |
|
|
-6.8 |
% |
|
|
1.1 |
% |
Midwestern System |
|
|
1,088 |
|
|
|
1,417 |
|
|
|
1,642 |
|
|
|
2,940 |
|
|
|
3,973 |
|
|
|
15.9 |
% |
|
|
50.9 |
% |
|
|
35.1 |
% |
Corumbá |
|
|
749 |
|
|
|
1,028 |
|
|
|
1,203 |
|
|
|
1,953 |
|
|
|
2,840 |
|
|
|
17.1 |
% |
|
|
60.6 |
% |
|
|
45.4 |
% |
Urucum |
|
|
339 |
|
|
|
389 |
|
|
|
439 |
|
|
|
987 |
|
|
|
1,133 |
|
|
|
12.8 |
% |
|
|
29.3 |
% |
|
|
14.8 |
% |
Southern System |
|
|
20,258 |
|
|
|
19,496 |
|
|
|
21,200 |
|
|
|
56,489 |
|
|
|
57,475 |
|
|
|
8.7 |
% |
|
|
4.7 |
% |
|
|
1.7 |
% |
Minas Itabiritos |
|
|
8,275 |
|
|
|
7,691 |
|
|
|
7,917 |
|
|
|
22,581 |
|
|
|
22,785 |
|
|
|
2.9 |
% |
|
|
-4.3 |
% |
|
|
0.9 |
% |
Vargem Grande |
|
|
5,938 |
|
|
|
5,784 |
|
|
|
6,168 |
|
|
|
16,938 |
|
|
|
16,410 |
|
|
|
6.6 |
% |
|
|
3.9 |
% |
|
|
-3.1 |
% |
Paraopebas |
|
|
6,044 |
|
|
|
6,021 |
|
|
|
7,115 |
|
|
|
16,970 |
|
|
|
18,280 |
|
|
|
18.2 |
% |
|
|
17.7 |
% |
|
|
7.7 |
% |
Northern System |
|
|
26,997 |
|
|
|
26,019 |
|
|
|
30,894 |
|
|
|
73,164 |
|
|
|
79,563 |
|
|
|
18.7 |
% |
|
|
14.4 |
% |
|
|
8.7 |
% |
Carajás |
|
|
26,997 |
|
|
|
26,019 |
|
|
|
30,894 |
|
|
|
73,164 |
|
|
|
79,563 |
|
|
|
18.7 |
% |
|
|
14.4 |
% |
|
|
8.7 |
% |
Samarco1 |
|
|
2,741 |
|
|
|
2,798 |
|
|
|
2,858 |
|
|
|
8,054 |
|
|
|
8,158 |
|
|
|
2.1 |
% |
|
|
4.3 |
% |
|
|
1.3 |
% |
|
|
|
1 |
|
Vales attributable production of 50%. |
Iron ore production in 3Q11 was the highest in Vales history, amounting to 87.9 million
metric tons (Mt), up 2.3% compared to the previous record of 85.9 Mt in 3Q08. Over the last
twelve-month period ended on September 30, 2011 our iron ore output reached 319.9 Mt.
In the first nine months of this year Vale produced 239.7 Mt, which is also a new record, against
238.4 Mt in 9M08. Output increased 9.5% on a quarterly basis, with across-the-board gains in all
systems, Northern, Southeastern, Southern and Midwestern, as well as with Samarco.
Production at the Carajás mining site reached 30.9 Mt in 3Q11, a new all-time high level. The
increase of 18.7% over 2Q11 reflects the end of the rainy season and also the conclusion of the
corrective maintenance of one car dumper at the Ponta da Madeira maritime terminal.
The Southeastern System, which encompasses the Itabira, Mariana and Minas Centrais mining sites,
had a good performance, delivering an output of 31.3 Mt, thereby increasing 2.5% over 2Q11.
Although the production of Minas Centrais rose to 10.4 Mt from 10.2 Mt in 2Q11, it was negatively
impacted by problems with the blending reclaimer, which feeds the processing plant.
The Southern System Minas Itabirito, Vargem Grande and Paraopeba had the best quarterly
performance since 3Q08 with a production of 21.2 Mt, 8.7% higher than the previous quarter and 4.7%
higher than 3Q10. The Paraopebas complex showed a good result due to the availability of new mining
equipment, which allowed a production increase of 1.1 Mt.
The Midwestern System, Urucum and Corumbá mining sites, produced 1.6 Mt in 3Q11. Production rose
15.9% on a quarter-on-quarter basis and 50.9% on a year-on-year basis. This expansion stemmed from
the ramp-up of a new processing plant in Corumbá, which commenced operations in February 2011.
2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PELLETS |
|
|
13,638 |
|
|
|
13,140 |
|
|
|
14,230 |
|
|
|
36,783 |
|
|
|
39,886 |
|
|
|
8.3 |
% |
|
|
4.3 |
% |
|
|
8.4 |
% |
Tubarão I and II |
|
|
1,434 |
|
|
|
1,440 |
|
|
|
1,561 |
|
|
|
4,246 |
|
|
|
4,337 |
|
|
|
8.4 |
% |
|
|
8.9 |
% |
|
|
2.1 |
% |
Fábrica |
|
|
1,058 |
|
|
|
992 |
|
|
|
1,033 |
|
|
|
2,793 |
|
|
|
2,972 |
|
|
|
4.1 |
% |
|
|
-2.4 |
% |
|
|
6.4 |
% |
São Luís |
|
|
1,656 |
|
|
|
1,349 |
|
|
|
1,328 |
|
|
|
3,391 |
|
|
|
4,014 |
|
|
|
-1.6 |
% |
|
|
-19.8 |
% |
|
|
18.4 |
% |
Vargem Grande |
|
|
1,425 |
|
|
|
1,321 |
|
|
|
970 |
|
|
|
4,113 |
|
|
|
3,567 |
|
|
|
-26.6 |
% |
|
|
-31.9 |
% |
|
|
-13.3 |
% |
Nibrasco |
|
|
2,395 |
|
|
|
2,291 |
|
|
|
2,514 |
|
|
|
6,465 |
|
|
|
7,213 |
|
|
|
9.7 |
% |
|
|
5.0 |
% |
|
|
11.6 |
% |
Kobrasco |
|
|
1,163 |
|
|
|
1,001 |
|
|
|
1,167 |
|
|
|
3,547 |
|
|
|
3,390 |
|
|
|
16.5 |
% |
|
|
0.3 |
% |
|
|
-4.4 |
% |
Hispanobras1 |
|
|
560 |
|
|
|
544 |
|
|
|
559 |
|
|
|
1,455 |
|
|
|
1,645 |
|
|
|
2.8 |
% |
|
|
-0.1 |
% |
|
|
13.0 |
% |
Itabrasco |
|
|
1,049 |
|
|
|
1,135 |
|
|
|
1,102 |
|
|
|
2,852 |
|
|
|
3,257 |
|
|
|
-2.9 |
% |
|
|
5.0 |
% |
|
|
14.2 |
% |
Samarco2 |
|
|
2,897 |
|
|
|
2,731 |
|
|
|
2,841 |
|
|
|
7,920 |
|
|
|
8,000 |
|
|
|
4.0 |
% |
|
|
-1.9 |
% |
|
|
1.0 |
% |
Oman |
|
|
|
|
|
|
336 |
|
|
|
1,155 |
|
|
|
|
|
|
|
1,490 |
|
|
|
244.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
1 |
|
Vales attributable production capacity of 50.89%. |
|
2 |
|
Vales attributable production capacity of 50%. |
In 3Q11, pellet production achieved the highest quarterly production figure ever, with 14.2
Mt 78% blast furnace and 22% direct reduction up 8.3% and 4.3% compared to 2Q11 and 3Q10,
respectively. The total pellet volume produced in 9M11 amounted to 39.9 Mt, reaching a new record,
expanding 8.4% when compared to 9M10.
In 3Q11, Tubarão I&II reached the best production figure since 3Q08. Output increased by 8.4% and
8.9%, respectively, reflecting the operational improvements after repairs in the ball mill during
the first half of this year.
Itabrasco production was slightly lower than the previous quarter, due to the scheduled stoppage
for maintenance.
Fábrica output was 4.1% higher than 2Q11, recovering from the scheduled stoppages for maintenance
on the conveyor belt in the last quarter.
Vargem Grande had a decrease of 26.6% on a quarter-on-quarter basis, and was 31.9% lower than 3Q10,
stemming from a shortage in pellet feed availability in 3Q11 and corrective maintenance in the
mill.
Corrective maintenance at São Luís caused a 2.9% drop in its output in relation to 2Q11 and 19.8%
vis-á-vis 3Q10.
Nibrasco and Kobrasco had an increase of 9.7% and 16.5%, respectively, on a quarter-on-quarter
basis, recovering from the operational issues in the plants, which caused some maintenance
stoppages in both operations the previous quarter.
The attributable production of the three pellet plants of the 50%-owned Samarco JV, was 2.8 Mt in
3Q11, 4.0% higher than 2Q11, which showed continued strong performance after the ramp-up of the
third plant.
The Oman operations, in the industrial site of Sohar, in Oman, are ramping up. It has two pellet
plants, each with capacity to produce 4.5 Mtpy, thus adding 9.0 Mtpy to our total capacity. The two
plants will produce direct reduction pellets. Omans first plant started operating in April and
produced 1.2 Mt in 3Q11, against 336,000 t in 2Q11.
3
|
|
Manganese ore and ferroalloys |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MANGANESE ORE |
|
|
472 |
|
|
|
619 |
|
|
|
681 |
|
|
|
1,364 |
|
|
|
1,799 |
|
|
|
10.1 |
% |
|
|
44.3 |
% |
|
|
31.9 |
% |
Azul |
|
|
372 |
|
|
|
486 |
|
|
|
535 |
|
|
|
1,159 |
|
|
|
1,437 |
|
|
|
10.2 |
% |
|
|
43.8 |
% |
|
|
24.0 |
% |
Urucum |
|
|
55 |
|
|
|
82 |
|
|
|
88 |
|
|
|
143 |
|
|
|
222 |
|
|
|
7.0 |
% |
|
|
60.3 |
% |
|
|
54.8 |
% |
Other mines |
|
|
46 |
|
|
|
51 |
|
|
|
59 |
|
|
|
61 |
|
|
|
139 |
|
|
|
14.3 |
% |
|
|
28.5 |
% |
|
|
129.7 |
% |
|
FERROALLOYS |
|
|
112 |
|
|
|
114 |
|
|
|
103 |
|
|
|
335 |
|
|
|
330 |
|
|
|
-9.9 |
% |
|
|
-8.3 |
% |
|
|
-1.5 |
% |
Brazil |
|
|
50 |
|
|
|
52 |
|
|
|
51 |
|
|
|
152 |
|
|
|
155 |
|
|
|
-2.4 |
% |
|
|
1.9 |
% |
|
|
1.9 |
% |
Dunkerque |
|
|
35 |
|
|
|
37 |
|
|
|
27 |
|
|
|
103 |
|
|
|
101 |
|
|
|
-25.8 |
% |
|
|
-23.3 |
% |
|
|
-1.8 |
% |
Mo I Rana |
|
|
26 |
|
|
|
25 |
|
|
|
24 |
|
|
|
80 |
|
|
|
74 |
|
|
|
-2.5 |
% |
|
|
-7.5 |
% |
|
|
-7.4 |
% |
In 3Q11, manganese ore production increased 10.1% on a quarter-on-quarter basis, reaching
681,000 t, the best quarterly performance since 3Q08. This was fueled by an expansion in the demand
for manganese ore by clients.
The production of Azul was 10.2% higher than 2Q11, showing an improvement in operational
performance.
Urucum had a good operational performance, rising 7.0% over 2Q11, still reflecting the benefits of
the arrival of two new trucks and one loader used to transport mine output to the beneficiation
plant, which started to operate at the end of 1Q11.
Morro da Mina, which is part of the other mines, had an output increase of 14.3% over 2Q11. It is
operating at 94% of its nominal capacity, due to higher demand.
In 3Q11, ferroalloy production decreased 9.9% against 2Q11, basically because of corrective
maintenance in plants in Brazil and at Dunkerque.
The production of Mo I Rana was slightly below 2Q11, and 7.5% lower than 3Q10, due to the loss of
productivity caused by the more intense use of the furnaces to produce ferrosilicon managanese
alloys (FeSiMn). In 3Q11, Mo I Rana had two months with continuous production of FeSiMn alloys,
whose price commands a premium over the price of high-carbon manganese alloys (FeMnHc). The
Norwegian plant usually produces FeMnHc, which gives higher productivity in terms of volume of
final product per unit of manganese ore.
Production in 3Q11 was comprised of 56,200 t of FeSiMn, 41,600 t of FeMnHc and 4,700 t of
medium-carbon manganese alloys (FeMnMC).
4
Coal
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
METALLURGICAL COAL |
|
|
818 |
|
|
|
518 |
|
|
|
586 |
|
|
|
2,289 |
|
|
|
1,592 |
|
|
|
13.0 |
% |
|
|
-28.4 |
% |
|
|
-30.4 |
% |
Integra Coal |
|
|
300 |
|
|
|
30 |
|
|
|
82 |
|
|
|
872 |
|
|
|
297 |
|
|
|
173.5 |
% |
|
|
-72.8 |
% |
|
|
-65.9 |
% |
Broadlea |
|
|
0 |
|
|
|
0 |
|
|
|
0 |
|
|
|
101 |
|
|
|
0 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
n.m. |
|
Carborough Downs |
|
|
289 |
|
|
|
368 |
|
|
|
277 |
|
|
|
849 |
|
|
|
876 |
|
|
|
-24.7 |
% |
|
|
-4.2 |
% |
|
|
3.1 |
% |
Moatize |
|
|
|
|
|
|
|
|
|
|
0 |
|
|
|
|
|
|
|
0 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
n.m. |
|
Others |
|
|
229 |
|
|
|
121 |
|
|
|
227 |
|
|
|
466 |
|
|
|
419 |
|
|
|
88.1 |
% |
|
|
-0.8 |
% |
|
|
-10.0 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
THERMAL COAL |
|
|
1,052 |
|
|
|
787 |
|
|
|
1,262 |
|
|
|
2,857 |
|
|
|
2,982 |
|
|
|
60.4 |
% |
|
|
20.0 |
% |
|
|
4.4 |
% |
El Hatillo |
|
|
830 |
|
|
|
698 |
|
|
|
941 |
|
|
|
2,161 |
|
|
|
2,475 |
|
|
|
34.8 |
% |
|
|
13.4 |
% |
|
|
14.5 |
% |
Integra Coal |
|
|
109 |
|
|
|
25 |
|
|
|
107 |
|
|
|
231 |
|
|
|
203 |
|
|
|
325.7 |
% |
|
|
-1.6 |
% |
|
|
-12.3 |
% |
Broadlea1 |
|
|
0 |
|
|
|
0 |
|
|
|
0 |
|
|
|
165 |
|
|
|
0 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
n.m. |
|
Moatize |
|
|
|
|
|
|
|
|
|
|
130 |
|
|
|
|
|
|
|
130 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
n.m. |
|
Others |
|
|
113 |
|
|
|
63 |
|
|
|
84 |
|
|
|
299 |
|
|
|
175 |
|
|
|
32.5 |
% |
|
|
-25.8 |
% |
|
|
-41.5 |
% |
|
|
|
1 |
|
Broadlea Coal is in care and maintenance since December 2009. The washing of the ROM stockpiles was
finalized in June 2010. |
In 3Q11, Vales coal production reached 1.8 Mt, 41.6% higher than the previous quarter,
chiefly due to an increase of 60.4% in thermal coal output. The production of metallurgical coal
totaled 586,000 t and of thermal coal, 1,262,000 t.
Production of metallurgical and thermal coal at Integra Coal in Australia was 82,000t and 107,000t, respectively, in 3Q11. Although the
metallurgical coal output improved from the previous quarter, it continued to be negatively
impacted by the longwall move that started in 2Q11, operating below its normal level. Thermal coal
output showed a significant recovery, rising to 107,000 t from 25,000 t in 2Q11, returning to the
same level of 3Q10. This was caused by the coal flow coming on line from the open cut Western
extension.
Production at Carborough Downs was 277,000 t versus 368,000 t in 2Q11. It was negatively affected
by geological problems with a rock fault during mining, which resulted in lower coal yields with a
high percentage of rock in ROM.
Coal production in other mines totaled 227,000 t of metallurgical coal and 84,000 t of thermal
coal. Although the 3Q11 performance was still affected by the consequences of last years severe
flooding in the state of Queensland, Australia, in 4Q10, it was able to ramp up to the pre-flooding
level.
El Hatillo, our Colombian thermal coal mine, reached a production of 941,000 t, 34.8% higher than
2Q11. This was in line with the ramp-up process to achieve the 4.5 Mtpy production capacity.
Moatize I, the first phase of the Moatize coal project, in the province of Tete, Mozambique,
started production in 3Q11, with 130,000 t of thermal coal. Moatize is our first greenfield coal
project and the first project concluded by Vale on the African continent.
5
BASE METALS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NICKEL |
|
|
44 |
|
|
|
56 |
|
|
|
58 |
|
|
|
114 |
|
|
|
173 |
|
|
|
3.1 |
% |
|
|
30.3 |
% |
|
|
51.8 |
% |
Sudbury |
|
|
6 |
|
|
|
10 |
|
|
|
16 |
|
|
|
14 |
|
|
|
40 |
|
|
|
52.7 |
% |
|
|
157.0 |
% |
|
|
185.7 |
% |
Thompson |
|
|
5 |
|
|
|
7 |
|
|
|
4 |
|
|
|
22 |
|
|
|
19 |
|
|
|
-38.8 |
% |
|
|
-13.6 |
% |
|
|
-12.1 |
% |
Voisey Bay |
|
|
10 |
|
|
|
15 |
|
|
|
16 |
|
|
|
17 |
|
|
|
48 |
|
|
|
3.9 |
% |
|
|
65.2 |
% |
|
|
182.1 |
% |
Sorowako |
|
|
22 |
|
|
|
19 |
|
|
|
16 |
|
|
|
59 |
|
|
|
53 |
|
|
|
-15.7 |
% |
|
|
-26.4 |
% |
|
|
-10.6 |
% |
VNC |
|
|
0 |
|
|
|
2 |
|
|
|
1 |
|
|
|
0 |
|
|
|
4 |
|
|
|
-33.5 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Onça Puma |
|
|
0 |
|
|
|
1 |
|
|
|
2 |
|
|
|
0 |
|
|
|
4 |
|
|
|
113.0 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Others* |
|
|
2 |
|
|
|
2 |
|
|
|
2 |
|
|
|
3 |
|
|
|
6 |
|
|
|
42.6 |
% |
|
|
12.5 |
% |
|
|
134.6 |
% |
|
|
|
* |
|
External feed purchased from third parties and processed into finished nickel in our operations |
Total finished nickel production was 58,000 t in 3Q11, 1,300 t higher than the previous
quarter, reflecting the end of the problem in furnace #2 at the Copper Cliff smelter in Sudbury.
Finished nickel production from Sudbury in 3Q11 was 15,700 t, up 5,400 t from 2Q11, as maintenance
work was successfully completed.
Production at Thompson in 3Q11 was 4,100 t, down 2,600 t from 2Q11 and down 600 t from 3Q10, due to
the scheduled maintenance shutdown period completed in August. The maintenance work encompassed the
mill and the whole process up to refining.
Voiseys Bay production was 16,100 t, up 600 t from 2Q11.
Finished nickel production from the Indonesian operations at Sorowako was 16,000 t, down 3,000 t
from the previous quarter and 5,700 t lower than 3Q10. The decrease was largely due to power
outages.
Vale New Caledonia (VNC) produced 1,300 t of nickel hydroxide cake, a nickel and cobalt
intermediate product resulting from the High Pressure Acid Leaching (HPAL) process. Production was
down 33.5% due to the retention of nickel hydroxide cake to be used in tests of the retrofitting of
the columns, part of the operational process to produce nickel oxide.
Onça Puma line #1 continues to ramp up and achieved a production of 2,300 t in 3Q11. Line #2 is
currently at the commissioning stage and the start up is scheduled to take place in 1Q12.
6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COPPER |
|
|
58 |
|
|
|
63 |
|
|
|
84 |
|
|
|
132 |
|
|
|
217 |
|
|
|
34.3 |
% |
|
|
45.6 |
% |
|
|
64.8 |
% |
Sossego |
|
|
32 |
|
|
|
23 |
|
|
|
31 |
|
|
|
87 |
|
|
|
76 |
|
|
|
34.6 |
% |
|
|
-3.5 |
% |
|
|
-12.1 |
% |
Sudbury |
|
|
14 |
|
|
|
22 |
|
|
|
26 |
|
|
|
20 |
|
|
|
74 |
|
|
|
20.5 |
% |
|
|
89.7 |
% |
|
|
270.2 |
% |
Thompson |
|
|
0 |
|
|
|
0 |
|
|
|
1 |
|
|
|
1 |
|
|
|
1 |
|
|
|
141.8 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Voiseys Bay |
|
|
11 |
|
|
|
11 |
|
|
|
13 |
|
|
|
17 |
|
|
|
37 |
|
|
|
13.3 |
% |
|
|
22.5 |
% |
|
|
118.3 |
% |
Tres Valles |
|
|
|
|
|
|
2 |
|
|
|
2 |
|
|
|
|
|
|
|
6 |
|
|
|
8.9 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Others |
|
|
1 |
|
|
|
4 |
|
|
|
11 |
|
|
|
7 |
|
|
|
23 |
|
|
|
170.4 |
% |
|
|
655.4 |
% |
|
|
222.8 |
% |
Our copper production had a sharp increase, 34.3% on a quarter-on-quarter basis, climbing to
84,300 t in 3Q11, an all-time high mark. With the exception of Tres Valles, all sites showed a
better performance in 3Q11.
Production of copper in concentrates from the Sossego mine at Carajás was 34.6% higher than the
previous quarter and in line with 3Q10 due to the higher volumes of feeds, and also higher grade of
copper received by the processing plant during 3Q11.
Output from our Canadian operations reached 51,200 t in 3Q11, up 11,400 t from 2Q11, mainly due to
the return to full operations at Sudbury, the end of the maintenance period at both Sudbury and
Voiseys Bay and finally by the purchase of copper ore from third parties.
In 3Q11 we bought copper ore from small mines in Canada, equivalent to 11,300 t of copper metal, to
be processed into concentrates and to be sold to clients.
Operations at Tres Valles, in Chile, continued to ramp up to nominal capacity reaching 2,400 t of
copper cathodes in 3Q11. The production was negatively impacted by the adverse weather conditions.
In northern Chile, where Tres Valles is located, the rainy season takes place in the winter season,
June to August. For safety reasons, we were forced to stop the operations for a few days.
7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
|
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COBALT (metric tons) |
|
|
133 |
|
|
|
640 |
|
|
|
667 |
|
|
|
442 |
|
|
|
1,888 |
|
|
|
4.2 |
% |
|
|
400.4 |
% |
|
|
327.6 |
% |
Sudbury |
|
|
39 |
|
|
|
57 |
|
|
|
248 |
|
|
|
45 |
|
|
|
346 |
|
|
|
333.2 |
% |
|
|
538.4 |
% |
|
|
674.8 |
% |
Thompson |
|
|
34 |
|
|
|
41 |
|
|
|
34 |
|
|
|
159 |
|
|
|
127 |
|
|
|
-16.4 |
% |
|
|
2.1 |
% |
|
|
-20.1 |
% |
Voisey Bay |
|
|
60 |
|
|
|
410 |
|
|
|
300 |
|
|
|
235 |
|
|
|
1,137 |
|
|
|
-26.9 |
% |
|
|
397.8 |
% |
|
|
383.3 |
% |
VNC |
|
|
0 |
|
|
|
114 |
|
|
|
58 |
|
|
|
0 |
|
|
|
194 |
|
|
|
-49.0 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Others |
|
|
1 |
|
|
|
18 |
|
|
|
27 |
|
|
|
3 |
|
|
|
83 |
|
|
|
50.3 |
% |
|
|
4089.9 |
% |
|
|
2781.0 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PLATINUM (000 oz troy) |
|
|
3 |
|
|
|
51 |
|
|
|
25 |
|
|
|
10 |
|
|
|
133 |
|
|
|
-49.8 |
% |
|
|
745.6 |
% |
|
|
1.281.9 |
% |
Sudbury |
|
|
3 |
|
|
|
51 |
|
|
|
25 |
|
|
|
10 |
|
|
|
133 |
|
|
|
-49.8 |
% |
|
|
745.6 |
% |
|
|
1.281.9 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PALLADIUM (000 oz troy) |
|
|
7 |
|
|
|
72 |
|
|
|
40 |
|
|
|
25 |
|
|
|
184 |
|
|
|
-44.8 |
% |
|
|
442.6 |
% |
|
|
628.8 |
% |
Sudbury |
|
|
7 |
|
|
|
72 |
|
|
|
40 |
|
|
|
25 |
|
|
|
184 |
|
|
|
-44.8 |
% |
|
|
442.6 |
% |
|
|
628.8 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GOLD (000 oz troy) |
|
|
5 |
|
|
|
95 |
|
|
|
23 |
|
|
|
15 |
|
|
|
149 |
|
|
|
-75.4 |
% |
|
|
403.1 |
% |
|
|
910.8 |
% |
Sudbury |
|
|
5 |
|
|
|
95 |
|
|
|
23 |
|
|
|
15 |
|
|
|
149 |
|
|
|
-75.4 |
% |
|
|
403.1 |
% |
|
|
910.8 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SILVER (000 oz troy) |
|
|
194 |
|
|
|
686 |
|
|
|
572 |
|
|
|
1,049 |
|
|
|
1,853 |
|
|
|
-16.5 |
% |
|
|
194.2 |
% |
|
|
76.5 |
% |
Sudbury |
|
|
194 |
|
|
|
686 |
|
|
|
572 |
|
|
|
1,049 |
|
|
|
1,853 |
|
|
|
-16.5 |
% |
|
|
194.2 |
% |
|
|
76.5 |
% |
Cobalt production in 3Q11 amounted to 667,000 t, up 27,000 t from 2Q11, primarily due to the
return to normalcy of the operations at Sudbury, which was able to offset the lower production at
VNC and Voiseys Bay.
Production of platinum and palladium in 3Q11 was 65,000 troy ounces, 57,000 troy ounces less than
in 2Q11. As a consequence of the long production chain of PGMs, their output in 3Q11 was negatively
impacted by the maintenance stoppage in Sudbury in the previous quarter, which reduced the feed to
our Acton refinery in the UK.
8
FERTILIZER NUTRIENTS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
POTASH |
|
|
155 |
|
|
|
145 |
|
|
|
166 |
|
|
|
493 |
|
|
|
445 |
|
|
|
14.8 |
% |
|
|
7.3 |
% |
|
|
-9.7 |
% |
Taquari-Vassouras |
|
|
155 |
|
|
|
145 |
|
|
|
166 |
|
|
|
493 |
|
|
|
445 |
|
|
|
14.8 |
% |
|
|
7.3 |
% |
|
|
-9.7 |
% |
Reflecting an increase in mined ore grade, Taquari-Vassouras production reached 166,000 t in
3Q11, 14.8% higher than 2Q11 and 7.3% higher than 3Q10.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Phosphate Rock |
|
|
1,407 |
|
|
|
1,858 |
|
|
|
1,925 |
|
|
|
5,689 |
|
|
|
9,903 |
|
|
|
3.6 |
% |
|
|
36.8 |
% |
|
|
74.1 |
% |
Vale Fertilizantes |
|
|
1,198 |
|
|
|
1,272 |
|
|
|
1,274 |
|
|
|
5,480 |
|
|
|
8,072 |
|
|
|
0.1 |
% |
|
|
6.3 |
% |
|
|
47.3 |
% |
Bayóvar |
|
|
209 |
|
|
|
586 |
|
|
|
651 |
|
|
|
209 |
|
|
|
1,832 |
|
|
|
11.2 |
% |
|
|
n.m. |
|
|
|
n.m |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MAP Monoammonium phosphate |
|
|
229 |
|
|
|
131 |
|
|
|
217 |
|
|
|
653 |
|
|
|
557 |
|
|
|
65.7 |
% |
|
|
-5.3 |
% |
|
|
-14.6 |
% |
Vale Fertilizantes |
|
|
229 |
|
|
|
131 |
|
|
|
217 |
|
|
|
653 |
|
|
|
557 |
|
|
|
65.7 |
% |
|
|
-5.3 |
% |
|
|
-14.6 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TSP Triple superphosphate |
|
|
229 |
|
|
|
175 |
|
|
|
199 |
|
|
|
626 |
|
|
|
607 |
|
|
|
13.5 |
% |
|
|
-13.3 |
% |
|
|
-3.1 |
% |
Vale Fertilizantes |
|
|
229 |
|
|
|
175 |
|
|
|
199 |
|
|
|
626 |
|
|
|
607 |
|
|
|
13.5 |
% |
|
|
-13.3 |
% |
|
|
-3.1 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SSP -Single superphosphate |
|
|
525 |
|
|
|
666 |
|
|
|
777 |
|
|
|
1,603 |
|
|
|
1,989 |
|
|
|
16.6 |
% |
|
|
48.0 |
% |
|
|
24.1 |
% |
Vale Fertilizantes |
|
|
525 |
|
|
|
583 |
|
|
|
692 |
|
|
|
1,603 |
|
|
|
1,799 |
|
|
|
18.6 |
% |
|
|
31.8 |
% |
|
|
12.2 |
% |
Vale Cubatão |
|
|
0 |
|
|
|
83 |
|
|
|
85 |
|
|
|
0 |
|
|
|
190 |
|
|
|
2.6 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DCP Dicalcium Phosphate |
|
|
144 |
|
|
|
158 |
|
|
|
154 |
|
|
|
390 |
|
|
|
151 |
|
|
|
-2.8 |
% |
|
|
6.9 |
% |
|
|
-61.4 |
% |
Vale Fertilizantes |
|
|
144 |
|
|
|
158 |
|
|
|
154 |
|
|
|
390 |
|
|
|
151 |
|
|
|
-2.8 |
% |
|
|
6.9 |
% |
|
|
-61.4 |
% |
In February 2001, Vale Fosfatados was incorporated into Vale Fertilizantes. The following assets are now part of Vale
Fertilizantes: two phosphate rock mines, at Araxá, in the state of Minas Gerais, and Cajati, in the state of São Paulo, Brazil.
Alongside the mining operations, the assets also comprise four processing plants for the production of phosphates fertilizers
located at: (a) Araxá, state of Minas Gerais; (b) Cajati, state of São Paulo; (c) Cubatão, state of São Paulo; (d) Guará, state
of São Paulo.
In 3Q11, the total production of phosphate rock, which is used to feed the output of
phosphate nutrients, was 3.6%, higher than last quarter, a slight increase. The total output of
Vale Fertilizantes was in line with 2Q11.
Bayóvar, our Peruvian phosphate rock operation, is in a ramp up process. Its production in 3Q11 was
651,000 t, 11.2% higher than in 2Q11, due to the higher average grade of the feed received by the
plant.
9
The production of MAP (monoammonium phosphate) was 217,000 t, higher by 65.7% quarter-on-quarter,
having recovered from the maintenance stoppages in the last quarter. In 3Q11, the sulfuric acid
plant in Uberaba still suffered some corrective maintenance stoppage, which affected the production
of phosphoric acid, and therefore the production of MAP and TSP (triple superphosphate) relative to
3Q10.
TSP production increased 13.5% compared to 2Q11 reflecting the better performance of the phosphoric
acid plant.
In 3Q11, the production of SSP (single superphosphate) was 16.6% higher than 2Q11,
showing continuous production recovery after the maintenance stoppages and also due to the
increased average grade of the feed received by the plant. Vale Cubatão was acquired from Mosaic in
March 2011, and it had its second full quarter of production in 3Q11, reaching 85.000 t.
DCP (dicalcium phosphate) production was in line with last quarter.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
3Q10 |
|
|
2Q11 |
|
|
3Q11 |
|
|
9M10 |
|
|
9M11 |
|
|
3Q11/2Q11 |
|
|
3Q11/3Q10 |
|
|
9M11/9M10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ammonia |
|
|
108 |
|
|
|
167 |
|
|
|
138 |
|
|
|
368 |
|
|
|
463 |
|
|
|
-17.5 |
% |
|
|
27.8 |
% |
|
|
25.7 |
% |
Vale Fertilizantes |
|
|
108 |
|
|
|
167 |
|
|
|
138 |
|
|
|
368 |
|
|
|
463 |
|
|
|
-17.5 |
% |
|
|
27.8 |
% |
|
|
25.7 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Urea |
|
|
77 |
|
|
|
175 |
|
|
|
134 |
|
|
|
365 |
|
|
|
468 |
|
|
|
-23.6 |
% |
|
|
73.8 |
% |
|
|
28.4 |
% |
Vale Fertilizantes |
|
|
77 |
|
|
|
175 |
|
|
|
134 |
|
|
|
365 |
|
|
|
468 |
|
|
|
-23.6 |
% |
|
|
73.8 |
% |
|
|
28.4 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nitric Acid |
|
|
119 |
|
|
|
121 |
|
|
|
117 |
|
|
|
334 |
|
|
|
345 |
|
|
|
-2.8 |
% |
|
|
-1.4 |
% |
|
|
3.5 |
% |
Vale Fertilizantes |
|
|
119 |
|
|
|
121 |
|
|
|
117 |
|
|
|
334 |
|
|
|
345 |
|
|
|
-2.8 |
% |
|
|
-1.4 |
% |
|
|
3.5 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ammonium Nitrate |
|
|
115 |
|
|
|
114 |
|
|
|
114 |
|
|
|
331 |
|
|
|
331 |
|
|
|
0.1 |
% |
|
|
-0.9 |
% |
|
|
-0.2 |
% |
Vale Fertilizantes |
|
|
115 |
|
|
|
114 |
|
|
|
114 |
|
|
|
331 |
|
|
|
331 |
|
|
|
0.1 |
% |
|
|
-0.9 |
% |
|
|
-0.2 |
% |
In 3Q11, ammonia and urea production decreased by 17.5% and 23.6%, respectively, when
compared to 2Q11, due to the non-scheduled stoppage for maintenance at the ammonia plant,
consequently affecting urea production.
The output of nitric acid and ammonium nitrate was in line with the previous quarter.
For further information. please contact:
+55-21-3814-4540
Roberto Castello Branco: roberto.castello.branco@vale.com
Viktor Moszkowicz: viktor.moszkowicz@vale.com
Carla Albano Miller: carla.albano@vale.com
Andrea Gutman: andrea.gutman@vale.com
Christian Perlingiere: christian.perlingiere@vale.com
Fernando Frey: fernando.frey@vale.com
Marcio Loures Penna: Marcio.penna@vale.com
Samantha Pons: samantha.pons@vale.com
Thomaz Freire: thomaz.freire@vale.com
This press release may include statements that present Vales expectations about future events or
results. All statements, when based upon expectations about the future and not on historical
facts, involve various risks and uncertainties. Vale cannot guarantee that such statements will
prove correct. These risks and uncertainties include factors related to the following: (a) the
countries where we operate, especially Brazil and Canada; (b) the global economy; (c) the capital
markets; (d) the mining and metals prices and their dependence on global industrial production,
which is cyclical by nature; and (e) global competition in the markets in which Vale operates. To
obtain further information on factors that may lead to results different from those forecast by
Vale, please consult the reports Vale files with the U.S. Securities and Exchange Commission (SEC),
the Brazilian Comissão de Valores Mobiliários (CVM), the French Autorité des Marchés Financiers
(AMF), and The Stock Exchange of Hong Kong Limited, and in particular the factors discussed under
Forward-Looking Statements and Risk Factors in Vales annual report on Form 20-F.
10
Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused
this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
|
|
|
|
|
|
|
Vale S.A. |
|
|
|
|
(Registrant) |
|
|
|
|
|
|
|
|
|
Date: October 26, 2011
|
|
By:
|
|
/s/ Roberto Castello Branco
Roberto Castello Branco
|
|
|
|
|
|
|
Director of Investor Relations |
|
|