cafd-10q_20160531.htm

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, DC 20549

 

FORM 10-Q

 

(Mark One)

x

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended May 31, 2016

OR

o

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from _____ to _____

Commission File Number: 001-37447

 

8point3 Energy Partners LP

(Exact Name of Registrant as Specified in its Charter)

 

 

Delaware

47-3298142

( State or other jurisdiction of

incorporation or organization)

(I.R.S. Employer
Identification No.)

77 Rio Robles

San Jose, California

95134

(Address of principal executive offices)

(Zip Code)

Registrant’s telephone number, including area code: (408) 240-5500

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.     Yes  x    No  o  

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).    Yes  x    No  o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

 

Large accelerated filer

 

o

  

Accelerated filer

 

o

 

 

 

 

Non-accelerated filer

 

x  (Do not check if a small reporting company)

  

Small reporting company

 

o

 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).    Yes  o    No  x

As of June 27, 2016, the registrant had outstanding 20,014,658 Class A shares representing limited partner interests and 51,000,000 Class B shares representing limited partner interests.

 

 

 

 

 


Table of Contents

 

 

 

Page

GLOSSARY

2

 

 

PART I.

FINANCIAL INFORMATION

 

Item 1.

Financial Statements (Unaudited)

7

 

Condensed Consolidated Balance Sheets

7

 

Condensed Consolidated Statements of Operations

8

 

Condensed Consolidated Statements of Comprehensive Income (Loss)

9

 

Condensed Consolidated Statements of Shareholders’ Equity

10

 

Condensed Consolidated Statements of Cash Flows

11

 

Notes to Unaudited Condensed Consolidated Financial Statements

13

Item 2.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

37

Item 3.

Quantitative and Qualitative Disclosures About Market Risk

54

Item 4.

Controls and Procedures

54

 

 

 

PART II.

OTHER INFORMATION

 

Item 1.

Legal Proceedings

55

Item 1A.

Risk Factors

55

Item 2.

Unregistered Sales of Equity Securities and Use of Proceeds

55

Item 3.

Defaults Upon Senior Securities

55

Item 4.

Mine Safety Disclosures

55

Item 5.

Other Information

55

Item 6.

Exhibits

56

Signatures

58

Exhibit Index

59

 

 

 

 

i


Table of Contents

 

GLOSSARY

References in this Quarterly Report on Form 10-Q to:

“2015 10-K” refers to our Transition Report on Form 10-K dated January 27, 2016.

“(ac)” refers to alternating current.

“Amended and Restated Omnibus Agreement” refers to the Amended and Restated Omnibus Agreement, dated as of April 6, 2016, among the Partnership, OpCo, the General Partner, Holdings, First Solar and SunPower. Please read Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 12—Related Parties” for further details.

“AMAs” refers to asset management agreements.

“AROs” refers to asset retirement obligations.

“Blackwell Project” refers to the solar energy project located in Kern County, California, that is held by the Blackwell Project Entity and has a nameplate capacity of 12 MW.

“Blackwell Project Entity” refers to Blackwell Solar, LLC.

“C&I Holdings” refers to SunPower Commercial Holding Company I, LLC, an indirect subsidiary of OpCo and the holder of the Macy’s California Project Entities and the UC Davis Project Entity.

“C&I Project Entities” refers to, collectively, the Kern Project Entity, the Macy’s California Project Entities and the UC Davis Project Entity.

“COD” refers to the commercial operation date.

“DG Solar” refers to distributed solar generation.  DG Solar systems are deployed at the site of end-use, such as businesses and homes.

“EPC” refers to engineering, procurement and construction.

“Exchange Act” refers to the Securities Exchange Act of 1934, as amended.

“FASB” refers to the Financial Accounting Standards Board.

“First Solar” refers to First Solar, Inc., a corporation formed under the laws of the State of Delaware, in its individual capacity or to First Solar, Inc. and its subsidiaries, as the context requires. Unless otherwise specifically noted, references to First Solar and its subsidiaries exclude us, the General Partner, Holdings and our subsidiaries, including OpCo.

“First Solar MSA” refers to the Management Services Agreement, dated as of June 24, 2015, as amended, among the Partnership, OpCo, the General Partner and First Solar 8point3 Management Services, LLC.

“First Solar ROFO Agreement” refers to the Right of First Offer Agreement, dated as of June 24, 2015, by and between OpCo and First Solar. On March 28, 2016, OpCo and First Solar entered into an amendment and waiver to the First Solar ROFO Agreement. On June 28, 2016, OpCo and First Solar entered into an Amendment and Waiver No. 2 to the First Solar ROFO Agreement. Please read Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 12—Related Parties” and Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 15—Subsequent Events” for further details.

“First Solar ROFO Projects” refers to, collectively, (i) the projects set forth in the chart in Part I, Item 1 of the 2015 10-K, under the heading “Business—Our Portfolio—ROFO Projects” with First Solar listed as the “Developing Sponsor” and as to which we have a right of first offer under the First Solar ROFO Agreement should First Solar decide to sell them (but excluding (a) the Kingbird Project, which we acquired on March 31, 2016, as further described in Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 2—Business Combinations—2016 Acquisitions,” (b) approximately

 

2


Table of Contents

 

50% of First Solar’s indirect interest in the Stateline facility, as further described in Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 12—Related Parties,” and (c) First Solar’s indirect interest in the Moapa facility, as further described in Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 15—Subsequent Events), (ii) First Solar’s 100 MW Switch Station 1 and 79-MW Switch Station 2 facilities in Clark County, Nevada and (iii) First Solar’s 130 MW California Flats and 150 MW California Flats facilities in Monterey County, California.

“General Partner” or “our general partner” refers to 8point3 General Partner, LLC, our general partner, a limited liability company formed under the laws of the State of Delaware by Holdings.

“GW” refers to a gigawatt, or 1,000,000,000 watts. As used in this Quarterly Report on Form 10-Q, all references to watts (e.g., MW or GW) refer to measurements of alternating current, except where otherwise noted.

“Holdings” refers to 8point3 Holding Company, LLC, a limited liability company formed under the laws of the State of Delaware by First Solar and SunPower and the parent of the General Partner.

“Hooper Class B Partnership” refers to SSCO III Class B Holdings, LLC.

“Hooper Project” refers to the solar energy project located in Alamosa County, Colorado, that is held by the Hooper Project Entity and has a nameplate capacity of 50 MW.

“Hooper Project Entity” refers to Solar Star Colorado III, LLC.

“IPO” refers to the Partnership’s initial public offering, which was completed on June 24, 2015.

“IPO First Solar Project Entities” refers to the Lost Hills Project Entity, the Blackwell Project Entity, the Maryland Solar Project Entity, the North Star Project Entity and the Solar Gen 2 Project Entity and, with respect to certain of the foregoing, one or more of its direct or indirect holding companies.

“IPO Project Entities” refers to, collectively, the IPO First Solar Project Entities and the IPO SunPower Project Entities.

“IPO SunPower Project Entities” refers to the Macy’s California Project Entities, the Quinto Project Entity, the RPU Project Entity, the UC Davis Project Entity and the Residential Portfolio Project Entity and, with respect to certain of the foregoing, one or more of its direct or indirect holding companies.

“ITCs” refers to investment tax credits.

“Kern Class B Partnership” refers to SunPower Commercial II Class B, LLC.

“Kern Phase 1(a) Assets” refers to the assets comprising the first phase of the Kern Project, with a nameplate capacity of 3 MW.

“Kern Project” refers to the solar energy project located in Kern County, California, that is held by the Kern Project Entity. OpCo’s acquisition of the Kern Project will be effectuated in three phases, with the closing of the first phase, reflecting a nameplate capacity of 3 MW, having occurred on January 26, 2016. The initial phase of OpCo’s acquisition of the Kern Project is referred to herein as the “Kern Phase 1(a) Acquisition”. The closings of the second and third phases, reflecting an aggregate nameplate capacity of 17 MW, are expected to occur in the fiscal quarter ending August 31, 2016 and in the fiscal quarter ending November 30, 2016, respectively.

“Kern Project Entity” refers to Kern High School District Solar (2), LLC.

“Kingbird Project” refers to the solar energy project located in Kern County, California, that is held by the Kingbird Project Entities and has an aggregate nameplate capacity of 40 MW.

“Kingbird Project Entities” refers to, collectively, Kingbird Solar A, LLC and Kingbird Solar B, LLC.

 

3


Table of Contents

 

“Lost Hills Blackwell Holdings” refers to Lost Hills Blackwell Holdings, LLC.

“Lost Hills Blackwell Project” refers to the solar energy project held collectively by the Lost Hills Project Entity and the Blackwell Project Entity that is comprised of the Lost Hills Project and the Blackwell Project and has a nameplate capacity of 32 MW.

“Lost Hills Project” refers to the solar energy project located in Kern County, California, that is held by the Lost Hills Project Entity and has a nameplate capacity of 20 MW.

“Lost Hills Project Entity” refers to Lost Hills Solar, LLC.

“Macy’s California Project” refers to the solar energy project consisting of seven sites in Northern California that is held by the Macy’s California Project Entities and has an aggregate nameplate capacity of 3 MW.

“Macy’s California Project Entities” refers to, collectively, Solar Star California XXX, LLC and Solar Star California XXX (2), LLC.

“Macy’s Maryland Project” refers to the solar energy project which holds roof-mounted solar photovoltaic systems with an aggregate system size of approximately 5 MW, which is being installed at certain Macy’s department stores in Maryland and is held by the Macy’s Maryland Project Entity.

“Macy’s Maryland Project Entity” refers to Northstar Macys Maryland 2015, LLC.

“Maryland Solar Project” refers to the solar energy project located in Washington County, Maryland, that is held by the Maryland Solar Project Entity and has a nameplate capacity of 20 MW.

“Maryland Solar Project Entity” refers to Maryland Solar LLC.

“MSAs” refers, collectively, to the First Solar MSA and the SunPower MSA.

“MW” refers to a megawatt, or 1,000,000 watts. As used in this Quarterly Report on Form 10-Q, all references to watts (e.g., MW or GW) refer to measurements of alternating current, except where otherwise noted.

“North Star Holdings” refers to NS Solar Holdings, LLC.

“North Star Project” refers to the solar energy project located in Fresno County, California, that is held by the North Star Project Entity and has a nameplate capacity of 60 MW.

“North Star Project Entity” refers to North Star Solar, LLC.

“O&M” refers to operations and maintenance services.

“OECD” refers to the Organization for Economic Co-operation and Development, the membership of which consists of: Australia, Austria, Belgium, Canada, Chile, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Israel, Italy, Japan, Luxembourg, Mexico, Netherlands, New Zealand, Norway, Poland, Portugal, Slovak Republic, Slovenia, South Korea, Spain, Sweden, Switzerland, Turkey, United Kingdom and United States.

“offtake agreements” refers to PPAs, leases and other offtake agreements.

“offtake counterparties” refers to the customer under a PPA lease or other offtake agreement.

“OpCo” refers to 8point3 Operating Company, LLC and its subsidiaries.

“Original Omnibus Agreement” refers to the Omnibus Agreement, dated as of June 24, 2015, as amended, among the Partnership, OpCo, the General Partner, Holdings, First Solar and SunPower. The Original Omnibus Agreement has been superseded by the Amended and Restated Omnibus Agreement. Please read Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 12—Related Parties” for further details.

 

4


Table of Contents

 

“Partnership Agreement” refers to our partnership agreement.

“PG&E” refers to Pacific Gas and Electric Company.

“Portfolio” refers to, collectively, our portfolio of solar energy projects as of May 31, 2016, which consists of the Hooper Project, the Kern Phase 1(a) Assets, the Kingbird Project, the Lost Hills Blackwell Project, the Macy’s California Project, the Maryland Solar Project, the North Star Project, the Quinto Project, the Solar Gen 2 Project, the RPU Project, the UC Davis Project and the Residential Portfolio.

“PPA” refers to a power purchase agreement.

“Predecessor” refers to the operation of the IPO SunPower Project Entities prior to the completion of the IPO.

“Project Entities” refers to, collectively, the IPO First Solar Project Entities, the IPO SunPower Project Entities, the Kern Project Entity, the Kingbird Project Entities and the Hooper Project Entity.

“Quinto Holdings” refers to SSCA XIII Holding Company, LLC, an indirect subsidiary of OpCo and the indirect holder of the Quinto Project Entity.

“Quinto Project” refers to the solar energy project located in Merced County, California, that is held by the Quinto Project Entity and has a nameplate capacity of 108 MW.

“Quinto Project Entity” refers to Solar Star California XIII, LLC.

“Residential Portfolio” refers to the approximately 5,900 solar installations located at homes in Arizona, California, Colorado, Hawaii, Massachusetts, New Jersey, New York, Pennsylvania and Vermont, that is held by the Residential Portfolio Project Entity and has an aggregate nameplate capacity of 39 MW.

“Residential Portfolio Project Entity” refers to SunPower Residential I, LLC.

“ROFO Projects” refers to, collectively, the First Solar ROFO Projects and the SunPower ROFO Projects.

“RPS” refers to renewable portfolio standards mandated by state law that require a regulated retail electric utility to procure a specified percentage of its total electricity delivered to retail customers in the state from eligible renewable energy resources, such as solar energy projects, by a specified date.

“RPU Holdings” refers to SSCA XXXI Holding Company, LLC, an indirect subsidiary of OpCo and the holder of the RPU Project Entity.

“RPU Project” refers to the solar energy project located in Riverside, California, that is held by the RPU Project Entity and has a nameplate capacity of 7 MW.

“RPU Project Entity” refers to Solar Star California XXXI, LLC.

“SDG&E” refers to San Diego Gas & Electric Company.

“SG&A” refers to selling, general and administrative services.

“SG2 Holdings” refers to SG2 Holdings, LLC.

“Solar Gen 2 Project” refers to the solar energy project located in Imperial County, California, that is held by the Solar Gen 2 Project Entity and has a nameplate capacity of 150 MW.

“Solar Gen 2 Project Entity” refers to SG2 Imperial Valley, LLC.

“SP Holding Companies” refers, collectively, to Quinto Holdings, RPU Holdings and C&I Holdings.

 

5


Table of Contents

 

“Sponsors” refers, collectively, to First Solar and SunPower.

“SunPower” refers to SunPower Corporation, a corporation formed under the laws of the State of Delaware, in its individual capacity or to SunPower Corporation and its subsidiaries, as the context requires. Unless otherwise specifically noted, references to SunPower and its subsidiaries exclude us, the General Partner, Holdings and our subsidiaries, including OpCo.

“SunPower Capital” refers to SunPower Capital Services, LLC, a wholly owned subsidiary of SunPower.

“SunPower MSA” refers to the Management Services Agreement, dated as of June 24, 2015, as amended, among the Partnership, OpCo, the General Partner and SunPower Capital.

“SunPower ROFO Agreement” refers to the Right of First Offer Agreement, dated as of June 24, 2015, by and between OpCo and SunPower.

“SunPower ROFO Projects” refers to, collectively, the projects set forth in the chart in Part I, Item 1 of the 2015 10-K, under the heading “Business—Our Portfolio—ROFO Projects” with SunPower listed as the Developing Sponsor and as to which we have a right of first offer under the SunPower ROFO Agreement should SunPower decide to sell them (but excluding (a) the Hooper Project, which we acquired on April 1, 2016, as further described in Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 2—Business Combinations—2016 Acquisitions,” (b) the Macy’s Maryland Project, which we entered into an agreement to acquire on June 29, 2016 and which we expect to acquire on July 1, 2016, as further described in Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 15—Subsequent Events,” and (c) the Kern Project, which we entered into an agreement to acquire on January 26, 2016 and which we acquired the Phase 1(a) Assets on January 26, 2016 and expect to acquire the Phase 1(b) assets and Phase 2 assets later this year, as further described in Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 2—Business Combinations—2016 Acquisitions”).

“UC Davis Project” refers to the solar energy project located in Solano County, California, that is held by the UC Davis Project Entity and has a nameplate capacity of 13 MW.

“UC Davis Project Entity” refers to Solar Star California XXXII, LLC.

“U.S. GAAP” refers to U.S. generally accepted accounting principles.

“Utility Project Entities” refers to the Hooper Project Entity, the Kingbird Project Entities, the Lost Hills Project Entity, the Blackwell Project Entity, the Maryland Solar Project Entity, the North Star Project Entity, the Quinto Project Entity, the RPU Project Entity and the Solar Gen 2 Project Entity.

 

 

 

 

 

6


Table of Contents

 

PART I—FINANCIAL INFORMATION

 

Item 1. Financial Statements.

8point3 Energy Partners LP

Condensed Consolidated Balance Sheets

(In thousands, except share data)

(Unaudited)

 

 

 

May 31,

 

 

November 30,

 

 

 

2016

 

 

2015

 

Assets

 

 

 

 

 

 

 

 

Current assets:

 

 

 

 

 

 

 

 

Cash and cash equivalents

 

$

19,995

 

 

$

56,781

 

Accounts receivable and short-term financing receivables, net

 

 

8,151

 

 

 

4,289

 

Prepaid and other current assets1

 

 

11,485

 

 

 

8,033

 

Total current assets

 

 

39,631

 

 

 

69,103

 

Property and equipment, net

 

 

680,067

 

 

 

486,942

 

Long-term financing receivables, net

 

 

81,724

 

 

 

83,376

 

Investments in unconsolidated affiliates

 

 

348,588

 

 

 

352,070

 

Other long-term assets

 

 

25,155

 

 

 

26,142

 

Total assets

 

$

1,175,165

 

 

$

1,017,633

 

Liabilities and Equity

 

 

 

 

 

 

 

 

Current liabilities:

 

 

 

 

 

 

 

 

Accounts payable and other current liabilities1

 

$

8,209

 

 

$

2,612

 

Short-term debt and financing obligations

 

 

1,964

 

 

 

1,964

 

Deferred revenue, current portion

 

 

512

 

 

 

489

 

Total current liabilities

 

 

10,685

 

 

 

5,065

 

Long-term debt and financing obligations

 

 

362,503

 

 

 

297,206

 

Deferred revenue, net of current portion

 

 

655

 

 

 

746

 

Other long-term liabilities

 

 

34,251

 

 

 

22,483

 

Total liabilities

 

 

408,094

 

 

 

325,500

 

Redeemable noncontrolling interests

 

 

22,549

 

 

 

89,747

 

Commitments and contingencies (Note 5)

 

 

 

 

 

 

 

 

Equity:

 

 

 

 

 

 

 

 

Class A shares, 20,014,658 and 20,007,281 issued and outstanding as of May 31,

   2016 and November 30, 2015, respectively

 

 

392,860

 

 

 

392,748

 

Class B shares, 51,000,000 issued and outstanding as of May 31, 2016

   and November 30, 2015

 

 

 

 

 

 

Accumulated earnings

 

 

22,075

 

 

 

15,580

 

Total shareholders' equity attributable to 8point3 Energy Partners LP

 

 

414,935

 

 

 

408,328

 

Noncontrolling interests

 

 

329,587

 

 

 

194,058

 

Total equity

 

 

744,522

 

 

 

602,386

 

Total liabilities and equity

 

$

1,175,165

 

 

$

1,017,633

 

1

The Partnership has related-party balances for transactions made with the Sponsors. Related-party balances recorded within “Prepaid and other current assets” in the unaudited condensed consolidated balance sheets were $1.0 million and $0.9 million as of May 31, 2016 and November 30, 2015, respectively. Related-party balances recorded within “Accounts payable and other current liabilities” in the unaudited condensed consolidated balance sheets were $3.6 million and $0.2 million as of May 31, 2016 and November 30, 2015, respectively.  

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

 

7


Table of Contents

 

8point3 Energy Partners LP

Condensed Consolidated Statements of Operations

(In thousands, except per share data)

(Unaudited)

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Revenues:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating revenues1

 

$

13,517

 

 

$

2,179

 

 

$

20,619

 

 

$

4,313

 

Total revenues

 

 

13,517

 

 

 

2,179

 

 

 

20,619

 

 

 

4,313

 

Operating costs and expenses1:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cost of operations

 

 

1,759

 

 

 

252

 

 

 

3,025

 

 

 

2,310

 

Cost of operations—SunPower, prior to IPO

 

 

 

 

 

234

 

 

 

 

 

 

468

 

Selling, general and administrative

 

 

1,656

 

 

 

4,519

 

 

 

3,292

 

 

 

7,798

 

Depreciation, amortization and accretion

 

 

5,388

 

 

 

748

 

 

 

10,014

 

 

 

1,478

 

Acquisition-related transaction costs

 

 

829

 

 

 

 

 

 

1,662

 

 

 

 

Total operating costs and expenses

 

 

9,632

 

 

 

5,753

 

 

 

17,993

 

 

 

12,054

 

Operating income (loss)

 

 

3,885

 

 

 

(3,574

)

 

 

2,626

 

 

 

(7,741

)

Other expense (income):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interest expense

 

 

3,051

 

 

 

480

 

 

 

5,924

 

 

 

1,526

 

Interest income

 

 

(328

)

 

 

(1,064

)

 

 

(613

)

 

 

(1,064

)

Other expense (income)

 

 

(334

)

 

 

7,977

 

 

 

(260

)

 

 

11,925

 

Total other expense, net

 

 

2,389

 

 

 

7,393

 

 

 

5,051

 

 

 

12,387

 

Income (loss) before income taxes

 

 

1,496

 

 

 

(10,967

)

 

 

(2,425

)

 

 

(20,128

)

Income tax provision

 

 

(6,681

)

 

 

(103

)

 

 

(10,218

)

 

 

(109

)

Equity in earnings of unconsolidated investees

 

 

5,024

 

 

 

218

 

 

 

5,429

 

 

 

218

 

Net loss

 

 

(161

)

 

 

(10,852

)

 

 

(7,214

)

 

 

(20,019

)

Less: Predecessor loss prior to IPO on June 24, 2015

 

 

 

 

 

(10,928

)

 

 

 

 

 

(20,095

)

    Net income (loss) subsequent to IPO

 

 

(161

)

 

 

76

 

 

 

(7,214

)

 

 

76

 

Less: Net loss attributable to noncontrolling interests and

   redeemable noncontrolling interests

 

 

(10,183

)

 

 

(69

)

 

 

(22,544

)

 

 

(69

)

Net income attributable to 8point3 Energy Partners LP

   Class A shares

 

$

10,022

 

 

$

145

 

 

$

15,330

 

 

$

145

 

Net income per Class A share:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

$

0.50

 

 

$

0.01

 

 

$

0.77

 

 

$

0.01

 

Diluted

 

$

0.50

 

 

$

0.01

 

 

$

0.77

 

 

$

0.01

 

Distributions per Class A share:

 

$

0.22

 

 

$

 

 

$

0.44

 

 

$

 

Weighted average number of Class A shares:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic

 

 

20,011

 

 

 

20,000

 

 

 

20,009

 

 

 

20,000

 

Diluted

 

 

35,511

 

 

 

32,500

 

 

 

35,509

 

 

 

32,500

 

 

1

The Partnership has related-party activities for transactions made with the Sponsors. Related party transactions recorded within “Operating revenues” in the unaudited condensed consolidated statement of operations were $1.3 million and $2.6 million for the three and six months ended May 31, 2016, respectively, and $0.1 million for each of the three and six months ended June 28, 2015. Related party transactions recorded within “Operating costs and expenses” in the unaudited condensed consolidated statement of operations were $1.7 million and $3.1 million for the three and six months ended May 31, 2016, respectively, and $0.2 million and $0.5 million for the three and six months ended June 28, 2015, respectively.

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

8


Table of Contents

 

8point3 Energy Partners LP

Condensed Consolidated Statements of Comprehensive Income (Loss)

(In thousands)

(Unaudited)

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Net loss

 

$

(161

)

 

$

(10,852

)

 

$

(7,214

)

 

$

(20,019

)

Other comprehensive income:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unrealized gain on cash flow hedges

 

 

 

 

 

6,158

 

 

 

 

 

 

3,156

 

Total comprehensive loss

 

 

(161

)

 

 

(4,694

)

 

 

(7,214

)

 

 

(16,863

)

Less: Predecessor comprehensive loss prior to

   IPO on June 24, 2015

 

 

 

 

 

(4,770

)

 

 

 

 

 

(16,939

)

Comprehensive income (loss) subsequent to IPO

 

 

(161

)

 

 

76

 

 

 

(7,214

)

 

 

76

 

Less: comprehensive loss attributable to noncontrolling

   interests and redeemable noncontrolling interests

 

 

(10,183

)

 

 

(69

)

 

 

(22,544

)

 

 

(69

)

Comprehensive income attributable to 8point3 Energy Partners LP

   Class A shares

 

$

10,022

 

 

$

145

 

 

$

15,330

 

 

$

145

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

 

 

 

9


Table of Contents

 

8point3 Energy Partners LP

Condensed Consolidated Statements of Shareholders’ Equity

(In thousands, except share data)

(Unaudited)

 

 

 

Redeemable

Noncontrolling

 

 

Class A Shares

 

 

Class B Shares

 

 

Accumulated

 

 

Total

Shareholders'

 

 

Noncontrolling

 

 

 

 

 

 

 

Interests

 

 

Shares

 

 

Amount

 

 

Shares

 

 

Amount

 

 

Earnings

 

 

Equity

 

 

Interests

 

 

Total Equity

 

Balance as of November 30, 2015

 

$

89,747

 

 

 

20,007,281

 

 

$

392,748

 

 

 

51,000,000

 

 

$

 

 

$

15,580

 

 

$

408,328

 

 

$

194,058

 

 

$

602,386

 

Noncontrolling interests obtained through acquisition

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

36,252

 

 

 

36,252

 

Cash and accrued distributions to noncontrolling

   interests - tax equity investors

 

 

(1,819

)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(740

)

 

 

(740

)

Share-based compensation

 

 

 

 

 

7,377

 

 

 

112

 

 

 

 

 

 

 

 

 

 

 

 

112

 

 

 

 

 

 

112

 

Contributions from SunPower

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9,973

 

 

 

9,973

 

Contributions from tax equity investors

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

47,209

 

 

 

47,209

 

Cash distributions to Class A shareholders

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(8,835

)

 

 

(8,835

)

 

 

 

 

 

(8,835

)

Net income (loss)

 

 

(65,379

)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15,330

 

 

 

15,330

 

 

 

42,835

 

 

 

58,165

 

Balance as of May 31, 2016

 

$

22,549

 

 

 

20,014,658

 

 

$

392,860

 

 

 

51,000,000

 

 

$

 

 

$

22,075

 

 

$

414,935

 

 

$

329,587

 

 

$

744,522

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

 

 

10


Table of Contents

 

8point3 Energy Partners LP

Condensed Consolidated Statements of Cash Flows

(In thousands)

(Unaudited)

 

 

Six Months Ended

 

 

 

May 31,

 

 

June 28,

 

 

 

2016

 

 

2015

 

Cash flows from operating activities:

 

 

 

 

 

 

 

 

Net loss

 

$

(7,214

)

 

$

(20,019

)

Adjustments to reconcile net loss to net cash provided by (used in) operating activities:

 

 

 

 

 

 

 

 

Depreciation, amortization and accretion

 

 

10,014

 

 

 

1,488

 

Loss on cash flow hedges

 

 

 

 

 

3,242

 

Unrealized gain on interest rate swap

 

 

(251

)

 

 

 

Interest expense on financing obligation

 

 

 

 

 

1,193

 

Loss on termination of financing obligation

 

 

 

 

 

6,478

 

Reserve for rebates receivable

 

 

 

 

 

1,338

 

Cash distributions from unconsolidated investees

 

 

7,718

 

 

 

 

Equity in earnings of unconsolidated investees

 

 

(5,429

)

 

 

(218

)

Deferred income taxes

 

 

10,218

 

 

 

97

 

Share-based compensation

 

 

112

 

 

 

 

Amortization of debt issuance costs

 

 

306

 

 

 

 

Changes in allowance for doubtful accounts

 

 

166

 

 

 

 

Changes in operating assets and liabilities:

 

 

 

 

 

 

 

 

Accounts receivable and financing receivable, net

 

 

(2,432

)

 

 

(332

)

Cash grants receivable

 

 

 

 

 

146

 

Rebates receivable

 

 

 

 

 

(121

)

Solar power systems to be leased under sales type leases

 

 

 

 

 

160

 

Prepaid and other current assets

 

 

(464

)

 

 

(3,632

)

Deferred revenue

 

 

(68

)

 

 

(479

)

Accounts payable and other current liabilities

 

 

951

 

 

 

1,326

 

Net cash provided by (used in) operating activities

 

 

13,627

 

 

 

(9,333

)

Cash flows from investing activities:

 

 

 

 

 

 

 

 

Cash provided by (used in) purchases of property and equipment, net

 

 

1,143

 

 

 

(224,018

)

Cash paid for acquisitions

 

 

(117,974

)

 

 

 

Distributions from unconsolidated investees

 

 

1,193

 

 

 

 

Net cash used in investing activities

 

 

(115,638

)

 

 

(224,018

)

Cash flows from financing activities:

 

 

 

 

 

 

 

 

Proceeds from issuance of Class A shares, net of issuance costs

 

 

 

 

 

393,750

 

Proceeds from issuance of bank loans, net of issuance costs

 

 

64,991

 

 

 

461,192

 

Repayment of bank loans

 

 

 

 

 

(264,143

)

Capital contributions from SunPower

 

 

9,973

 

 

 

337,793

 

Cash distribution to SunPower at IPO

 

 

 

 

 

(371,527

)

Cash distribution to FirstSolar at IPO

 

 

 

 

 

(283,697

)

Capital distribution to SunPower

 

 

 

 

 

(3,162

)

Cash distribution to Class A members

 

 

(8,835

)

 

 

 

Cash contributions from noncontrolling interests and redeemable

   noncontrolling interests - tax equity investors

 

 

372

 

 

 

1,039

 

Cash distributions to noncontrolling interests and redeemable

   noncontrolling interests - tax equity investors

 

 

(1,276

)

 

 

 

Net cash provided by financing activities

 

 

65,225

 

 

 

271,245

 

Net increase (decrease) in cash and cash equivalents

 

 

(36,786

)

 

 

37,894

 

Cash and cash equivalents, beginning of period

 

 

56,781

 

 

 

 

Cash and cash equivalents, end of period

 

$

19,995

 

 

$

37,894

 

Noncash transactions:

 

 

 

 

 

 

 

 

Assignment of financing receivables to a third-party financial institution

 

$

 

 

$

1,279

 

Property and equipment acquisitions funded by liabilities

 

 

3,435

 

 

 

 

ARO assumed through acquisition

 

 

1,528

 

 

 

2,130

 

Change in ARO assets and liabilities

 

 

(224

)

 

 

4,570

 

Predecessor liabilities assumed by SunPower

 

 

 

 

 

48,588

 

Issuance by OpCo of OpCo common units, subordinated units and IDR for acquisition of

   interests in First Solar Project Entities

 

 

 

 

 

408,820

 

 

11


Table of Contents

 

Settlement of related party payable by capital contribution from tax equity investor

 

 

46,837

 

 

 

 

Accrued distributions to noncontrolling interests and redeemable

   noncontrolling interests - tax equity investors

 

 

1,616

 

 

 

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

 

12


Table of Contents

 

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements

 

 

Note 1. Description of Business and Basis of Presentation

The Partnership

8point3 Energy Partners LP (together with its subsidiaries, the “Partnership”) is a limited partnership formed on March 10, 2015 under a master formation agreement by SunPower Corporation (“SunPower”) and First Solar, Inc. (“First Solar” and, together with SunPower, the “Sponsors”) to own, operate and acquire solar energy generation systems. The Partnership’s initial public offering (the “IPO”) was completed on June 24, 2015. 8point3 General Partner, LLC (the “General Partner”), the Partnership’s general partner, is a wholly-owned subsidiary of 8point3 Holding Company, LLC (“Holdings”), an entity owned by SunPower and First Solar.  As of May 31, 2016, 8point3 Energy Partners LP owned a controlling non-economic managing member interest in 8point3 Operating Company, LLC (“OpCo”) and a 28.2% limited liability company interest in OpCo, and the Sponsors collectively owned a noncontrolling 71.8% limited liability company interest in OpCo.

The following table provides an overview of the assets that comprise the Partnership’s portfolio (the “Portfolio”):

 

 

 

 

 

 

 

 

 

 

 

Remaining

 

 

 

 

 

 

 

 

 

 

 

Term of

 

 

 

Commercial

 

 

 

 

 

 

 

Offtake Agreement

 

Project

 

Operation Date(1)

 

MW(ac)(2)

 

 

Counterparty

 

(in years)(3)

 

Utility

 

 

 

 

 

 

 

 

 

 

 

 

Maryland Solar

 

February 2014

 

 

20

 

 

First Energy

Solutions

 

 

16.8

 

Solar Gen 2

 

November 2014

 

 

150

 

 

San Diego Gas &

Electric

 

 

23.5

 

Lost Hills Blackwell

 

April 2015

 

 

32

 

 

City of

Roseville/Pacific

Gas and Electric

 

27.6(4)

 

North Star

 

June 2015

 

 

60

 

 

Pacific Gas and

Electric

 

 

19.1

 

RPU

 

September 2015

 

 

7

 

 

City of Riverside

 

 

24.3

 

Quinto

 

November 2015

 

 

108

 

 

Southern California

Edison

 

 

19.5

 

Hooper

 

December 2015

 

 

50

 

 

Public Service

Company of Colorado

 

 

19.6

 

Kingbird

 

April 2016

 

 

40

 

 

Southern California

Public Power Authority (5)

 

 

19.9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Commercial & Industrial

 

 

 

 

 

 

 

 

 

 

 

 

UC Davis

 

September 2015

 

 

13

 

 

University of

California

 

 

19.3

 

Macy's California

 

October 2015

 

 

3

 

 

Macy's Corporate

Services

 

 

19.4

 

Kern Phase 1(a) Assets

 

December 2016

 

 

3

 

 

Kern High School District

 

 

20.0

 

Residential Portfolio

 

June 2014

 

 

39

 

 

Approx. 5,900

homeowners(6)

 

16.3(7)

 

Total

 

 

 

 

525

 

 

 

 

 

 

 

 

 

 

(1)

For the Macy’s California Project and the Kern Phase 1(a) Assets (as defined below), commercial operation date (“COD”) represents the first date on which all of the solar generation systems within each of the Macy’s California Project and the Kern Phase 1(a) Assets, respectively, have achieved or are expected to achieve COD. Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details on the Kern Phase 1(a) Assets. For the Residential Portfolio, COD represents the first date on which all of the residential systems within the Residential Portfolio have achieved COD.

 

13


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

 

(2)

The megawatts (“MW”) for the projects in which the Partnership owns less than a 100% interest or in which the Partnership is the lessor under any sale-leaseback financing are shown on a gross basis. 

 

(3)

Remaining term of offtake agreement is measured from the later of May 31, 2016 or the COD of the applicable project.

 

(4)

Remaining term comprised of 2.6 years on a power purchase agreement (“PPA”) with the City of Roseville, California, followed by a 25-year PPA with Pacific Gas and Electric Company (“PG&E”) starting in 2019.

 

(5)

The Kingbird Project is subject to two separate PPAs with member cities of the Southern California Public Power Authority.

 

(6)

Comprised of the approximately 5,900 solar installations located at homes in Arizona, California, Colorado, Hawaii, Massachusetts, New Jersey, New York, Pennsylvania and Vermont, that are held by SunPower Residential I, LLC (the “Residential Portfolio Project Entity”) and has an aggregate nameplate capacity of 39 MW.

 

(7)

Remaining term is the weighted average duration of all of the residential leases, in each case measured from May 31, 2016.

Basis of Presentation and Preparation

The direct and indirect contributions of the IPO Project Entities (as defined below) by the Sponsors to OpCo in connection with the IPO resulted in a business combination for accounting purposes with the IPO SunPower Project Entities (as defined below) being considered the acquirer of the interests contributed by First Solar in the IPO First Solar Project Entities (as defined below). Therefore, the IPO SunPower Project Entities constitute the “Predecessor.” As used herein, the term “IPO Project Entities” refers to:

 

·

the IPO SunPower Project Entities, including:

 

·

Solar Star California XXX, LLC and Solar Star California XXX (2), LLC (collectively, the “Macy’s California Project Entities”), which hold the Macy’s California Project (as defined in the glossary in this Quarterly Report on Form 10-Q (the “Glossary”));

 

·

Solar Star California XIII, LLC (the “Quinto Project Entity”), which holds the Quinto Project (as defined in the Glossary);

 

·

Solar Star California XXXI, LLC (the “RPU Project Entity”), which holds the RPU Project (as defined in the Glossary);

 

·

Solar Star California XXXII, LLC (the “UC Davis Project Entity”), which holds the UC Davis Project (as defined in the Glossary);

 

·

the Residential Portfolio Project Entity, which holds the Residential Portfolio Project (as defined in the Glossary); and

 

·

the IPO First Solar Project Entities, including:

 

·

Lost Hills Solar, LLC (the “Lost Hills Project Entity”), which holds the Lost Hills Project, and Blackwell Solar, LLC (the “Blackwell Project Entity”), which holds the Blackwell Project (the Lost Hills Project and the Blackwell Project, each defined in the Glossary, together constitute the “Lost Hills Blackwell Project”);

 

·

Maryland Solar LLC (the “Maryland Solar Project Entity”), which holds the Maryland Solar Project (as defined in the Glossary);

 

·

North Star Solar, LLC (the “North Star Project Entity”), which holds the North Star Project (as defined in the Glossary); and

 

·

SG2 Imperial Valley, LLC (the “Solar Gen 2 Project Entity”), which holds the Solar Gen 2 Project (as defined in the Glossary).

In connection with the IPO, SunPower contributed a nearly 100% interest in each of the IPO SunPower Project Entities to OpCo, subject, in the case of the Quinto Project, the RPU Project, the UC Davis Project and the Macy’s California Project, to the tax equity investor’s right to a varying portion of the cash flows from the projects. In connection with the IPO, First Solar directly contributed to OpCo a 100% interest in the Maryland Solar Project Entity and indirectly contributed to OpCo a 49% economic interest in each of the Lost Hills Blackwell Project, the North Star Project and the Solar Gen 2 Project.

On January 26, 2016, OpCo entered into a Purchase, Sale and Contribution Agreement (the “Kern Purchase Agreement”) with SunPower pursuant to which OpCo agreed to purchase an interest in the Kern Project, as further described below in Note 2. Effective January 26, 2016, a subsidiary of OpCo acquired from SunPower all of the class B limited liability company interests of SunPower

 

14


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

Commercial II Class B, LLC (the “Kern Class B Partnership”). Kern High School District Solar (2), LLC (the “Kern Project Entity”) is an indirect subsidiary of the Kern Class B Partnership, and OpCo holds a controlling interest in the Kern Class B Partnership effective January 26, 2016. The Partnership has concluded that OpCo is the primary beneficiary of the Kern Class B Partnership as it has the power to direct the activities that most significantly impact its economic performance and absorbs the majority of losses and has the right to receive benefits over the life of the project. Therefore, OpCo consolidates this less-than-wholly-owned entity.  Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details

On March 31, 2016, OpCo entered into a Purchase and Sale Agreement (the “Kingbird Purchase Agreement”) with First Solar and First Solar Asset Management, LLC, a wholly-owned subsidiary of First Solar (“Kingbird Seller”), to acquire an interest in the Kingbird Project, as further described below in Note 2. Effective March 31, 2016, a subsidiary of OpCo acquired FSAM Kingbird Solar Holdings, LLC from First Solar. FSAM Kingbird Solar Holdings, LLC holds the class B limited liability company interests of Kingbird Solar, LLC. Kingbird Solar A, LLC and Kingbird Solar B, LLC (the “Kingbird Project Entities”) are direct subsidiaries of Kingbird Solar, LLC, and OpCo holds a controlling interest in the Kingbird Solar, LLC effective March 31, 2016. The Partnership has concluded that OpCo is the primary beneficiary of Kingbird Solar, LLC as it has the power to direct the activities that most significantly impact its economic performance and absorbs the majority of losses and has the right to receive benefits over the life of the project. Therefore, OpCo consolidates this less-than-wholly-owned entity.  Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details.

On March 31, 2016, OpCo entered into a Contribution Agreement (the “Hooper Purchase Agreement”) with SunPower and SunPower AssetCo, LLC, a wholly-owned subsidiary of SunPower, to acquire an interest in the Hooper Project, as further described below in Note 2. Effective April 1, 2016, a subsidiary of OpCo acquired from SunPower all of the class B limited liability company interests of SSCO III Class B Holdings, LLC (the “Hooper Class B Partnership”). Solar Star Colorado III, LLC (the “Hooper Project Entity”) is an indirect subsidiary of the Hooper Class B Partnership, and OpCo holds a controlling interest in the Hooper Class B Partnership effective April 1, 2016. The Partnership has concluded that OpCo is the primary beneficiary of the Hooper Class B Partnership as it has the power to direct the activities that most significantly impact its economic performance and absorbs the majority of losses and has the right to receive benefits over the life of the project. Therefore, OpCo consolidates this less-than-wholly-owned entity.  Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details.

The Partnership’s unaudited condensed consolidated financial statements are prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”), and include the accounts of the Partnership, and all of its subsidiaries, as appropriate under consolidation accounting guidelines. The year-end condensed consolidated balance sheet data was derived from the audited financial statements, but does not include all disclosures required by U.S. GAAP. Investments in unconsolidated affiliates in which the Partnership has less than a controlling interest are accounted for using the equity method of accounting. All significant inter-entity accounts and transactions have been eliminated in consolidation. In the opinion of management, the accompanying unaudited condensed consolidated financial statements include all adjustments (consisting of normal, recurring items) necessary to state fairly its financial position, results of operations and cash flows for the periods presented. The unaudited condensed consolidated financial statements should be read in conjunction with the accounting policies previously disclosed in “Note 1. Description of Business and Summary of Significant Accounting Policies” and “Note 2. Summary of Significant Accounting Policies” of the 2015 10-K. Interim results are not necessarily indicative of results for a full year.

Fiscal Years

On June 24, 2015, in connection with the closing of the IPO, the Partnership amended the Partnership Agreement to include a change in the fiscal year to November 30. The second quarter of the Partnership’s fiscal 2016 includes the period from March 1, 2016 to May 31, 2016, consistent with the Partnership’s November 30 fiscal year end. The Predecessor had a 52-to-53 week fiscal year that ended on the Sunday closest to December 31. The corresponding second quarter of fiscal 2015 includes the Predecessor’s period from March 30, 2015 to June 28, 2015 and is comprised of 13 weeks.

The accompanying unaudited condensed consolidated financial statements cover the period from December 1, 2015 to May 31, 2016, representing the entire six-month period of the Partnership’s first and second quarters of fiscal year 2016. The prior year’s comparable six-month period covers the period from December 29, 2014 through June 28, 2015 and is reported on the basis of the previous fiscal year end of the Predecessor. As a result of the change in the Partnership’s fiscal year end, the quarterly periods of its newly adopted fiscal year do not coincide with the historical quarterly periods previously reported by the Predecessor. Financial information for the three and six months ended May 31, 2015 has not been included in this Quarterly Report on Form 10-Q for the following reasons: (i) the three and six months ended June 28, 2015 provide as meaningful a comparison to the three and six months ended May 31, 2016 as would the three and six months ended May 31, 2015; (ii) the Partnership believes that there are no significant

 

15


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

factors, seasonal or otherwise, that would impact the comparability of information if the results for the three and six months ended May 31, 2015 were presented in lieu of results for the three and six months ended June 28, 2015; and (iii) it was not practicable or cost justified to prepare this information.

Management Estimates

The preparation of the unaudited condensed consolidated financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the amounts reported in the unaudited condensed consolidated financial statements and accompanying notes. Significant estimates in these unaudited condensed consolidated financial statements include the assumptions and methodology underlying the allocations of expenses incurred on the Predecessor’s behalf that were recorded in the Predecessor’s condensed carve-out financial statements, as well as: allowances for doubtful accounts related to accounts receivable and financing receivables; estimates for future cash flows and economic useful lives of property and equipment; the fair value and residual value of leased solar energy systems; fair value of financial instruments; fair value of acquired assets and liabilities; valuation of certain accrued liabilities such as accrued warranty and asset retirement obligation (“ARO”); and income taxes including the related valuation allowance. Actual results could materially differ from those estimates.

Recent Accounting Pronouncements

In March 2016, the Financial Accounting Standards Board (the “FASB”) issued an update to the equity method investments guidance, which eliminates the requirement that an entity retroactively adopt the equity method of accounting if an investment qualifies for use of the equity method as a result of an increase in the level of ownership or degree of influence. The update requires that the equity method investor add the cost of acquiring the additional interest in the investee to the current basis of the investor’s previously held interest and adopt the equity method of accounting as of the date the investment becomes qualified for equity method accounting. This new guidance will be effective for the Partnership beginning on December 1, 2017 using a modified retrospective approach. The modified retrospective approach includes a number of optional practical expedients that entities may elect to apply. The Partnership is evaluating the impact of this standard on its unaudited condensed consolidated financial statements and disclosures.

In February 2016, the FASB issued an update to the lease accounting guidance, which requires entities to begin recording assets and liabilities arising from substantially all leases on the balance sheet. The new guidance will also require significant additional disclosures about the amount, timing and uncertainty of cash flows from leases. This new guidance will be effective for the Partnership beginning on December 1, 2019 using a modified retrospective approach. The modified retrospective approach includes a number of optional practical expedients that entities may elect to apply. The Partnership is evaluating the impact of this standard on its unaudited condensed consolidated financial statements and disclosures.

In November 2015, the FASB issued an update which requires entities that present a classified balance sheet to classify all deferred taxes as noncurrent assets or noncurrent liabilities. The new guidance is effective for the Partnership beginning on December 1, 2017. Early adoption of this standard is permitted. The Partnership is evaluating the potential impact of this standard on its unaudited condensed consolidated financial statements and disclosures.

In May 2014, the FASB issued a new revenue recognition standard based on the principle that revenue is recognized to depict the transfer of goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods and services. In August 2015, the FASB deferred the effective date of this standard for all entities by one year. The new revenue recognition standard becomes effective for the Partnership in the first quarter of fiscal 2019, and is to be applied retrospectively using one of two prescribed methods. The Partnership is evaluating the application method and impact on its unaudited condensed consolidated financial statements and disclosures.

 

 

Note 2. Business Combinations

 

Acquisition accounting is dependent upon certain valuations and other studies that must be completed as of the acquisition date. The judgments made in the context of the purchase price allocation can materially impact the Partnership’s future results of operations.

 

2016 Acquisitions

 

 

16


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

For the acquisitions completed during the six months ended May 31, 2016, the valuation is based on the preliminary assessment of the fair values of the assets acquired, liabilities assumed and noncontrolling interests as of the acquisition date, and is subject to change as the Partnership obtains additional information for its estimates during the respective measurement period.

 

Kern Acquisition:

 

On January 26, 2016, OpCo entered into the Kern Purchase Agreement with SunPower, pursuant to which OpCo agreed to purchase an interest in a solar energy project consisting of systems attached to fixed-tilt carports located at 27 school sites in the Kern High School District located in Kern County, California, and having an aggregate nameplate capacity of 20 MW (the “Kern Project”). OpCo’s acquisition of the Kern Project will be effectuated in three phases, with the closing of the first phase having occurred simultaneously with the execution of the Kern Purchase Agreement.  The following describes the acquisition of each phase:

 

 

(i)

Phase 1(a): On January 26, 2016, 8point3 OpCo Holdings, LLC, a wholly owned subsidiary of OpCo, acquired from SunPower all of the class B limited liability company interests of the Kern Class B Partnership.  Prior to the date of the execution of the Kern Purchase Agreement and in connection with the closing of the tax equity financing for the Kern Project, described below, the Kern Project Entity, an indirect subsidiary of the Kern Class B Partnership, acquired the assets included in Phase 1(a) (the “Kern Phase 1(a) Assets”). The initial phase of the acquisition of the Kern Project is referred to herein as the “Kern Phase 1(a) Acquisition”.

 

(ii)

Phase 1(b): At a future closing date, which is expected to occur in the fiscal quarter ending August 31, 2016, the Kern Project Entity will acquire the Kern Phase 1(b) assets from SunPower.

 

(iii)

Phase 2: At a future closing date, which is expected to occur in the fiscal quarter ending November 30, 2016, the Kern Project Entity will acquire the Kern Phase 2 assets from SunPower.

 

The aggregate purchase price for the acquisition is $35.0 million in cash, of which OpCo paid approximately $4.9 million on January 27, 2016 in connection with the closing of the first phase on January 26, 2016.  OpCo will pay the remaining balance of the approximately $30.1 million purchase price at the closing of the second and third phases based upon the MW of the assets acquired in such phase.

In addition, on January 22, 2016, a subsidiary of the Kern Class B Partnership entered into a tax equity financing facility with a third-party investor, which allocates to OpCo a certain share of cash flows from the Kern Project pursuant to a distribution waterfall. Pursuant to this distribution waterfall, the tax equity investor is entitled to a quarterly amount of project cash flow until a specified “flip” point is achieved.  After the “flip” point, the cash allocations to OpCo increase.  In addition, upon reaching the flip point, OpCo has a right to purchase the tax equity investor’s interests in the project for an amount that is not less than its fair market value. The tax equity investor will make capital contributions to fund purchase price payments of $28.4 million, which will be made when the Kern Project’s phases meet certain construction milestones and will be transferred to affiliates of SunPower for the remaining purchase price payments. For more information about our tax equity structures in general, please read Part I, Item 1. “Business—Tax Equity Financing” of our 2015 10-K.

The Kern Phase 1(a) Acquisition qualifies as a business combination and the Partnership accounts for the transaction under the acquisition method.  The purchase allocation of the identifiable assets acquired, liabilities assumed and noncontrolling interests of the Kern Phase 1(a) Assets is as follows:

 

(in thousands)

 

Fair Value

 

Property and equipment

 

$

9,733

 

Related party payable

 

 

(3,435

)

Asset retirement obligation

 

 

(547

)

Noncontrolling interest

 

 

(864

)

Net assets acquired

 

$

4,887

 

 

Kingbird Acquisition:

 

On March 31, 2016, OpCo entered into the Kingbird Purchase Agreement with First Solar, pursuant to which OpCo agreed to acquire an interest in two 20 MW photovoltaic solar generating projects located in Kern County, California (together, the “Kingbird Project”) for aggregate consideration of $60.0 million in cash (the “Kingbird Acquisition”). Consideration for the Kingbird

 

17


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

Acquisition comprised a $42.9 million payment on the closing date of March 31, 2016 to Kingbird Seller and a $17.1 million contribution to FSAM Kingbird Solar Holdings, LLC, the acquired company, on May 31, 2016 which was subsequently paid to an affiliate of First Solar for the remaining balance due under the Kingbird Project’s EPC contract.  The closing of the Kingbird Acquisition occurred simultaneously with the execution of the Kingbird Purchase Agreement and OpCo funded 100% of the payment for the Kingbird Project with a combination of cash on hand, drawings under OpCo’s revolver and drawings under OpCo’s delayed draw facility.

 

Ownership and cash flows of the Kingbird Project are subject to a tax equity financing facility with a third-party investor, which allocates to OpCo a certain share of cash flows from the Kingbird Project pursuant to a distribution waterfall.  Pursuant to this distribution waterfall, the tax equity investor is entitled to a quarterly amount of project cash flow until a specified “flip” point is achieved.  After the “flip” point, the cash allocations to OpCo increase.  In addition, upon reaching the flip point, OpCo has a right to purchase the tax equity investor’s interests in the project for an amount that is not less than its fair market value. The tax equity investor made capital contributions to fund purchase price payments of approximately $11.7 million on February 26, 2016 and $46.8 million on May 31, 2016, which were made when the Kingbird Project’s phases met certain construction milestones and were transferred to an affiliate of First Solar for the remaining purchase price payments. For more information about our tax equity structures in general, please read Part I, Item 1. “Business—Tax Equity Financing” of our 2015 10-K.

 

The Kingbird Acquisition qualifies as a business combination and the Partnership accounts for the transaction under the acquisition method.  The purchase allocation of the identifiable assets acquired, liabilities assumed and noncontrolling interests of the Kingbird Project is as follows:

 

(in thousands)

 

Fair Value

 

Property and equipment

 

$

117,473

 

Prepaid transmission services

 

 

1,982

 

Interest receivable

 

 

72

 

Related party payable (1)

 

 

(63,971

)

Asset retirement obligation

 

 

(981

)

Noncontrolling interest

 

 

(11,709

)

Net assets acquired

 

$

42,866

 

 

 

(1)

Related party payable represents liabilities for amounts due to an affiliate of First Solar related to the construction of the project and consisted of: (i) a $17.1 million contribution to FSAM Kingbird Solar Holdings, LLC, the acquired company, by OpCo on May 31, 2016, which was subsequently paid by the acquired company and (ii) a $46.8 million payment made from the capital contribution by the tax equity investor on May 31, 2016.

 

Hooper Acquisition:

 

On March 31, 2016, OpCo entered into the Hooper Purchase Agreement with SunPower, pursuant to which OpCo agreed to acquire an interest in the 50 MW photovoltaic solar generating project located in Alamosa County, Colorado (the “Hooper Project”) for aggregate consideration of $53.5 million in cash (the “Hooper Acquisition”). The Hooper Acquisition closed on April 1, 2016 and OpCo funded 100% of the purchase price for the Hooper Project with a combination of cash on hand, drawings under OpCo’s revolver and drawings under OpCo’s delayed draw facility.

 

Ownership and cash flows of the Hooper Project are subject to a tax equity financing facility with a third-party investor, which allocates to OpCo a certain share of cash flows from the Hooper Project pursuant to a distribution waterfall. Pursuant to this distribution waterfall, the tax equity investor is entitled to a quarterly amount of project cash flow until a specified “flip” point is achieved.  After the “flip” point, the cash allocations to OpCo increase.  In addition, upon reaching the flip point, OpCo has a right to purchase the tax equity investor’s interests in the project for an amount that is not less than its fair market value. For more information about our tax equity structures in general, please read Part I, Item 1. “Business—Tax Equity Financing” of our 2015 10-K.

 

The Hooper Acquisition qualifies as a business combination and the Partnership accounts for the transaction under the acquisition method.  The purchase allocation of the identifiable assets acquired, liabilities assumed and noncontrolling interests of the Hooper Project is as follows:

 

 

18


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

(in thousands)

 

Fair Value

 

Property and equipment

 

$

76,419

 

Prepaid expense

 

 

240

 

Accounts receivable (1)

 

 

568

 

Accrued liabilities (2)

 

 

(463

)

Noncontrolling interest

 

 

(23,679

)

Net assets acquired (3)

 

$

53,085

 

 

 

(1)

Accounts receivable represent the fair value of the trade accounts receivable acquired, all of which are expected to be collected.

 

(2)

Accrued liabilities includes $0.3 million of cash distributions payable that was paid to the tax equity investor on April 30, 2016.

 

(3)

The net purchase price for the acquisition represents $53.5 million of cash paid by OpCo, offset by $0.4 million cash acquired in the Hooper Project Entity.

 

Valuation methodology:

 

The Partnership utilized the discounted cash flow method under the income approach to value property and equipment for the Kern Phase 1(a) Assets, the Kingbird Project and the Hooper Project, and to value noncontrolling interests for the Hooper Project. Key assumptions used in the discounted cash flow method included forecasted pre-tax cash flows, forecasted taxable income and discount rates.  All estimates, key assumptions and forecasts were reviewed by the Partnership and the fair value analyses and related valuations represent the conclusions of management.

 

Supplementary Data:

 

The results of operations for the Kern Phase 1(a) Assets, the Kingbird Project and the Hooper Project have been included in the Partnership’s unaudited condensed consolidated statements of operations since their respective dates of acquisition. In both the three and six months ended May 31, 2016, the Kern Phase 1(a) Assets, the Kingbird Project and the Hooper Project contributed approximately $2.2 million to the Partnership’s operating revenue and decreased net loss by approximately $1.0 million.

 

2015 Acquisitions

 

For the acquisitions completed in fiscal 2015, the Partnership obtained valuations from a third-party valuation specialist. The valuations calculated from these estimates were based on information available at the acquisition date. Therefore, the Partnership’s purchase price allocations are final and not subject to revision.

 

On June 24, 2015, the Partnership acquired a 100% interest in the Maryland Solar Project Entity, and a 49% indirect interest in each of the Solar Gen 2 Project, the North Star Project and the Lost Hills Blackwell Project, each of which is described in more detail below.

 

Maryland Solar

 

The Maryland Solar Project, located in Maryland, is a fully operational 20 MW grid-connected system contracted to serve a 20-year PPA with FirstEnergy Solutions, a subsidiary of FirstEnergy Corp.

 

Solar Gen 2

 

The Solar Gen 2 Project, located in California, is a fully operational 150 MW grid-connected system spanning three separate 50 MW sites. Electricity generated by the three separate systems is contracted to serve a 25-year PPA with San Diego Gas & Electric Company (“SDG&E”), a subsidiary of Sempra Energy.

 

 

19


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

North Star

The North Star Project, located in California, is a fully operational 60 MW grid-connected system contracted to serve a 20-year PPA with PG&E, a subsidiary of PG&E Corporation.

 

Lost Hills Blackwell

The Lost Hills Blackwell Project, located in California, is a fully operational 32 MW grid-connected system contracted to serve a 25-year PPA with PG&E, a subsidiary of PG&E Corporation, starting in 2019. The Lost Hills Blackwell Project is also contracted to serve a short-term PPA with the City of Roseville, California prior to the system’s PPA with PG&E.   

 

The purchase allocation for the acquired assets and liabilities of the above IPO First Solar Project Entities is as follows:

 

(in thousands)

 

Fair Value

 

Property and equipment

 

$

56,497

 

Equity method investment - Solar Gen 2

 

 

216,483

 

Equity method investment - North Star

 

 

103,849

 

Equity method investment - Lost Hills Blackwell

 

 

34,121

 

Asset retirement obligation

 

 

(2,130

)

Total purchase price

 

$

408,820

 

 

The following unaudited pro forma supplementary data gives effect to the 2015 Acquisitions as if the transactions had occurred on December 30, 2013. The unaudited pro forma supplementary data is provided for informational purposes only and should not be construed as indicative of the Partnership’s results of operations had the 2015 Acquisitions been consummated on the date assumed or of the Partnership’s results of operations for any future date.

 

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

June 28,

 

 

June 28,

 

(in thousands)

 

2015

 

 

2015

 

Operating revenues

 

$

4,092

 

 

$

7,125

 

Net loss

 

 

(6,630

)

 

 

(14,781

)

Net income attributable to 8point3 Energy Partners LP Class A shares

 

 

989

 

 

 

1,192

 

Net income per Class A share - Basic and Diluted

 

$

0.05

 

 

$

0.06

 

 

 

Note 3. Investment in Unconsolidated Affiliates

The following table summarizes the activity of the Partnership’s investments in its unconsolidated affiliates during the three and six months ended May 31, 2016:

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

May 31,

 

Projects

 

2016

 

 

2016

 

(in thousands)

 

 

 

 

 

 

 

 

Balance at the beginning of the period

 

$

346,197

 

 

$

352,070

 

Equity in earnings in unconsolidated affiliates (1)

 

 

5,024

 

 

 

5,429

 

Distributions from unconsolidated affiliates

 

 

(2,633

)

 

 

(8,911

)

Balance at the end of the period

 

$

348,588

 

 

$

348,588

 

 

20


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

 

 

(1)

The net income (loss) used to determine the Partnership’s equity in earnings of unconsolidated affiliates reflects adjustments pursuant to the equity method of accounting, including the amortization of basis differences resulting from the Partnership’s proportionate share of certain equity method investees’ net assets exceeding their carrying values.  

 

The following table presents summarized financial information for SG2 Holdings, LLC (“SG2 Holdings”) and NS Solar Holdings, LLC (“North Star Holdings”), significant investees, as derived from the unaudited condensed consolidated financial statements of SG2 Holdings and North Star Holdings for each of the three and six months ended May 31, 2016 and June 30, 2015:

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

June 30,

 

 

May 31,

 

 

June 30,

 

(in thousands)

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Summary statements of operations information:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenue

 

$

16,101

 

 

$

13,317

 

 

$

24,751

 

 

$

21,061

 

Operating expenses

 

 

9,844

 

 

 

8,509

 

 

 

20,769

 

 

 

16,359

 

Net income

 

 

6,382

 

 

 

4,932

 

 

 

4,212

 

 

 

4,832

 

 

Note 4. Balance Sheet Components

Financing Receivables

The Partnership’s net investment in sales-type leases presented in “Accounts receivable and short-term financing receivables, net” and “Long-term financing receivables, net” on the unaudited condensed consolidated balance sheets is as follows:

 

 

 

As of

 

 

 

May 31,

 

 

November 30,

 

(in thousands)

 

2016

 

 

2015

 

Minimum lease payment receivable, net (1)

 

$

103,324

 

 

$

106,432

 

Unguaranteed residual value

 

 

12,950

 

 

 

12,969

 

Less: unearned income

 

 

(32,095

)

 

 

(33,655

)

Net financing receivables

 

$

84,179

 

 

$

85,746

 

Short-term financing receivables, net (2)

 

$

2,455

 

 

$

2,370

 

Long-term financing receivables, net

 

$

81,724

 

 

$

83,376

 

 

(1)

Allowance for losses on financing receivables was $0.5 million and $0.3 million as of May 31, 2016 and November 30, 2015, respectively.

(2)

Accounts receivable and short-term financing receivables, net on the unaudited condensed consolidated balance sheets includes other trade accounts receivable of $5.7 million and $1.9 million as of May 31, 2016 and November 30, 2015, respectively.

 

21


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

 

Current and Non-current Assets

 

 

As of

 

 

 

May 31,

 

 

November 30,

 

(in thousands)

 

2016

 

 

2015

 

Prepaid expense and other current assets

 

 

 

 

 

 

 

 

Reimbursable network upgrade costs (1)

 

$

10,134

 

 

$

6,535

 

Other current assets (2)

 

 

1,351

 

 

 

1,498

 

Total

 

$

11,485

 

 

$

8,033

 

Property and equipment, net

 

 

 

 

 

 

 

 

Solar energy systems utility

 

$

553,691

 

 

$

361,241

 

Leased solar energy systems

 

 

137,657

 

 

 

137,703

 

Land

 

 

1,020

 

 

 

 

Construction-in-progress (3)

 

 

9,463

 

 

 

 

 

 

$

701,831

 

 

$

498,944

 

Less: accumulated depreciation

 

 

(21,764

)

 

 

(12,002

)

Total

 

$

680,067

 

 

$

486,942

 

 

 

 

 

 

 

 

 

 

Other long-term assets

 

 

 

 

 

 

 

 

Reimbursable network upgrade costs (1)

 

$

25,155

 

 

$

26,142

 

 

 

(1)

For the Quinto Project and Kingbird Project, the construction costs related to the network upgrade of a transmission grid belonging to a utility company are reimbursable by that utility company over five years from the date the project reached commercial operation.

 

(2)

Other current assets included $0.6 million due from SunPower related to system output performance warranties and system repairs in connection with $0.1 million of system output performance warranty accrual and $0.5 million of system repairs accrual recorded in the “Accounts payable and other current liabilities” line item on the unaudited condensed consolidated balance sheets as of May 31, 2016. Similarly, other current assets included $0.9 million due from SunPower related to system output performance warranties and system repairs in connection with $0.2 million of system output performance warranty accrual and $0.7 million of system repairs accrual recorded in the “Accounts payable and other current liabilities” line item on the unaudited condensed consolidated balance sheets as of November 30, 2015.

 

(3)

Construction-in-progress is comprised of project assets related to the Kern Phase 1(a) Assets.

    

Current and Non-current Liabilities

 

 

 

As of

 

 

 

May 31,

 

 

November 30,

 

(in thousands)

 

2016

 

 

2015

 

Accounts payable and other current liabilities

 

 

 

 

 

 

 

 

Trade and accrued accounts payable

 

$

2,729

 

 

$

713

 

Related party payable (1)

 

 

3,636

 

 

 

171

 

System output performance warranty

 

 

140

 

 

 

237

 

Residential lease system repairs accrual

 

 

494

 

 

 

728

 

Derivative financial instruments

 

 

360

 

 

 

611

 

Other short-term liabilities

 

 

850

 

 

 

152

 

 

 

$

8,209

 

 

$

2,612

 

Other long-term liabilities

 

 

 

 

 

 

 

 

Asset retirement obligations

 

 

11,542

 

 

$

9,992

 

Deferred tax liabilities

 

 

22,709

 

 

 

12,491

 

 

 

$

34,251

 

 

$

22,483

 

 

22


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

 

(1)

Related party payable on the unaudited condensed consolidated balance sheets consists of (i) $3.4 million related to the purchase price payable by tax equity investors to SunPower for the Kern Phase 1(a) Acquisition as of May 31, 2016; and (ii) $0.2 million as of both May 31, 2016 and November 30, 2015 for accounts payable to related parties associated with O&M, AMA and MSA fees owed to the Sponsors.

 

 

Note 5. Commitments and Contingencies

Land Use Commitments

The Partnership is a party to various agreements that provide for payments to landowners for the right to use the land upon which projects under PPAs are located.

The total minimum lease and easement commitments at May 31, 2016 under these land use agreements are as follows:

 

(in thousands)

 

2016 (remaining

six months)

 

 

2017

 

 

2018

 

 

2019

 

 

2020

 

 

Thereafter

 

 

Total

 

Land use payments

 

$

611

 

 

$

1,293

 

 

$

1,329

 

 

$

1,686

 

 

$

1,742

 

 

$

58,299

 

 

$

64,960

 

 

Solar Energy System Performance Warranty

Lease agreements require the Partnership to undertake a system output performance warranty. The Partnership has recorded in “Accounts payable and other current liabilities” amounts related to these system output performance warranties totaling $0.1 million and $0.2 million as of May 31, 2016 and November 30, 2015, respectively. The Partnership has also recorded in “Other current assets” amounts of $0.1 million and $0.2 million as of May 31, 2016 and November 30, 2015, respectively, relating to anticipated performance warranty reimbursements from the O&M provider.

The following table summarizes accrued solar energy systems performance warranty activity for the each of three and six months ended May 31, 2016 and June 28, 2015:

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Balance at the beginning of the period

 

$

226

 

 

$

487

 

 

$

237

 

 

$

525

 

Settlements during the period

 

 

(80

)

 

 

(58

)

 

 

(156

)

 

 

(120

)

Adjustments during the period

 

 

(6

)

 

 

(9

)

 

 

59

 

 

 

15

 

Balance at the end of the period

 

$

140

 

 

$

420

 

 

$

140

 

 

$

420

 

Asset Retirement Obligations (“ARO”)

The Partnership’s AROs are based on estimated third-party costs associated with the decommissioning of the applicable project assets. These costs may increase or decrease in the future as a result of changes in regulations, engineering designs and technology, permit modifications, inflation or other factors. Decommissioning activities generally are made over a period of time commencing at the end of the system’s life.

The following table summarizes ARO activity for each of the three and six months ended May 31, 2016 and June 28, 2015:

 

 

23


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Balance at the beginning of the period

 

$

10,658

 

 

$

903

 

 

$

9,992

 

 

$

 

ARO assumed in acquisition

 

 

981

 

 

 

2,130

 

 

 

1,528

 

 

 

2,130

 

Accretion expense

 

 

127

 

 

 

 

 

 

246

 

 

 

 

Liabilities incurred during the period

 

 

 

 

 

3,667

 

 

 

 

 

 

4,570

 

Adjustments to ARO during the period

 

 

(224

)

 

 

 

 

 

(224

)

 

 

 

Balance at the end of the period

 

$

11,542

 

 

$

6,700

 

 

$

11,542

 

 

$

6,700

 

 

    

Legal Proceedings

In the normal course of business, the Partnership may be notified of possible claims or assessments. The Partnership will record a provision for these claims when it is both probable that a liability has been incurred and the amount of the loss, or a range of the potential loss, can be reasonably estimated. These provisions are reviewed regularly and adjusted to reflect the impacts of negotiations, settlements, rulings, advice of legal counsel, and other information or events pertaining to a particular case.

Although the Partnership may, from time to time, be involved in litigation and claims arising from its operations in the ordinary course of business, the Partnership is not a party to any litigation or governmental or other proceeding that the Partnership believes will have a material adverse impact on its financial position, results of operations, or liquidity.

Environmental Contingencies

The Partnership reviews its obligations as they relate to compliance with environmental laws, including site restoration and remediation. During each of the three and six months ended May 31, 2016 and June 28, 2015, there were no known environmental contingencies that required the Partnership to recognize a liability.

 

 

Note 6. Lease Agreements and Power Purchase Agreements

Lease Agreements

As of May 31, 2016, the Partnership’s unaudited condensed consolidated financial statements include approximately 5,900 residential lease agreements which have original terms of 20 years and are classified as either operating or sales-type leases. In addition, the lease agreement for the Maryland Solar Project has a lease term that will expire on December 31, 2019, and the lessee, who is an affiliate of First Solar, is obligated to pay a fixed amount of rent that is set based on the expected operations of the plant.

The following table presents the Partnership’s minimum future rental receipts on operating leases (including the lease agreement for the Maryland Solar Project and the residential lease portfolio) placed in service as of May 31, 2016:

 

(in thousands)

 

2016 (remaining

six months)

 

 

2017

 

 

2018

 

 

2019

 

 

2020

 

 

Thereafter

 

 

Total

 

Minimum future rentals on residential

   operating leases placed in service (1)

 

$

1,846

 

 

$

3,707

 

 

$

3,727

 

 

$

3,748

 

 

$

3,769

 

 

$

46,404

 

 

$

63,201

 

Maryland Solar lease

 

 

2,678

 

 

 

5,231

 

 

 

5,173

 

 

 

4,912

 

 

 

 

 

 

 

 

 

17,994

 

Total operating leases

 

$

4,524

 

 

$

8,938

 

 

$

8,900

 

 

$

8,660

 

 

$

3,769

 

 

$

46,404

 

 

$

81,195

 

 

(1)

Minimum future rentals on operating leases placed in service do not include contingent rentals that may be received from customers under agreements that include performance-based incentives and executory costs.

As of May 31, 2016, future maturities of net financing receivables for sales-type leases are as follows:

 

(in thousands)

 

2016 (remaining

six months)

 

 

2017

 

 

2018

 

 

2019

 

 

2020

 

 

Thereafter

 

 

Total

 

Scheduled maturities of minimum lease

   payments receivable (1)

 

$

2,776

 

 

$

5,616

 

 

$

5,704

 

 

$

5,791

 

 

$

5,883

 

 

$

77,554

 

 

$

103,324

 

 

24


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

 

(1)

Minimum future rentals on sales-type leases placed in service do not include contingent rentals that may be received from customers under agreements that include performance-based incentives and executory costs.

Power Purchase Agreements

Under the terms of various PPAs, the Partnership’s contracted counterparties may be obligated to take all or part of the output from the system at stipulated prices over defined periods. All PPAs are accounted for as operating leases, have no minimum lease payments and all of the rental income under these leases is recorded as revenue when the electricity is delivered.  

 

 

Note 7. Debt and Financing Obligations

 

Term Loan and Revolving Credit Facility

 

On June 5, 2015, OpCo entered into a $525.0 million credit facility, consisting of a $300.0 million term loan facility, a $25.0 million delayed draw term loan facility and a $200.0 million revolving credit facility. OpCo borrowed $300.0 million under the term loan facility on June 5, 2015, which indebtedness will mature on the fifth anniversary of its issuance, at which point all amounts outstanding under the $525.0 million credit facility will become due and payable. There will be no principal amortization over the term of the credit facility. The discount and incremental debt issuance costs associated with these borrowings were $3.1 million, which included $1.7 million of debt issuance costs paid with a portion of the proceeds and $1.4 million related to a reclassification of capitalized issuance costs on the Predecessor’s historical financial statements, and were reported as a direct deduction from the face amount of the note. The Partnership used the net proceeds of the term loan facility to pay distributions of $129.4 million to First Solar and $168.9 million to SunPower.

 

On March 30, 2016, in connection with the Kingbird Acquisition and the Hooper Acquisition, OpCo drew down $40.0 million from its revolving credit facility and $25.0 million from its delayed draw term loan facility. As of May 31, 2016, the full amount of the $300.0 million borrowed under the term loan facility, the full amount of the $25.0 million borrowed under the delayed draw term loan facility, $40.0 million borrowed under the revolving credit facility, and approximately $58.6 million of letters of credit under the revolving credit facility were outstanding. As of November 30, 2015, the full amount of the $300.0 million borrowed under the term loan facility and approximately $48.8 million of letters of credit under the revolving credit facility were outstanding. The remaining portion of the revolving credit facility was undrawn.  

 

OpCo’s credit facility is collateralized by a pledge of the equity of OpCo and certain of its subsidiaries. The Partnership and each of OpCo’s subsidiaries, other than certain non-guarantor subsidiaries, have guaranteed the obligations of OpCo under the credit facility.  

 

Loans outstanding under the credit facility bear interest at either (i) a base rate, which is the highest of (x) the federal funds rate plus 0.50%, (y) the administrative agent’s prime rate and (z) one-month LIBOR, in each case, plus an applicable margin; or (ii) one-, two-, three- or six-month LIBOR plus an applicable margin. The unused portion of the revolving credit facility and delayed draw term loan facility is subject to a commitment fee of 0.30% per annum. OpCo may prepay the borrowings under the term loan facility and the delayed draw term loan facility at any time. Subject to certain conditions, the credit facility includes conditional borrowing capacity for incremental commitments to increase the term loan facility and the revolving credit facility by $250 million, with any increase in the revolving credit facility not to exceed $100.0 million. The term loan bears an interest rate of approximately 2.67% and 2.41% per annum as of May 31, 2016 and November 30, 2015, respectively. OpCo has entered into interest rate swap agreements to hedge the interest rate on the borrowings under the term loan facility. For more details, please read “—Note 8. Fair Value.”

 

The credit facility contains covenants, including among others, requiring the Partnership to maintain the following financial ratios beginning in the fiscal quarter ending August 31, 2015: (i) a debt to cash flow ratio of not more than (a) 7.00 to 1.00 for the fiscal quarters ending August 31, 2015 through May 31, 2016, (b) 5.50 to 1.00 for the fiscal quarters ending August 31, 2016 through May 31, 2017, and (c) 5.00 to 1.00 for each fiscal quarter ending thereafter; and (ii) a debt service coverage ratio of not less than 1.75 to 1.00. In addition, an event of default occurs under the credit facility upon a change of control. The credit facility defines a change of control as occurring when, among other things, (i) the Sponsors (or either of them) cease to direct the management, directly or indirectly, of the Partnership or OpCo, or (ii) the Sponsors collectively cease to own 35% of the economic interest in OpCo. In addition, the credit facility contains customary non-financial covenants and certain restrictions that will limit the Partnership’s, OpCo’s and certain of the Partnership’s and its domestic subsidiaries’ ability to, among other things, incur or guarantee additional debt

 

25


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

and to make distributions on or redeem or repurchase OpCo common units. As of May 31, 2016, the Partnership was in compliance with the debt covenants.

On April 6, 2016, the parties thereto amended OpCo’s credit facility (i) to provide for the lenders’ consent to the Amended and Restated Omnibus Agreement, (ii) to expand OpCo’s ability to further amend the Amended and Restated Omnibus Agreement without lender consent in the future, subject to certain conditions, (iii) to permit certain customary restrictions on transfers of the equity interests of certain Project Entities, which are jointly owned, indirectly, by OpCo and SunPower, (iv) to supplement the Pledge and Security Agreement between the parties in light of the foregoing amendment, and (v) to make certain clarifying modifications to definitions and cross references.

 

 

The following table summarizes the Partnership’s long-term debt:

 

 

 

May 31, 2016

 

 

November 30, 2015

 

(in thousands)

 

Amount

 

 

Interest Rate

 

 

Amount

 

 

Interest Rate

 

Term loan due June 2020

 

$

300,000

 

 

 

2.67

%

 

$

300,000

 

 

 

2.41

%

Delayed draw term loan facility due June 2020

 

 

25,000

 

 

 

2.67

%

 

 

 

 

N/A

 

Revolving credit facility due June 2020

 

 

40,000

 

 

 

2.67

%

 

 

 

 

N/A

 

Less: debt issuance costs

 

 

(2,497

)

 

N/A

 

 

 

(2,794

)

 

N/A

 

Total

 

$

362,503

 

 

 

 

 

 

$

297,206

 

 

 

 

 

 

Quinto Solar Project Financing

 

In order to facilitate the construction of certain projects, the Predecessor obtained non-recourse project loans from third-party financial institutions. On October 17, 2014, the Predecessor, through its wholly-owned subsidiary, the Quinto Project Entity, entered into an approximately $377.0 million credit facility with Santander Bank, N.A., Mizuho Bank, Ltd. and Credit Agricole Corporate & Investment Bank (the “Quinto Credit Facility”) in connection with the construction of the Quinto Project.

 

On June 24, 2015, in connection with the closing of the IPO and the concurrent transfer of the Quinto Project to OpCo, the Quinto Project Entity repaid the full amount outstanding under the Quinto Credit Facility and terminated the agreement early. Immediately before termination, there were outstanding borrowings of $224.3 million under the Quinto Credit Facility. Termination of the Quinto Credit Facility became effective upon full repayment by the Quinto Project Entity on June 24, 2015. The Quinto Project Entity paid a $0.6 million fee for early repayment of the Quinto Credit Facility.

 

Residential Lease Financing

 

The Predecessor entered into two financing arrangements under which leased solar energy systems were financed by two third-party investors. Under the terms of these financing arrangements, the investors provided upfront payments to the Predecessor, which the Predecessor recognized as a financing obligation that was reduced over the specified term of the arrangement as customer receivables and federal cash grants were received by the third-party investors. Non-cash interest expense was recognized on the Partnership’s unaudited condensed consolidated statement of operations using the effective interest rate method calculated at a rate of approximately 14%-15%.

 

On January 30, 2015, the Predecessor entered into an agreement with the third-party investor for one of the residential lease financing arrangements that terminated such financing arrangement. In conjunction with the termination of the arrangement, the Predecessor paid $10.8 million to terminate the $10.1 million outstanding financing obligation.

 

On January 23, 2015, the Predecessor entered into an agreement with the third-party investor for the other residential lease financing arrangement that allowed the Predecessor to repay the outstanding financing obligation and terminate the associated agreements on or before September 30, 2015. This repayment was exercised on May 4, 2015. The Predecessor paid $29.0 million to terminate the $21.1 million outstanding financing obligation and $1.9 million accrued financing fee.

 

August 2011 Letter of Credit Facility with Deutsche Bank

 

26


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

In August 2011, the Predecessor’s parent, SunPower, entered into a letter of credit facility agreement with Deutsche Bank, as administrative agent, and certain financial institutions. Payment of obligations under the letter of credit facility is guaranteed by the majority shareholder of SunPower, Total S.A. As of May 31, 2016 and November 30, 2015 letters of credit issued and outstanding under the August 2011 letter of credit facility with Deutsche Bank which is available to SunPower for the Quinto Project and the RPU Project totaled $14.0 million and $30.7 million, respectively. The associated fees incurred for the letters of credit to Deutsche Bank were $0.1 million and $0.2 million during the three and six months ended May 31, 2016, respectively, and $0.1 million during each of the three and six months ended June 28, 2015, and were recognized as interest expense in the unaudited condensed consolidated statements of operations. Pursuant to the Original Omnibus Agreement, SunPower as the Sponsor who contributed the Quinto Project cancelled one of its letter of credit facilities associated with the Quinto Project upon its achieving COD in November 2015. However, SunPower will continue to maintain the remaining letters of credit under the credit facility in connection with certain reimbursable network upgrade costs related to the Quinto Project and will bear the associated fees until no later than November 2016. Since the RPU Project achieved COD in September 2015, SunPower as the Sponsor who contributed the RPU Project is in the process of terminating the related letters of credit, and the Partnership has issued the required letters of credit under its revolving credit facility.

 

 

Note 8. Fair Value

Fair value is estimated by applying the following hierarchy, which prioritizes the inputs used to measure fair value into three levels and bases the categorization within the hierarchy upon the lowest level of input that is available and significant to the fair value measurement (observable inputs are the preferred basis of valuation):

 

·

Level 1—Quoted prices in active markets for identical assets or liabilities.

 

·

Level 2—Measurements are inputs that are observable for assets or liabilities, either directly or indirectly, other than quoted prices included within Level 1.

 

·

Level 3—Prices or valuations that require management inputs that are both significant to the fair value measurement and unobservable.

The first two levels in the hierarchy are considered observable inputs and the last is considered unobservable.  

Assets and Liabilities Measured at Fair Value on a Recurring Basis 

The following tables present the Partnership’s assets and liabilities measured at estimated fair value on a recurring basis, categorized in accordance with the fair value hierarchy:

 

 

 

May 31, 2016

 

 

November 30, 2015

 

 

 

FAIR VALUE MEASUREMENTS

 

 

FAIR VALUE MEASUREMENTS

 

(in thousands)

 

Level 1

 

 

Level 2

 

 

Total

 

 

Level 1

 

 

Level 2

 

 

Total

 

Liabilities

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Derivative financial instruments

 

$

 

 

$

360

 

 

$

360

 

 

$

 

 

$

611

 

 

$

611

 

Total liabilities

 

$

 

 

$

360

 

 

$

360

 

 

$

 

 

$

611

 

 

$

611

 

Derivative financial instruments: On July 17, 2015, OpCo entered into interest swap agreements intended to hedge the interest rate risk on the outstanding and forecasted future borrowings under the term loan with an aggregate notional value of $240.0 million. Under the interest rate swap agreements, OpCo will pay a fixed swap rate of interest of 1.55% and the counterparties to the agreements will pay a floating interest rate based on three-month LIBOR at quarterly intervals through the maturity date of August 31, 2018. OpCo also has the right to cancel the interest rate swap agreements on August 31, 2016 and any quarterly fixed payment date thereafter with a minimum of five business days’ notification. As of both May 31, 2016 and November 30, 2015, these interest rate swap agreements had not been designated as cash flow hedges. These interest rate swap agreements are reflected at fair value and have been presented in other current liabilities on the unaudited condensed consolidated balance sheets since OpCo has the right to cancel the swap agreements within one year of the balance sheet date. During each of the three and six months ended May 31, 2016, the Partnership recorded a change in fair value of $0.3 million within other income in the unaudited condensed consolidated statement of operations.  The primary inputs into the valuation of interest rate swaps are interest yield curves, interest rate volatility, and credit spreads. The Partnership's interest rate swaps are classified within Level 2 of the fair value hierarchy, since all significant inputs are corroborated by market observable data. There were no transfers in or out of Level 1, Level 2 and Level 3 during the period.

 

27


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

 

The Predecessor entered into interest rate swap agreements, designated as cash flow hedges, in the fourth quarter of the year ended December 28, 2014 on the outstanding and forecasted future borrowings under the Quinto Credit Facility to reduce the impact of changes in interest rates. These swap agreements allowed the Predecessor to effectively convert floating-rate payments into fixed-rate payments periodically over the life of the agreements. These derivatives had a maturity of more than 12 months. The Predecessor assessed the effectiveness of these cash flow hedges at inception and on a quarterly basis. If it was determined that a derivative instrument was not highly effective or the transaction was no longer deemed probable of occurring, the Predecessor discontinued hedge accounting and recognized the ineffective portion in current period earnings. In March 2015, the Predecessor discontinued hedge accounting prospectively for its interest rate swap agreements under the Quinto Credit Facility, as it was no longer deemed probable that the hedge transactions will occur. However, because it remained possible that the forecasted hedge transactions would occur, previously recognized loss of $3.0 million on the interest rate swaps remained in accumulated other comprehensive loss as of March 29, 2015, and such loss was reclassified into earnings during the quarter ended June 28, 2015, the same period that the forecasted hedged transactions affect earnings or was otherwise deemed to be improbable of occurrence.

During the three and six months ended June 28, 2015, $2.2 million and $5.4 million, respectively, related to the ineffective portion was recognized in earnings within other expense in the unaudited condensed consolidated statement of operations.

Liabilities Measured at Fair Value on a Nonrecurring Basis

Long-term debt and financing obligations: The estimated fair value of the Partnership’s long-term debt was classified within Level 2 of the fair value hierarchy as of May 31, 2016 and November 30, 2015, and approximated its carrying value of $362.5 million and $297.2 million, respectively, as the term loan facility is a variable rate debt with the interest rate indexed to the market and reset on a frequent and short-term basis.

 

 

Note 9. Noncontrolling Interests

Noncontrolling interests represent the portion of net assets in consolidated subsidiaries that are not attributable, directly or indirectly, to the Partnership. For accounting purposes, the holders of noncontrolling interests of the Partnership include the Sponsors, which are SunPower and First Solar, as described in Note 1, and third-party investors under the tax equity financing facilities. As of both May 31, 2016 and November 30, 2015, First Solar and SunPower had noncontrolling interests of 31.1% and 40.7%, respectively, in OpCo.

In addition, certain subsidiaries of OpCo have entered into tax equity financing facilities with third-party investors under which the parties invest in entities that hold the solar power systems. The Partnership, through OpCo, holds controlling interests in these less-than-wholly-owned entities and has therefore fully consolidated these entities. The Partnership accounts for the portion of net assets using the Hypothetical Liquidation at Book Value (“HLBV”) Method in the consolidated entities attributable to the investors as "Redeemable noncontrolling interests" and "Noncontrolling interests" in its unaudited condensed consolidated financial statements. Noncontrolling interests in subsidiaries that are redeemable at the option of the noncontrolling interest holder are classified as "Redeemable noncontrolling interests in subsidiaries" between liabilities and equity on the unaudited condensed consolidated balance sheets.

As of May 31, 2016 and November 30, 2015, redeemable noncontrolling interests attributable to tax equity investors were $22.5 million and $89.7 million, respectively, and noncontrolling interests attributable to tax equity investors were $72.0 million and $11.8 million, respectively.

In addition, in connection with the Kern Phase 1(a) Acquisition on January 26, 2016, the Kingbird Acquisition on March 31, 2016, and the Hooper Acquisition on April 1, 2016, OpCo acquired the noncontrolling interest balances totaling $0.9 million, $11.7 million and $23.7 million, respectively. Please read Note 2—Business Combinations—2016 Acquisitions” for further details.

During both the three and six months ended May 31, 2016, such indirect subsidiaries of OpCo received $47.2 million in contributions from third-party investors under the related facilities, of which $46.8 million was transferred to an affiliate of First Solar for the remaining purchase price payment of the Kingbird Project. During the three and six months ended May 31, 2016, such indirect subsidiaries of OpCo attributed $52.9 million and $87.8 million, respectively, in losses to the third-party investors primarily as a result of allocating certain assets, including tax credits, if any, to the investors. During both the three and six months ended June 28, 2015,

 

28


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

such indirect subsidiaries of OpCo received $1.0 million in contributions from third-party investors under the related facilities and attributed $0.7 million in losses to the third-party investors primarily as a result of allocating certain assets, including tax credits, if any, to the investors.

During the three and six months ended May 31, 2016, such indirect subsidiaries of OpCo made distributions to third-party investors under the related facilities of $1.4 million and $2.6 million, respectively, compared to distributions of zero for both the three and six months ended June 28, 2015.

The following table presents the noncontrolling interest balances by entity, reported in shareholders’ equity in the unaudited condensed consolidated balance sheets as of May 31, 2016 and November 30, 2015:  

 

 

As of

 

 

 

May 31,

 

 

November 30,

 

(in thousands)

 

2016

 

 

2015

 

First Solar

 

$

187,925

 

 

$

159,624

 

SunPower

 

 

69,648

 

 

 

22,661

 

Tax equity investors

 

 

72,014

 

 

 

11,773

 

Total

 

$

329,587

 

 

$

194,058

 

 

 

 

Note 10. Shareholders’ Equity

On June 24, 2015, the Partnership completed its IPO by issuing 20,000,000 of its Class A shares representing limited partner interests in the Partnership to the public. As of May 31, 2016, the Partnership owned a 28.2% limited liability company interest in OpCo as well as a controlling noneconomic managing member interest in OpCo and the Sponsors collectively owned 51,000,000 Class B shares representing limited partner interests in the Partnership, and together, having owned a noncontrolling 71.8% limited liability company interest in OpCo. As of May 31, 2016, the following shares of the Partnership were outstanding:

 

 

 

Number

 

 

 

Shares

 

Outstanding

 

 

Shareholder

Class A shares

 

 

20,014,658

 

 

Public

Class B shares

 

 

22,116,925

 

 

First Solar

Class B shares

 

 

28,883,075

 

 

SunPower

Total shares outstanding

 

 

71,014,658

 

 

 

 

 

Cash Distribution

The Partnership is required to distribute its available cash (as defined in the Partnership Agreement) to the holders of Class A shares each quarter as described in “Note 12. Shareholders’ Equity” of the 2015 10-K.  On April 14, 2016, the Partnership paid its first quarter distribution of $4.5 million to Class A shareholders for the period from December 1, 2015 to February 29, 2016.

 

 

29


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

Note 11. Net Income Per Share

Basic net income per share is computed by dividing net income for the three and six months ended May 31, 2016 attributable to Class A shareholders by the weighted average number of Class A shares outstanding for the applicable period. Diluted net income per share is computed using basic weighted average Class A shares outstanding plus, if dilutive, any potentially dilutive securities outstanding during the period using the treasury-stock-type method. Pursuant to the Exchange Agreement among the Partnership, the General Partner, OpCo, a wholly owned subsidiary of SunPower and a wholly owned subsidiary of First Solar, the Sponsors can tender OpCo common units and an equal number of such Sponsor’s Class B shares for redemption, and the Partnership has the right to directly purchase the tendered units for, subject to the approval of its conflicts committee, cash or Class A shares. If Class B shares were converted into Class A shares, the net income attributable to Class A shares would proportionately increase, resulting in no change to net income per share for the three and six months ended May 31, 2016. In addition, there were no potentially dilutive securities (including any stock options, restricted stock and restricted stock units) for the three and six months ended May 31, 2016. Accordingly, basic and diluted net income per share for the three and six months ended May 31, 2016 was as follows:

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

May 31,

 

(in thousands, except per share amounts)

 

2016

 

 

2016

 

Basic net income per share:

 

 

 

 

 

 

 

 

Numerator:

 

 

 

 

 

 

 

 

Net income attributable to Class A shareholders

 

$

10,022

 

 

$

15,330

 

 

 

 

 

 

 

 

 

 

Denominator:

 

 

 

 

 

 

 

 

Basic weighted-average shares

 

 

20,011

 

 

 

20,009

 

 

 

 

 

 

 

 

 

 

Basic net income per share

 

$

0.50

 

 

$

0.77

 

 

 

 

 

 

 

 

 

 

Diluted net income per share:

 

 

 

 

 

 

 

 

Numerator:

 

 

 

 

 

 

 

 

Net income attributable to Class A shareholders

 

$

10,022

 

 

$

15,330

 

Add: Additional net income attributable to

   Class A shares due to increased percentage

   ownership in OpCo, net of tax, from the

   conversion of Class B shares

 

 

7,801

 

 

 

11,912

 

 

 

$

17,823

 

 

$

27,242

 

 

 

 

 

 

 

 

 

 

Denominator:

 

 

 

 

 

 

 

 

Basic weighted-average  shares

 

 

20,011

 

 

 

20,009

 

Effect of dilutive securities:

 

 

 

 

 

 

 

 

Class B shares (1)

 

 

15,500

 

 

 

15,500

 

Diluted weighted-average shares

 

 

35,511

 

 

 

35,509

 

 

 

 

 

 

 

 

 

 

Diluted net income per share

 

$

0.50

 

 

$

0.77

 

 

(1)

Up to the amount of OpCo common units held by Sponsors

 

 

 

30


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

Note 12. Related Parties  

Management Services Agreements

Immediately prior to the completion of the IPO on June 24, 2015, the Partnership, together with the General Partner, OpCo and Holdings, entered into similar but separate Management Services Agreements (the “MSAs”) with affiliates of each of the Sponsors (each, a “Service Provider”). Under the MSAs, the Service Providers will provide or arrange for the provision of certain administrative and management services for the Partnership and certain of its subsidiaries, including managing the Partnership’s day-to-day affairs, in addition to those services that are provided under existing O&M agreements and asset management agreements (“AMAs”) between affiliates of the Sponsors and certain of the subsidiaries of the Partnership. In August 2015, the First Solar MSA and the SunPower MSA were amended to adjust the annual management fee payable to each respective Service Provider. In the case of the First Solar MSA, OpCo will initially pay an annual management fee of $0.6 million to the First Solar Service Provider. In the case of the SunPower MSA, OpCo will initially pay an annual management fee of $1.1 million to the SunPower Service Provider. These payments are subject to annual adjustments for inflation. Between December 1, 2015 and November 30, 2016, each Service Provider will have a one-time right to increase the management fee by an amount not to exceed 15%.

Costs incurred for these services were $0.4 million and $0.8 million for the three and six months ended May 31, 2016, respectively. Costs incurred for these services were $0.02 million in each of the three and six months ended June 28, 2015.

Engineering, Procurement and Construction Agreements

Various projects are designed, engineered, constructed and commissioned pursuant to EPC agreements with affiliates of the Sponsors, which may include a 2- to 10-year system warranty against defects in materials, construction, fabrication and workmanship, and in some cases, may include a 25-year power and product warranty on certain modules.

As of May 31, 2016, all of the projects contributed by the Sponsors on the date of the IPO have achieved COD. The Kern Phase 1(a) Assets are construction-in-progress and expected to achieve COD within the quarter ending August 31, 2016. SunPower as the EPC provider is required to complete the Kern Phase 1(a) Assets and pursuant to the Amended and Restated Omnibus Agreement, all the associated costs to complete the Kern Phase 1(a) Assets are obligations of SunPower.

Operations and Maintenance Agreements and Asset Management Agreements

The Project Entities and certain other subsidiaries have entered into O&M agreements and AMAs with affiliates of the Sponsors, as applicable (except where such persons are otherwise subject to O&M agreements or AMAs with unaffiliated third parties). Under the terms of the O&M agreements and the AMAs, such affiliates have agreed to provide a variety of operation, maintenance and asset management services, and certain performance warranties or availability guarantees, to the subsidiaries of the Partnership in exchange for annual fees, which are subject to certain adjustments.

O&M services to the leased solar energy systems, also known as executory costs, were allocated to the Predecessor by SunPower and disclosed as cost of operations-SunPower in the combined carve-out statement of operations of the Predecessor.

Costs incurred for O&M and AMA services were $1.3 million and $2.3 million for the three and six months ended May 31, 2016, respectively, compared to $0.2 million and $0.5 million for the three and six months ended June 28, 2015, respectively.

Original Omnibus Agreement

In connection with the IPO, the Partnership entered into an omnibus agreement (the “Original Omnibus Agreement”), with its Sponsors, the General Partner, OpCo and Holdings, under which (i) each Sponsor was granted an exclusive right to perform certain services not otherwise covered by an O&M agreement or an AMA on behalf of the IPO Project Entities contributed by such Sponsor, (ii) with respect to any project in the Portfolio that did not achieve commercial operation as of the closing of the IPO, the Sponsor who contributed such project will pay to OpCo all costs required to complete such project, as well as certain liquidated damages in the event such project fails to achieve operability pursuant to an agreed schedule, (iii) each Sponsor agreed to certain undertakings on the part of its affiliates who are members of the IPO Project Entities or who provide asset management, construction, operating and maintenance and other services to the IPO Project Entities contributed by such Sponsor, (iv) to the extent a Sponsor continues to post credit support on behalf of an IPO Project Entity after it has been contributed to OpCo, OpCo agreed to reimburse such Sponsor upon any demand or draw under such credit support, and the Sponsor agreed to maintain such support pursuant to the applicable underlying contractual or regulatory requirements, (v) each Sponsor agreed to indemnify OpCo for any costs it incurs with respect to certain tax-

 

31


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

related events and events in connection with tax equity financing arrangements, and (vi) the parties agreed to a mutual undertaking regarding confidentiality and use of names, trademarks, trade names and other insignias.

In August 2015, the Original Omnibus Agreement was amended to provide that (i) with respect to each of the North Star Project and the Quinto Project, which were contributed to the Partnership by First Solar and SunPower, respectively, the Sponsors agreed to pay to OpCo the difference, if any, between the amount of network upgrade refunds projected to be received in respect of the Sponsor’s project at the time of contribution and the amount of network upgrade refunds projected to be received in respect of such project at the commencement of commercial operation of such project; and (ii) SunPower agreed to indemnify OpCo for certain costs it may incur in connection with the termination of certain tax equity financing arrangements relating to the contributed residential lease portfolios, which occurred before the Partnership’s IPO. During the three months ended February 29, 2016, the Partnership received a $10.0 million indemnity payment for a shortfall associated with the network upgrade refunds projected to be received.

In November 2015, the Original Omnibus Agreement was amended to provide that the indemnity for energy produced prior to commercial operation owed by each Sponsor to OpCo will be calculated on an aggregate basis with respect to all projects contributed by such Sponsor in connection with the IPO, rather than on a project-by-project basis. As a result of this indemnity, the Partnership received $3.9 million as an indemnity payment from SunPower for a test energy shortfall associated with the Quinto Project.  

 

On January 26, 2016, in connection with the Kern Phase 1(a) Acquisition, the Original Omnibus Agreement was amended to update the schedules thereto to include the solar power systems held indirectly by the Kern Class B Partnership at the closing of the Kern Phase 1(a) Acquisition for all purposes, except for certain tax indemnities which are included in the Kern Purchase Agreement. 

 

On March 31, 2016, in connection with the Kingbird Acquisition, the Original Omnibus Agreement was amended (the “Kingbird Omnibus Amendment”) to update the schedules to the parties’ existing Original Omnibus Agreement to include the Kingbird Project for all purposes, except for certain tax indemnities which are included in the Kingbird Purchase Agreement.

On April 1, 2016, in connection with the Hooper Acquisition, the Original Omnibus Agreement was amended (the “Hooper Omnibus Amendment”) to update the schedules to the parties’ existing Original Omnibus Agreement to include the Hooper Project for all purposes, except for certain tax indemnities which are included in the Hooper Purchase Agreement.

On April 6, 2016, the Partnership amended and restated the Original Omnibus Agreement (as amended and restated, the “Amended and Restated Omnibus Agreement”) with its Sponsors, the General Partner, OpCo and Holdings (i) to expand each sponsor’s tax equity indemnification obligations (as further discussed below), (ii) to provide that the sponsors’ obligation to cover costs required to achieve commercial operation (as further discussed below) will be reduced to the extent OpCo and its affiliates receive alternate funds that are contemplated to be used to pay project expenses, and such funds are applied accordingly, and (iii) to integrate changes from prior amendments to the Original Omnibus Agreement, including the Kingbird Omnibus Amendment and the Hooper Omnibus Amendment. The material provisions of the Amended and Restated Omnibus Agreement are as follows: (a) each Sponsor was granted an exclusive right to perform certain services not otherwise covered by an O&M agreement or an AMA on behalf of the Project Entities contributed by such Sponsor; (b) with respect to any project in the Portfolio that has not achieved commercial operation, the Sponsor who contributed such project will pay to OpCo all costs required to complete such project, subject to certain exclusions; (c) with respect to any project in the Portfolio that did not achieve commercial operation as of the closing of the IPO, the Sponsor who contributed such project will pay to OpCo certain liquidated damages in the event such project fails to achieve operability pursuant to an agreed schedule; (d) with respect to the Quinto Project and the North Star Project, the Sponsor who contributed such project will pay to OpCo the difference, if any, between the amount of network upgrade refunds projected to be received in respect of such sponsor’s project at the time of contribution and the amount of network upgrade refunds projected to be received given the actual amount of upgrade costs incurred in respect of such project; (e) certain undertakings on the part of each Sponsor’s affiliates who act as a manager of any Project Entity or who provide asset management, construction, operating and maintenance and other services to the Project Entities contributed by such Sponsor; (f) to the extent a Sponsor continues to post credit support on behalf of a Project Entity after it has been contributed to OpCo, OpCo agreed to reimburse such Sponsor upon any demand or draw under such credit support, and the Sponsor agreed to maintain such support pursuant to the applicable underlying contractual or regulatory requirements; (g) each Sponsor agreed to indemnify OpCo for any costs it incurs with respect to certain tax-related events and events in connection with tax equity financing arrangements; and (h) the parties agreed to a mutual undertaking regarding confidentiality and use of names, trademarks, trade names and other insignias. Upon the execution of the Amended and Restated Omnibus Agreement, the tax indemnities included in the Kern Purchase Agreement, the Kingbird Purchase Agreement and the Hooper Purchase Agreement automatically terminated.

 

32


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

Promissory Note

On November 25, 2015, OpCo, issued a Promissory Note to First Solar in the principal amount of $2.0 million (the “Note”), in exchange for First Solar’s loan of such amount to OpCo. Upon the receipt of certain payments by the Solar Gen 2 Project Entity from SDG&E under the power purchase agreement between the Solar Gen 2 Project Entity and SDG&E, which had been previously withheld pending completion of an administrative requirement (each, a “Specified Payment”), OpCo is obligated to repay a portion of the principal amount of the Note equal to such Specified Payment and the unpaid balance of all interest accrued under the Note to and including the date of such repayment. Interest will accrue at a rate of 1% on the portion of the principal of the Note equal to the amount of each Specified Payment from the date SDG&E remits such payment to the Solar Gen 2 Project Entity through the date that OpCo repays such amount to First Solar as described above. OpCo is permitted to prepay the Note at any time without penalty or premium.

Purchase and Sale Agreements

Prior to the closing of the IPO, each of (i) SSCA XIII Holding Company, LLC, an indirect subsidiary of OpCo and the holder of the Quinto Project Entity (“Quinto Holdings”), (ii) SSCA XXXI Holding Company, LLC, an indirect subsidiary of OpCo and the indirect holder of the RPU Project Entity (“RPU Holdings”), and (iii) SunPower Commercial Holding Company I, LLC, an indirect subsidiary of OpCo and the holder of the UC Davis Project Entity and the Macy’s California Project Entities (“C&I Holdings,” and together with Quinto Holdings and RPU Holdings, the “SP Holding Companies”), entered into purchase and sale agreements (collectively, the “PSAs”) with affiliates of SunPower in connection with SunPower’s contribution of the SP Holding Companies to OpCo, and also entered into certain tax equity financing arrangements with third party investors to finance the purchases of the SP Holding Companies. Pursuant to the PSAs, the purchase prices were paid in installments, which were made when the projects met certain construction milestones, with final installment payments due upon COD. Since all of these projects have attained COD, there are no purchase price payments remaining.

On January 26, 2016, OpCo entered into the Kern Purchase Agreement with SunPower pursuant to which OpCo agreed to purchase an interest in the Kern Project, as further described above in Note 2. Effective January 26, 2016, a subsidiary of OpCo acquired from SunPower all of the class B limited liability company interests of the Kern Class B Partnership.  Pursuant to the Kern Purchase Agreement, the purchase price for the Kern Project will be paid by OpCo when each phase of the project reaches “mechanical completion.” In addition, on January 22, 2016, a subsidiary of the Kern Class B Partnership entered into a tax equity financing facility with a third-party investor, which allocates to OpCo a certain share of cash flows from the Kern Project pursuant to a specified distribution waterfall. Additional purchase price payments of $28.4 million will be funded by the tax equity investor’s capital contributions, which will be made when the Kern Project’s phases meet certain construction milestones and will be transferred to affiliates of SunPower for the remaining purchase price payments. Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details. 

On March 31, 2016, OpCo entered into the Kingbird Purchase Agreement with First Solar, pursuant to which OpCo agreed to acquire an interest in the Kingbird Project, as further described above in Note 2. Effective March 31, 2016, a subsidiary of OpCo acquired FSAM Kingbird Solar Holdings, LLC from First Solar. FSAM Kingbird Solar Holdings, LLC holds the class B limited liability company interests of Kingbird Solar, LLC. The Kingbird Project Entities are direct subsidiaries of Kingbird Solar, LLC, and OpCo holds a controlling interest in the Kingbird Solar, LLC effective March 31, 2016. Pursuant to the Kingbird Purchase Agreement, the $60.0 million purchase price due from OpCo to acquire an interest in the Kingbird Project was paid in installments with $42.9 million in cash paid to Kingbird Seller on March 31, 2016 and a $17.1 million contribution to FSAM Kingbird Solar Holdings, LLC on May 31, 2016 which was subsequently paid to an affiliate of First Solar for the remaining balance due under the Kingbird Project’s EPC contract.  In addition, Kingbird Solar, LLC entered into a tax equity financing facility with a third-party investor, which allocates to OpCo a certain share of cash flows from the Kingbird Project pursuant to a specified distribution waterfall. The tax equity investor made capital contributions to fund purchase price payments of approximately $11.7 million on February 26, 2016 and $46.8 million on May 31, 2016, which were made when the Kingbird Project’s phases met certain construction milestones and were transferred to an affiliate of First Solar for the remaining purchase price payments. Since the Kingbird Project has attained COD as of May 31, 2016 there are no purchase price payments remaining. Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details. 

On March 31, 2016, OpCo entered into the Hooper Purchase Agreement with SunPower, pursuant to which OpCo agreed to acquire an interest in the Hooper Project, as further described above in Note 2. Effective April 1, 2016, a subsidiary of OpCo acquired

 

33


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

from SunPower all of the class B limited liability company interests of the Hooper Class B Partnership for a cash purchase price of $53.5 million. Since the Hooper Project attained COD prior to the acquisition date there are no purchase price payments remaining. Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details. 

First Solar ROFO Agreement

On March 28, 2016, OpCo entered into an Amendment and Waiver to Right of First Offer Agreement (“Waiver No. 1”) with First Solar. Pursuant to Waiver No. 1, OpCo waived certain of its rights under the First Solar ROFO Agreement, dated as of June 24, 2015, between OpCo and First Solar, and First Solar and OpCo agreed to amend certain provisions of the First Solar ROFO Agreement. Pursuant to the First Solar ROFO Agreement, First Solar previously granted to OpCo a right of first offer to purchase certain solar energy generating facilities for a period of five years. Such solar projects included the 300 MW Stateline facility in San Bernardino County, California (“Stateline”). Pursuant to Waiver No. 1, OpCo waived its rights under the First Solar ROFO Agreement with respect to 24% of the aggregate interest in Stateline. Concurrently, OpCo’s rights under the First Solar ROFO Agreement were expanded to cover First Solar’s 100 MW Switch Station 1 and 79-MW Switch Station 2 facilities in Clark County, Nevada (collectively, “Switch Station”), which had not previously been subject to the First Solar ROFO Agreement. Additionally, OpCo and First Solar agreed to impose certain limitations on First Solar’s right to offer projects to OpCo under the First Solar ROFO Agreement (each, a “ROFO Offer”). These limitations include commitments by First Solar (i) to not make ROFO Offers in respect of Switch Station or Stateline before February 1, 2017 and October 1, 2016, respectively, and (ii) during the period between October 1, 2016 and December 31, 2016, to limit all ROFO Offers in respect of Stateline to either (A) an offer for 50% of First Solar’s remaining indirect interest or (B) an offer pursuant to which OpCo may elect to purchase either 50% or 100% of First Solar’s remaining indirect interest. On June 28, 2016, OpCo entered into an Amendment and Waiver No. 2 to the First Solar ROFO Agreement (“Waiver No. 2”) with First Solar. Please read “—Note 15—Subsequent Events” for further details.

Maryland Solar Lease Arrangement

The Maryland Solar Project Entity has leased the Maryland Solar Project to an affiliate of First Solar. Under the arrangement, First Solar’s affiliate is obligated to pay a fixed amount of rent that is set based on the expected operations of the plant. The lease agreement will expire on December 31, 2019.

Operating Expense Allocations

The Predecessor’s condensed carve-out financial statements include allocations of certain SunPower operating expenses. The allocations include: (i) charges that were incurred by SunPower that were specifically identified as attributable to the Predecessor; and (ii) an allocation of applicable SunPower operating expenses based on the proportional level of effort attributable to the operation of the Predecessor’s portfolio of solar energy systems leased to residential homeowners and projects under construction. These expenses include legal, accounting, tax, treasury, information technology, insurance, employee benefit costs, human resources, procurement and other corporate services and infrastructure costs. The allocation of applicable SunPower operating expenses was principally based on management’s estimate of the proportional level of effort devoted by corporate resources. The amounts allocated to the Predecessor related to SunPower operating expenses were $3.0 million and $4.8 million for the three and six months ended June 28, 2015, respectively, and are disclosed as SG&A expenses on the unaudited condensed consolidated statement of operations.

 

 

 

Note 13. Income Taxes

The provision for income taxes differed from the amount computed by applying the statutory U.S. federal rate of 35% primarily due to the tax impact of equity in earnings, the tax impact of noncontrolling interest, a permanent difference between the amount recognized as deductible for U.S. GAAP and tax purposes related to board of director share-based compensation, and state tax rates (net of federal benefit) in various jurisdictions, most significantly California.

The Partnership’s financial reporting year-end is November 30 while its tax year-end is December 31. The Partnership has elected to base the tax provision on the financial reporting year; therefore, since the 2016 financial reporting year is December 1, 2015 through November 30, 2016, the taxable income (loss) included in the 2016 tax provision is for the tax year ended December 31, 2015. The provision accrued at the financial reporting year-end will be a discrete period computation, and the tax credits and

 

34


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

permanent differences recognized in that accrual will be those generated between the tax year-end date and the financial reporting year-end date.

Although organized as a limited partnership under state law, the Partnership elected to be treated as a corporation for U.S. federal income tax purposes. Accordingly, the Partnership is subject to U.S. federal income taxes at regular corporate rates on its net taxable income, and distributions it makes to holders of its Class A shares will be taxable as ordinary dividend income to the extent of its current and accumulated earnings and profits as computed for U.S. federal income tax purposes.

The Partnership accounts for income taxes under the asset and liability method, which requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of events that have been included in the unaudited condensed consolidated financial statements. Under this method, deferred tax assets and liabilities are determined on the basis of the differences between the financial statement and tax bases of assets and liabilities using enacted tax rates in effect for the year in which the differences are expected to reverse. The effect of a change in tax rates on deferred tax assets and liabilities is recognized in income in the period that includes the enactment date.

The Partnership recognizes deferred tax assets to the extent that it believes these assets are more likely than not to be realized. In making such a determination, the Partnership considers all available positive and negative evidence, including future reversals of existing taxable temporary differences, projected future taxable income, tax-planning strategies and results of recent operations. If the Partnership determines that it would be able to realize its deferred tax assets in the future in excess of their net recorded amount, it would make an adjustment to the deferred tax asset valuation allowance, which would reduce the provision for income taxes.

The Partnership records uncertain tax positions in accordance with ASC 740 — Income Taxes on the basis of a two-step process whereby (1) it determines whether it is more likely than not that the tax positions will be sustained on the basis of the technical merits of the position and (2) for those tax positions that meet the more-likely-than-not recognition threshold, the Partnership recognizes the largest amount of tax benefit that is more than 50 percent likely to be realized upon ultimate settlement with the related tax authority.

 

 

Note 14. Segment Information

The Partnership manages its Portfolio as one segment that operates a portfolio of solar energy generation systems. It operates as a single reportable segment based on the “management” approach.

All operating revenues for the three and six months ended May 31, 2016 and June 28, 2015 were from customers located in the United States. Operating revenues from one customer, First Solar, as lessee of the Maryland Solar Project, accounted for 10% and 13% of total operating revenues for the three and six months ended May 31, 2016, respectively, compared to zero in each of the three and six months ended June 28, 2015. Long-lived assets consisting of property and equipment, net, were located in the United States.

 

 

Note 15. Subsequent Events

 

The Partnership declared a second quarter distribution for its Class A shares of $0.2325 per share for the period from March 1, 2016 to May 31, 2016. The second quarter distribution will be paid on July 15, 2016 to shareholders of record as of July 5, 2016.

 

On June 21, 2016, the Board of Directors of the General Partner, with the concurrence of the Conflicts Committee, determined that OpCo has met the tests in the OpCo’s Amended and Restated Limited Liability Company Agreement (the “OpCo LLC Agreement”) to terminate OpCo’s distribution forbearance period. As a result, starting with the quarter ending August 31, 2016, the OpCo units held by First Solar and SunPower will be entitled to distributions.

 

On June 28, 2016, OpCo entered into Waiver No. 2 to the First Solar ROFO Agreement with First Solar. Pursuant to the First Solar ROFO Agreement, First Solar previously granted to OpCo a right of first offer to purchase certain solar energy generating facilities for a period of five years. Such solar projects included the 250 MW Moapa solar generation project in Clark County, Nevada (“Moapa”). Pursuant to Waiver No. 2, OpCo waived its rights under the First Solar ROFO Agreement with respect to Moapa. Concurrently, OpCo’s rights under the First Solar ROFO Agreement were expanded to cover First Solar’s 130 MW California Flats and 150 MW California Flats facilities in Monterey County, California, which had not previously been subject to the First Solar ROFO Agreement.

 

 

35


Table of Contents

8point3 Energy Partners LP

Notes to Unaudited Condensed Consolidated Financial Statements — Continued

 

On June 29, 2016, OpCo entered into a Contribution Agreement with SunPower and SunPower AssetCo, LLC, a wholly-owned subsidiary of SunPower, to acquire an interest in the 5 MW project which holds roof-mounted solar photovoltaic systems being installed at certain Macy’s department stores in Maryland (“Macy’s Maryland Project”) for $12.0 million in cash (the “Macy’s Maryland Acquisition”). Ownership and cash flows of the Macy’s Maryland Project are subject to a tax equity financing arrangement with a third-party investor. The Macy’s Maryland Acquisition is expected to close on July 1, 2016, subject to customary closing conditions, and OpCo expects to fund 100% of the purchase price for the Macy’s Maryland Project with cash on hand.

 

 

 

 

36


Table of Contents

 

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

You should read the following discussion and analysis of our financial condition and results of operations in conjunction with our unaudited consolidated financial statements and the notes thereto included elsewhere in this Quarterly Report on Form 10-Q and our 2015 10-K.

Cautionary Statement Regarding Forward-Looking Statements

This Quarterly Report on Form 10-Q contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements give our current expectations and contain projections of results of operations or of financial condition or forecasts of future events. Words such as “could,” “will,” “may,” “assume,” “forecast,” “position,” “predict,” “strategy,” “expect,” “intend,” “plan,” “estimate,” “anticipate,” “believe,” “project,” “budget,” “potential” or “continue” and similar expressions are used to identify forward-looking statements. Without limiting the generality of the foregoing, forward-looking statements contained in this report include our expectations of plans, strategies, objectives, growth and anticipated financial and operational performance. Forward-looking statements can be affected by assumptions used or by known or unknown risks or uncertainties. Consequently, no forward-looking statements can be guaranteed.

A forward-looking statement may include a statement of the assumptions or bases underlying the forward-looking statement. We believe that we have chosen these assumptions or bases in good faith and that they are reasonable. However, when considering these forward-looking statements, you should keep in mind the risk factors and other cautionary statements in this report and in our 2015 10-K. Those risk factors and other factors noted throughout this report and in the 2015 10-K could cause our actual results to differ materially from those disclosed in any forward-looking statement. You should also understand that it is not possible to predict or identify all such factors and should not consider the risk factors included in this report and the 2015 10-K to be a complete statement of all potential risks and uncertainties. Please read “Risk Factors” in Part II, Item 1A. of this Quarterly Report on Form 10-Q and in Part I, Item 1A. of the 2015 10-K.

Each forward-looking statement speaks only as of the date of the particular statement and we undertake no obligation to publicly update or revise any forward-looking statements except as required by law.

Overview

Description of Partnership

We are a growth-oriented limited partnership formed by First Solar and SunPower, our Sponsors, to own, operate and acquire solar energy generation projects. Our IPO was completed on June 24, 2015, by issuing 20,000,000 Class A shares representing limited partner interests to the public. As of May 31, 2016, we owned a 28.2% limited liability company interest in OpCo as well as a controlling non-economic managing member interest in OpCo and the Sponsors collectively owned 51,000,000 Class B shares in the Partnership, with SunPower and First Solar owning 28,883,075 and 22,116,925 Class B shares, respectively, and together owning a noncontrolling 71.8% limited liability company interest in OpCo. Because we consolidate OpCo, our financial results are shown on a 100% basis and are not adjusted to reflect our Sponsors’ noncontrolling limited liability company interest in OpCo.

We received $393.8 million of net proceeds from the sale of the Class A shares in the IPO after deducting the underwriting fees and structuring fees (but before offering expenses, which were paid by our Sponsors). We used all of the net proceeds of the IPO to purchase 20,000,000 OpCo common units from OpCo. OpCo used (i) approximately $154.4 million of such net proceeds to make a cash distribution to First Solar, (ii) approximately $201.6 million of such net proceeds to make a cash distribution to SunPower and (iii) approximately $37.8 million of such net proceeds for general purposes, including to fund future acquisition opportunities.

Our Portfolio

Our Portfolio, which we acquired from our Sponsors, consists of interests in 525 MW of solar energy projects.  

As of May 31, 2016, we owned interests in eight utility-scale solar energy projects, all of which are operational. These assets represent 89% of the generating capacity of our Portfolio. As of May 31, 2016, we owned interests in three commercial and industrial (“C&I”) solar energy projects, two of which were operational and one of which was in late-stage construction, and a portfolio of residential DG Solar assets, which represent 11% of the generating capacity of our Portfolio. Our Portfolio is located entirely in the United States and consists of utility-scale and C&I assets that sell substantially all of their output under long-term, fixed-price offtake agreements with investment grade offtake counterparties and residential DG Solar assets that are leased under long-term fixed-price offtake agreements with high credit quality residential customers with FICO scores averaging 765 at the time of the initial contract. As of May 31, 2016, the weighted average remaining life of offtake agreements across our Portfolio was 20.8 years.

 

37


Table of Contents

 

The following table provides an overview of the assets that comprise our Portfolio:

 

 

 

 

 

 

 

 

 

 

Remaining

 

 

 

 

 

 

 

 

 

 

 

Term of

 

 

 

Commercial

 

 

 

 

 

 

 

Offtake Agreement

 

Project

 

Operation Date(1)

 

MW(ac)(2)

 

 

Counterparty

 

(in years)(3)

 

Utility

 

 

 

 

 

 

 

 

 

 

 

 

Maryland Solar

 

February 2014

 

 

20

 

 

First Energy

Solutions

 

 

16.8

 

Solar Gen 2

 

November 2014

 

 

150

 

 

San Diego Gas &

Electric

 

 

23.5

 

Lost Hills Blackwell

 

April 2015

 

 

32

 

 

City of

Roseville/Pacific

Gas and Electric

 

27.6(4)

 

North Star

 

June 2015

 

 

60

 

 

Pacific Gas and

Electric

 

 

19.1

 

RPU

 

September 2015

 

 

7

 

 

City of Riverside

 

 

24.3

 

Quinto

 

November 2015

 

 

108

 

 

Southern California

Edison

 

 

19.5

 

Hooper

 

December 2015

 

 

50

 

 

Public Service

Company of Colorado

 

 

19.6

 

Kingbird

 

April 2016

 

 

40

 

 

Southern California

Public Power Authority (5)

 

 

19.9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Commercial & Industrial

 

 

 

 

 

 

 

 

 

 

 

 

UC Davis

 

September 2015

 

 

13

 

 

University of

California

 

 

19.3

 

Macy's California

 

October 2015

 

 

3

 

 

Macy's Corporate

Services

 

 

19.4

 

Kern Phase 1(a) Assets

 

December 2016

 

 

3

 

 

Kern High School District

 

 

20.0

 

Residential Portfolio

 

June 2014

 

 

39

 

 

Approx. 5,900

homeowners(6)

 

16.3(7)

 

Total

 

 

 

 

525

 

 

 

 

 

 

 

 

(1)

For the Macy’s California Project and the Kern Phase 1(a) Assets (as defined below), commercial operation date (“COD”) represents the first date on which all of the solar generation systems within each of the Macy’s California Project and the Kern Phase 1(a) Assets, respectively, have achieved or are expected to achieve COD. Please read “—Note 2—Business Combinations—2016 Acquisitions” for further details on the Kern Phase 1(a) Assets. For the Residential Portfolio, COD represents the first date on which all of the residential systems within the Residential Portfolio have achieved COD.

(2)

The megawatts (“MW”) for the projects in which the Partnership owns less than a 100% interest or in which the Partnership is the lessor under any sale-leaseback financing are shown on a gross basis

(3)

Remaining term of offtake agreement is measured from the later of May 31, 2016 or the COD of the applicable project.

(4)

Remaining term comprised of 2.6 years on a power purchase agreement (“PPA”) with the City of Roseville, California, followed by a 25-year PPA with Pacific Gas and Electric Company (“PG&E”) starting in 2019.

(5)

The Kingbird project is subject to two separate PPAs with member cities of the Southern California Public Power Authority.

(6)

Comprised of the approximately 5,900 solar installations located at homes in Arizona, California, Colorado, Hawaii, Massachusetts, New Jersey, New York, Pennsylvania and Vermont, that are held by SunPower Residential I, LLC (the “Residential Portfolio Project Entity”) and has an aggregate nameplate capacity of 39 MW.

(7)

Remaining term is the weighted average duration of all of the residential leases, in each case measured from May 31, 2016.

 

2016 Acquisitions

 

On January 26, 2016, OpCo entered into the Kern Purchase Agreement with SunPower, pursuant to which OpCo agreed to purchase an interest in the Kern Project for aggregate consideration of $35.0 million in cash. On March 31, 2016, OpCo entered into the Kingbird Purchase Agreement with First Solar, pursuant to which OpCo agreed to acquire an interest in the Kingbird Project for

 

38


Table of Contents

 

aggregate consideration of $60.0 million in cash. On March 31, 2016, OpCo entered into the Hooper Purchase Agreement with SunPower, pursuant to which OpCo agreed to acquire an interest in the Hooper Project for aggregate consideration of $53.5 million in cash. On June 29, 2016, OpCo entered into a Contribution Agreement with SunPower, pursuant to which OpCo will acquire an interest in the 5 MW project which holds roof-mounted solar photovoltaic systems being installed at certain Macy’s department stores in Maryland for $12.0 million in cash (the “Macy’s Maryland Acquisition”).  The Macy’s Maryland Acquisition is expected to close on July 1, 2016, subject to customary closing conditions.  Please read Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements— Note 2—Business Combinations—2016 Acquisitions” for further information on the Kern Phase 1(a) Acquisition, the Kingbird Acquisition and the Hooper Acquisition, and “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 15—Subsequent Events” for further information on the Macy’s Maryland Acquisition.

For more information about our tax equity structures in general, please read Part I, Item 1. “Business—Tax Equity Financing” of our 2015 10-K.

 

How We Generate Revenues

 

Our revenues are a function of the volume of electricity generated and sold by our projects and rental payments under lease agreements. The assets in our Portfolio sell substantially all of their output or are leased under long-term, fixed price offtake agreements with investment grade utility-scale and C&I offtakers, as well as high credit quality residential customers with an average FICO score of 765 at the time of initial contract. As of May 31, 2016, the weighted average remaining life of offtake agreements across our Portfolio was 20.8 years, with the offtake agreements of our Utility Project Entities having remaining terms ranging from 16.8 to 27.6 years and our C&I offtake agreements and residential offtake agreements having remaining terms ranging from 16.3 to 20.0 years.

 

Under our Utility Project Entities’ offtake agreements, each Utility Project Entity generally receives a fixed price over the term of the offtake agreement with respect to 100% of its output, subject to certain adjustments. Our Utility Project Entities’ offtake agreements have certain availability or production requirements, and if such requirements are not met, then in some cases the applicable project is required to pay the offtake counterparty a specified damages amount, and in some cases the offtake counterparty has the right to terminate the offtake agreement or reduce the contract quantity. In addition, under our Utility Project Entities’ offtake agreements, each party typically has the right to terminate upon written notice ranging from ten to 60 days following the occurrence of an event of default that has not been cured within the applicable cure period, if any.

 

Under the offtake agreements of our C&I Project Entities, each C&I Project Entity generally receives a fixed price over the term of the offtake agreement with respect to 100% of its output, subject to certain adjustments. Certain of our C&I Project Entities’ offtake agreements have availability or production requirements, and if such requirements are not met, the offtake counterparty has the right to terminate the offtake agreement. Under our C&I Project Entities’ offtake agreements, each party typically has the right to terminate upon written notice ranging from ten to 30 days following the occurrence of an event of default that has not been cured within the applicable cure period, if any.

 

Under our Residential Portfolio Project Entity’s offtake agreements, homeowners are obligated to make lease payments to the Residential Portfolio Project Entity on a monthly basis. The customer’s monthly payment is fixed based on a calculation that takes into account expected solar energy generation, and certain of our current offtake agreements contain price escalators with an average of a 1% increase annually. Customers are eligible to purchase the leased solar power systems to facilitate the sale or transfer of their home. The agreements also include an early buy-out option at fair market value exercisable in the seventh year that allows customers to purchase the solar power system.

 

How We Evaluate Our Operations

 

Our management uses a variety of financial metrics to analyze our performance. The key financial metrics we evaluate are Adjusted EBITDA and cash available for distribution.

 

Adjusted EBITDA.  

 

We define Adjusted EBITDA as net income (loss) plus interest expense, net of interest income, income tax provision, depreciation, amortization and accretion, including our proportionate share of net interest expense, income taxes and depreciation, amortization and accretion from our unconsolidated affiliates that are accounted for under the equity method, and share-based

 

39


Table of Contents

 

compensation; and excluding the effect of certain other non-cash or non-recurring items that we do not consider to be indicative of our ongoing operating performance such as, but not limited to, mark to market adjustments to the fair value of derivatives related to our interest rate hedges and transaction costs incurred for our acquisitions of projects. Adjusted EBITDA is a non-U.S. GAAP financial measure. This measurement is not recognized in accordance with U.S. GAAP and should not be viewed as an alternative to U.S. GAAP measures of performance. The U.S. GAAP measure most directly comparable to Adjusted EBITDA is net income (loss). The presentation of Adjusted EBITDA should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items.

We believe Adjusted EBITDA is useful to investors in evaluating our operating performance because securities analysts and other interested parties use such calculations as a measure of financial performance and borrowers’ ability to service debt. In addition, Adjusted EBITDA is used by our management for internal planning purposes including certain aspects of our consolidated operating budget and capital expenditures. It is also used by investors to assess the ability of our assets to generate sufficient cash flows to make distributions to our Class A shareholders.

However, Adjusted EBITDA has limitations as an analytical tool because it does not reflect our cash expenditures or future requirements for capital expenditures or contractual commitments, does not reflect changes in, or cash requirements for, working capital, does not reflect significant interest expense or the cash requirements necessary to service interest or principal payments on our outstanding debt or cash distributions on tax equity, does not reflect payments made or future requirements for income taxes, and excludes the effect of certain other cash flow items, all of which could have a material effect on our financial condition and results of operations. Adjusted EBITDA is a non-U.S. GAAP measure and should not be considered an alternative to net income (loss) or any other performance or liquidity measure determined in accordance with U.S. GAAP, nor is it indicative of funds available to fund our cash needs. In addition, our calculations of Adjusted EBITDA are not necessarily comparable to EBITDA as calculated by other companies. Investors should not rely on these measures as a substitute for any U.S. GAAP measure, including net income (loss).

Cash Available for Distribution.    

We use cash available for distribution, which we define as Adjusted EBITDA less equity in earnings of unconsolidated affiliates, cash interest paid, cash income taxes paid, maintenance capital expenditures, cash distributions to noncontrolling interests and principal amortization of indebtedness plus cash distributions from unconsolidated affiliates, test electricity generation and cash proceeds from sales-type residential leases. Our cash flow is generated from distributions we receive from OpCo each quarter. OpCo’s cash flow is generated primarily from distributions from the Project Entities. As a result, our ability to make distributions to our Class A shareholders depends primarily on the ability of the Project Entities to make cash distributions to OpCo and the ability of OpCo to make cash distributions to its unitholders.

We believe cash available for distribution is useful to investors in evaluating our operating performance because securities analysts and other interested parties use such calculations as a measure of our ability to make our minimum quarterly distribution. In addition, cash available for distribution is used by our management team for determining future acquisitions and managing our growth. The U.S. GAAP measure most directly comparable to cash available for distribution is net income (loss).

However, cash available for distribution has limitations as an analytical tool because it does not capture the level of capital expenditures necessary to maintain the operating performance of our projects, does not include changes in operating assets and liabilities and excludes the effect of certain other cash flow items, all of which could have a material effect on our financial condition and results from operations. Cash available for distribution is a non-U.S. GAAP measure and should not be considered an alternative to net income (loss) or any other performance or liquidity measure determined in accordance with U.S. GAAP, nor is it indicative of funds available to fund our cash needs. In addition, our calculations of cash available for distribution are not necessarily comparable to cash available for distribution as calculated by other companies. Investors should not rely on these measures as a substitute for any U.S. GAAP measure, including net income (loss).

The following table presents a reconciliation of net loss to Adjusted EBITDA and cash available for distribution for the three and six months ended May 31, 2016 and June 28, 2015:

 

40


Table of Contents

 

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Net loss

 

$

(161

)

 

$

(10,852

)

 

$

(7,214

)

 

$

(20,019

)

Add (Less):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interest expense, net of interest income

 

 

2,715

 

 

 

(583

)

 

 

5,303

 

 

 

462

 

Income tax provision

 

 

6,681

 

 

 

103

 

 

 

10,218

 

 

 

109

 

Depreciation, amortization and accretion

 

 

5,388

 

 

 

748

 

 

 

10,014

 

 

 

1,478

 

Share-based compensation

 

 

56

 

 

 

 

 

 

112

 

 

 

 

Selling, general and administrative (1)

 

 

 

 

 

3,849

 

 

 

 

 

 

6,372

 

Loss on cash flow hedges related to Quinto interest

   rate swaps

 

 

 

 

 

2,206

 

 

 

 

 

 

5,448

 

Loss on termination of residential financing

   obligations

 

 

 

 

 

5,771

 

 

 

 

 

 

6,477

 

Acquisition-related transaction costs (2)

 

 

829

 

 

 

 

 

 

1,662

 

 

 

 

Unrealized gain on derivatives (3)

 

 

(325

)

 

 

 

 

 

(251

)

 

 

 

Add proportionate share from equity method

   investments (4)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interest expense, net of interest income

 

 

(53

)

 

 

(15

)

 

 

(95

)

 

 

(15

)

Depreciation, amortization and accretion

 

 

2,234

 

 

 

161

 

 

 

5,286

 

 

 

161

 

Adjusted EBITDA

 

$

17,364

 

 

$

1,388

 

 

$

25,035

 

 

$

473

 

Less:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Equity in earnings of unconsolidated affiliates, net

   with (4) above (5)

 

 

(7,205

)

 

 

(364

)

 

 

(10,620

)

 

 

(364

)

Cash interest paid (6)

 

 

(3,110

)

 

 

 

 

 

(5,898

)

 

 

 

Cash distributions to non-controlling interests

 

 

(420

)

 

 

 

 

 

(904

)

 

 

 

Add:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cash distributions from unconsolidated affiliates (7)

 

 

2,633

 

 

 

 

 

 

9,057

 

 

 

 

State and local rebates (8)

 

 

 

 

 

 

 

 

299

 

 

 

 

Cash proceeds from sales-type residential leases (9)

 

 

630

 

 

 

794

 

 

 

1,271

 

 

 

1,492

 

Indemnity payment from SunPower (10)

 

 

 

 

 

 

 

 

9,973

 

 

 

 

Test electricity generation (11)

 

 

421

 

 

 

 

 

 

421

 

 

 

 

Estimated cash available for distribution

 

$

10,313

 

 

$

1,818

 

 

$

28,634

 

 

$

1,601

 

 

(1)

Represents the non-cash allocation of the Predecessor’s corporate overhead in selling, general and administrative expenses.

(2)

Represents acquisition-related financial advisory, legal and accounting fees associated with ROFO Project interests purchased and expected to be purchased by us in the future.

(3)

Represents the changes in fair value of interest rate swaps that were not designated as cash flow hedges.

(4)

Represents our proportionate share of net interest expense, income taxes and depreciation, amortization and accretion from our unconsolidated affiliates that are accounted for under the equity method.

(5)

Equity in earnings of unconsolidated affiliates represents the earnings from the Solar Gen 2 Project, the North Star Project and the Lost Hills Blackwell Project and is included on our unaudited condensed consolidated statements of operations.

(6)

Represents cash interest payments related to our term loan and revolving credit facilities post-IPO. The interest payments for the Quinto Credit Facility on the Predecessor’s combined carve-out financial statements were excluded as they were funded by one of our Sponsors.

(7)

Cash distributions from unconsolidated affiliates represent the cash received by OpCo with respect to its 49% interest in the Solar Gen 2 Project, the North Star Project and the Lost Hills Blackwell Project.

(8)

State and local rebates represent cash received from state or local governments for owning certain solar energy systems. The receipt of state and local rebates is accounted for as a reduction in the asset carrying value rather than operating revenue.

(9)

Cash proceeds from sales-type residential leases, net, represent gross rental cash receipts for sales-type leases, less sales-type revenue and lease interest income that is already reflected in net income (loss) during the period. The corresponding revenue for

 

41


Table of Contents

 

such leases was recognized in the period in which such lease was placed in service, rather than in the period in which the rental payment was received, due to the characterization of these leases under U.S. GAAP. 

(10)

Represents an indemnity payment from SunPower related to the shortfall in the reimbursable network upgrade costs related to the Quinto Project, which is owed to OpCo in accordance with the Amended and Restated Omnibus Agreement. Please read Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 12. Related Parties”.

(11)

Test electricity generation represents the sale of electricity that was generated prior to COD by the Kingbird Project. Solar systems may begin generating electricity prior to COD as a result of the installation and interconnection of individual solar modules, which occurs over time during the construction and commission period. The sale of test electricity generation is accounted for as a reduction in the asset carrying value rather than operating revenue prior to COD, even though it generates cash for the related Project Entity.

 

Items Affecting the Comparability of Our Financial Results

Our future results of operations will not be comparable to our historical results of operations for the reasons described below.

Formation Transactions. At the closing of our IPO, we acquired the IPO First Solar Project Entities, which were not included in the results of the Predecessor. Our unaudited condensed consolidated financial statements include the financial condition and results of operations of the IPO First Solar Project Entities since June 24, 2015, the date we completed our IPO. Results of operations of the Predecessor mainly relate to our Residential Portfolio, which represents less than 10% of the assets in our Portfolio. Prior to the IPO on June 24, 2015, none of the Predecessor’s Utility and C&I Projects had commenced operation and the First Solar Projects were not included in the Predecessor’s results of operations.

Selling, General and Administrative Expense.    The Predecessor’s historical combined carve-out financial statements included SG&A expenses that have historically included direct charges for certain overhead and shared services expenses allocated by SunPower. Allocations for SG&A services included such items as information technology, legal, human resources and other financial and administrative services. These expenses were charged or allocated to the Predecessor based on management’s estimate of proportional use. Under the Management Services Agreements, which were amended in August 2015, we pay annual fees of $1.7 million to our Sponsors for general and administrative services. These annual management fees are subject to annual adjustment to reflect the cost to provide SG&A services to us. In addition, our SG&A expenses also include the fees we pay to our Sponsors pursuant to AMAs.

Accounting for Joint Ventures.    The Predecessor’s historical combined carve-out financial statements do not include equity in earnings from any minority-owned joint ventures. As of May 31, 2016, OpCo owned a 49% interest in the Solar Gen 2 Project, the North Star Project and the Lost Hills Blackwell Project; however, as these interests were previously owned by First Solar, they are not included in the Predecessor’s combined carve-out financial statements. The results of operations of joint ventures in which OpCo owns a meaningful noncontrolling interest are not consolidated in our unaudited condensed consolidated financial statements and instead are represented as earnings from equity investments.

Financing.    The Predecessor’s historical combined carve-out financial statements reflect indebtedness for the Quinto Project, which was paid off in connection with the closing of our IPO, and two residential financing agreements with third-party investors, both of which have been terminated. On June 5, 2015, OpCo entered into a $525.0 million senior secured credit facility, consisting of a $300.0 million term loan facility, a $25.0 million delayed draw term loan facility and a $200.0 million revolving credit facility. As of November 30, 2015, the full amount of the $300.0 million term loan facility and approximately $48.8 million of letters of credit under our revolving credit facility were outstanding. We used the proceeds of the $300.0 million term loan facility to pay distributions to our Sponsors. On March 30, 2016, in connection with the Kingbird Acquisition and the Hooper Acquisition, OpCo drew down $40.0 million from its revolving credit facility and $25.0 million from its delayed draw term loan facility. As of May 31, 2016, the full amount of the $300.0 million borrowed under the term loan facility, the full amount of the $25.0 million borrowed under the delayed draw term loan facility, $40.0 million borrowed under the revolving credit facility, and approximately $58.6 million of letters of credit under the revolving credit facility were outstanding. The remaining portion of the revolving credit facility was undrawn.

Expiration of Section 1603 Cash Grant Program.    The Predecessor’s combined carve-out financial statements reflect the effect of the federal Section 1603 cash grant program. This program has expired and we no longer benefit from these cash grants.

Maryland Solar Lease Arrangement.    The Maryland Solar Project Entity has leased the Maryland Solar Project to an affiliate of First Solar, with the lease term expiring on December 31, 2019. Under the arrangement, First Solar’s affiliate is obligated to pay a fixed amount of rent that is set based on the expected operations of the plant.

 

42


Table of Contents

 

Change in Fiscal Year.    On June 24, 2015, in connection with the closing of the IPO, the Partnership amended the Partnership Agreement to include a change in the fiscal year to November 30. The second quarter of the Partnership’s fiscal 2016 includes the period from March 1, 2016 to May 31, 2016, consistent with the Partnership’s November 30 fiscal year end. The Predecessor had a 52-to-53 week fiscal year that ended on the Sunday closest to December 31. The corresponding second quarter of fiscal 2015 includes the Predecessor’s period from March 30, 2015 to June 28, 2015 and is comprised of 13 weeks. 

The accompanying unaudited condensed consolidated financial statements cover the period from December 1, 2015 to May 31, 2016, representing the first six-month period of the Partnership’s fiscal year 2016. The prior year’s comparable six-month period covers the period from December 29, 2014 through June 28, 2015 and is reported on the basis of the previous fiscal year end of the Partnership’s Predecessor. As a result of the change in the Partnership’s fiscal year end, the quarterly periods of its newly adopted fiscal year do not coincide with the historical quarterly periods previously reported by its Predecessor. Financial information for the three and six months ended May 31, 2015 has not been included in this Quarterly Report on Form 10-Q for the following reasons: (i) the three and six months ended June 28, 2015 provide as meaningful a comparison to the three and six months ended May 31, 2016 as would the three and six months ended May 31, 2015; (ii) the Partnership believes that there are no significant factors, seasonal or otherwise, that would impact the comparability of information if the results for the three and six months ended May 31, 2015 were presented in lieu of results for the three and six months ended June 28, 2015; and (iii) it was not practicable or cost justified to prepare this information.

Significant Factors and Trends Affecting Our Business

The assets in our Portfolio sell substantially all of their output or are leased pursuant to long-term, fixed price offtake agreements. We believe these long-term agreements substantially mitigate volatility in our cash flows. Over time, our results of operations and our ability to grow our business could be impacted by a number of factors and trends that affect our industry generally, including the development of our ROFO Projects and the other projects we may acquire in the future.

Increasing Demand for Solar Energy

Global energy demand is increasing due to economic development and population growth. The U.S. Energy Information Administration projects OECD electricity generation to increase 34% between 2014 and 2040, requiring an increase in capacity of more than 600 GW of electricity generation, including through solar energy projects. With exposure to volatile fossil fuel costs, increasing concern about carbon emissions and a variety of other factors, customers are seeking alternatives to traditional sources of electricity generation. We expect the coal and nuclear energy segments will continue to face regulatory and economic headwinds. As a form of electricity generation that is not dependent on fossil fuels, does not produce greenhouse gas emissions and whose costs are falling, solar energy is well-positioned to continue to capture an increasing share of this new build capacity. We believe we are well-positioned to benefit from this increased demand for solar energy.

Government Incentives

Our Sponsors benefit from certain U.S. government incentives designed to promote the development and use of solar energy. These incentives include accelerated tax depreciation, investment tax credits (“ITCs”), Renewable Portfolio Standards (“RPS”) programs and net metering policies. These incentives make the development of solar energy projects more competitive by providing tax credits and accelerated depreciation for a portion of the development and construction costs, decreasing the costs associated with developing and building such projects. In addition, these incentives create demand for renewable energy assets through RPS programs and the reduction or removal of these incentives may diminish the market for future solar energy offtake agreements and reduce the ability for solar developers to compete for future solar energy offtake agreements. A loss or reduction in such incentives could decrease the attractiveness of solar energy projects to developers, including our Sponsors, which could reduce our acquisition opportunities. For example, the ITC, a federal income tax credit for 30% of eligible basis, is scheduled to fall to 26% of eligible basis for solar projects that commence construction during 2020, 22% of eligible basis for solar projects that commence construction during 2021, and 10% of eligible basis for solar projects that commence construction during 2022 or thereafter or are placed into service on or after January 1, 2024. For more information about the risks associated with these government incentives, please read Part I, Item 1A. “Risk Factors—Government regulations providing incentives and subsidies for solar energy could change at any time and such changes may negatively impact our growth strategy” in the 2015 10-K.

The projects in our Portfolio are generally unaffected by the trends discussed above, given that all of the electricity to be generated by our projects are sold under fixed-price offtake agreements, which, as of May 31, 2016, have a weighted average remaining life of approximately 20.8 years. In addition, our near-term growth strategy is also largely insulated from the trends discussed above. We expect that most of our short-term growth will come from opportunities to acquire the ROFO Projects, all of which will have executed power sale agreements.

 

43


Table of Contents

 

Critical Accounting Policies & Estimates

The preparation of financial statements in conformity with accounting principles generally accepted in the United States requires us to make estimates and assumptions in certain circumstances that affect amounts reported in our unaudited condensed consolidated financial statements and related footnotes. In preparing these unaudited condensed consolidated financial statements, we have made our best estimates of certain amounts included in the unaudited condensed consolidated financial statements. Application of accounting policies and estimates, however, involves the exercise of judgment and use of assumptions as to future uncertainties and, as a result, actual results could differ from these estimates. In arriving at our critical accounting estimates, factors we consider include how accurate the estimate or assumptions have been in the past, how much the estimate or assumptions have changed and how reasonably likely such change may have a material impact. Our critical accounting policies and estimates are more fully described in Note 1 of the unaudited condensed consolidated financial statements. There have been no significant changes to our critical accounting policies and estimates since November 30, 2015.

Results of Operations

 

 

 

Three Months Ended

 

 

Six Months Ended

 

 

 

(unaudited)

 

 

(unaudited)

 

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

 

 

2016

 

 

2015

 

 

2016

 

 

2015

 

Revenues:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating revenues

 

$

13,517

 

 

$

2,179

 

 

$

20,619

 

 

$

4,313

 

Total revenues

 

 

13,517

 

 

 

2,179

 

 

 

20,619

 

 

 

4,313

 

Operating costs and expenses:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cost of operations

 

 

1,759

 

 

 

252

 

 

 

3,025

 

 

 

2,310

 

Cost of operations—SunPower, prior to IPO

 

 

 

 

 

234

 

 

 

 

 

 

468

 

Selling, general and administrative

 

 

1,656

 

 

 

4,519

 

 

 

3,292

 

 

 

7,798

 

Depreciation, amortization and accretion

 

 

5,388

 

 

 

748

 

 

 

10,014

 

 

 

1,478

 

Acquisition-related transaction costs

 

 

829

 

 

 

 

 

 

1,662

 

 

 

 

Total operating costs and expenses

 

 

9,632

 

 

 

5,753

 

 

 

17,993

 

 

 

12,054

 

Operating income (loss)

 

 

3,885

 

 

 

(3,574

)

 

 

2,626

 

 

 

(7,741

)

Other expense (income):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interest expense

 

 

3,051

 

 

 

480

 

 

 

5,924

 

 

 

1,526

 

Interest income

 

 

(328

)

 

 

(1,064

)

 

 

(613

)

 

 

(1,064

)

Other expense (income)

 

 

(334

)

 

 

7,977

 

 

 

(260

)

 

 

11,925

 

Total other expense, net

 

 

2,389

 

 

 

7,393

 

 

 

5,051

 

 

 

12,387

 

Income (loss) before income taxes

 

 

1,496

 

 

 

(10,967

)

 

 

(2,425

)

 

 

(20,128

)

Income tax provision

 

 

(6,681

)

 

 

(103

)

 

 

(10,218

)

 

 

(109

)

Equity in earnings of unconsolidated investees

 

 

5,024

 

 

 

218

 

 

 

5,429

 

 

 

218

 

Net loss

 

 

(161

)

 

 

(10,852

)

 

 

(7,214

)

 

 

(20,019

)

Less: Predecessor loss prior to IPO on June 24, 2015

 

 

 

 

 

(10,928

)

 

 

 

 

 

(20,095

)

    Net income (loss) subsequent to IPO

 

 

(161

)

 

 

76

 

 

 

(7,214

)

 

 

76

 

Less: Net loss attributable to noncontrolling interests and

   redeemable noncontrolling interests

 

 

(10,183

)

 

 

(69

)

 

 

(22,544

)

 

 

(69

)

Net income attributable to 8point3 Energy Partners LP

   Class A shares

 

$

10,022

 

 

$

145

 

 

$

15,330

 

 

$

145

 

 

Three and Six Months Ended May 31, 2016 Compared to Three and Six Months Ended June 28, 2015

Revenues

 

 

Three Months Ended

 

 

Six Months Ended

 

 

(unaudited)

 

 

(unaudited)

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

2016

 

 

2015

 

 

2016

 

 

2015

 

Operating revenues

$

13,517

 

 

$

2,179

 

 

$

20,619

 

 

$

4,313

 

Total revenues

$

13,517

 

 

$

2,179

 

 

$

20,619

 

 

$

4,313

 

 

44


Table of Contents

 

 

Operating revenues for both the three and six months ended May 31, 2016 and June 28, 2015 were comprised of power purchase revenue from our utility-scale and C&I assets and lease revenues from our solar energy system lease arrangements. All revenues for the period were generated in the United States in each of the three and six months ended May 31, 2016 and June 28, 2015.

 

Residential systems are leased under lease agreements which are classified for accounting purposes either as sales-type leases or operating leases. As all the leases owned by the Predecessor have been placed into service prior to fiscal 2015, all revenue related to the net present value of the minimum lease payments for sales-type leases has been recognized as of December 28, 2014. Accordingly, other than interest revenue, we had no sales-type lease revenue on our unaudited condensed consolidated financial statements for each of the three and six months ended May 31, 2016 and June 28, 2015.

For those residential leases classified as sales-type leases, the net present value of the minimum lease payments, net of executory costs, is recognized as revenue when the leased asset is placed in service. Executory costs represent estimated lease operation and maintenance costs, including insurance, to be paid by the lessor, including any profit thereon. This net present value is inclusive of certain fixed and determinable state or local rebates, described below, defined in the lease document as part of minimum lease payments. The difference between the net amount and the gross amount of a sales-type lease is amortized as revenue over the lease term using the interest method. Revenue from executory costs is recognized on a straight-line basis over the lease terms, almost all of which are 20 years.

For those residential leases classified as operating leases, revenue associated with renting the solar energy system and related executory costs are recognized on a straight-line basis over the lease terms, almost all of which are 20 years. We do not record certain fixed and determinable state or local rebates. Previously, certain of these fixed and determinable state or local rebates, described below, defined in the lease document as part of minimum lease payments, were recorded as deferred revenue in the Predecessor’s balance sheets when the lease was placed in service and amortized to revenue on a straight-line basis over the lease term.

State or local rebates that are fixed and determinable are recognized when the related solar energy system is placed in service. State or local rebates that are not fixed and determinable, since they relate to the generation of electricity from the leased solar energy system, are recognized as revenue upon cash receipt for both sales-type leases and operating leases.

 

Total revenues increased by $11.3 million, or 520%, during the three months ended May 31, 2016 as compared to the three months ended June 28, 2015, and increased by $16.3 million, or 378%, during the six months ended May 31, 2016 as compared to the six months ended June 28, 2015, due to the commencement of operations of the IPO Project Entities as of the fourth quarter of fiscal 2015 and revenues generated from the Kingbird Project and the Hooper Project acquired in the second quarter of fiscal 2016.

 

Operating Costs and Expenses

 

 

Three Months Ended

 

 

Six Months Ended

 

 

(unaudited)

 

 

(unaudited)

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

2016

 

 

2015

 

 

2016

 

 

2015

 

Cost of operations

$

1,759

 

 

$

252

 

 

$

3,025

 

 

$

2,310

 

Cost of operations—SunPower, prior to IPO

 

 

 

 

234

 

 

 

 

 

 

468

 

Selling, general and administrative

 

1,656

 

 

 

4,519

 

 

 

3,292

 

 

 

7,798

 

Depreciation, amortization and accretion

 

5,388

 

 

 

748

 

 

 

10,014

 

 

 

1,478

 

Acquisition-related transaction costs

 

829

 

 

 

 

 

 

1,662

 

 

 

 

Total operating costs and expenses

$

9,632

 

 

$

5,753

 

 

$

17,993

 

 

$

12,054

 

Total operating costs and expenses as a percentage

   of revenues

 

71.3

%

 

 

264.0

%

 

 

87.3

%

 

 

279.5

%

 

Cost of Operations: Cost of operations primarily includes expenses related to O&M agreements and land lease expenses post IPO. The Predecessor’s cost of operations additionally includes costs related to system output performance warranty and residential lease system repairs accrual and reserves for upfront rebate receivables.

 

 

45


Table of Contents

 

The increase of $1.5 million, or 598%, for the three months ended May 31, 2016 as compared to the three months ended June 28, 2015 is primarily driven by: (i) increased expenses for O&M, electricity and property insurance associated with operating the solar power systems due to the commencement of operations of the IPO Project Entities in the fourth quarter of fiscal 2015 and the Kingbird Project and the Hooper Project acquired in the second quarter of fiscal 2016; and (ii) the reclassification of Quinto land lease expense from SG&A expense by the Predecessor prior to IPO to cost of operations post-IPO.

 

The increase of $0.7 million, or 31%, for the six months ended May 31, 2016 as compared to the six months ended June 28, 2015 is primarily driven by increased expenses associated with operating the solar power systems due to the commencement of operations of the IPO Project Entities in the fourth quarter of fiscal 2015 and the Kingbird Project and the Hooper Project acquired in the second quarter of fiscal 2016. These increases were partially offset by the Predecessor’s expenses during the first quarter of 2015 that were not recorded in 2016, relating to (i) a $1.3 million reserve for aged rebates receivable; (ii) a $0.5 million accrual for system output performance warranty and residential lease system repairs; and (iii) a $0.2 million accrual for a performance guarantee settlement.  

 

Cost of Operations—SunPower, prior to IPO: Cost of operations—SunPower, prior to IPO, represents executory costs that were allocated to the Predecessor by SunPower. Costs incurred for these services were zero for both the three and six months ended May 31, 2016 compared to $0.2 million and $0.5 million for the three and six months ended June 28, 2015, respectively.  

Selling, General and Administrative: SG&A expense includes (i) post-IPO operating expenses such as audit, legal, insurance, independent board of directors and fees under the AMAs and MSAs with our Sponsors; (ii) charges that were incurred by SunPower that were specifically identified as attributable to the Predecessor; and (iii) an allocation of SunPower operating expenses based on the proportional level of effort attributable to the operation of the Predecessor’s portfolio of solar energy systems leased to residential homeowners and solar energy projects under construction. The allocated SunPower operating expenses include asset management, legal, accounting, tax, treasury, information technology, insurance, employee benefit costs, human resources, procurement, and other corporate services and infrastructure costs.

The decrease of $2.9 million, or 63%, for the three months ended May 31, 2016 as compared to the three months ended June 28, 2015 was due to high SG&A expenses in the three months ended June 28, 2015 of $4.5 million primarily driven by the allocation of $3.8 million of costs incurred by SunPower related to our IPO, as well as $0.5 million of Quinto land lease expenses, while the SG&A expense of $1.7 million for the three months ended May 31, 2016 was mainly comprised of normal operating expenditures including: (i) $0.8 million of fees associated with audit, consulting, legal, insurance and independent board of director services; (ii) $0.8 million of MSA and AMA fees; and (iii) $0.1 million of bad debt expense related to residential lease customers.

The decrease of $4.5 million, or 58%, for the six months ended May 31, 2016 as compared to the six months ended June 28, 2015 was due to high SG&A expenses in the six months ended June 28, 2015 of $7.8 million primarily driven by the allocation of $6.3 million of costs incurred by SunPower related to our IPO, as well as $0.9 million of Quinto land lease expenses, while the SG&A expense of $3.3 million for the six months ended May 31, 2016 was mainly comprised of normal operating expenditures including: (i) $1.6 million of fees associated with audit, consulting, legal, insurance and independent board of director services; (ii) $1.5 million of MSA and AMA fees; and (iii) $0.2 million of bad debt expense related to residential lease customers.

Depreciation: Depreciation expense reflects costs associated with depreciation of our solar power system assets that have been placed in service.

The increase of $4.6 million, or 620%, for the three months ended May 31, 2016 as compared to the three months ended June 28, 2015, and the increase of $8.5 million, or 578%, for the six months ended May 31, 2016 as compared to the six months ended June 28, 2015, is a result of the commencement of operations of the IPO Project Entities in the fourth quarter of fiscal 2015 and the Kingbird Project and the Hooper Project in the second quarter of fiscal 2016.

Acquisition-Related Transaction Costs: Acquisition-related transactions costs represent legal and consulting fees incurred in connection with the Kern Phase 1(a) Acquisition in January 2016, the Kingbird Acquisition in March 2016 and the Hooper Acquisition in April 2016.

 

46


Table of Contents

 

Other Expense, net

 

 

Three Months Ended

 

 

Six Months Ended

 

 

(unaudited)

 

 

(unaudited)

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

2016

 

 

2015

 

 

2016

 

 

2015

 

Interest expense

$

3,051

 

 

$

480

 

 

$

5,924

 

 

$

1,526

 

Interest income

 

(328

)

 

 

(1,064

)

 

 

(613

)

 

 

(1,064

)

Other expense (income)

 

(334

)

 

 

7,977

 

 

 

(260

)

 

 

11,925

 

Total other expense, net

$

2,389

 

 

$

7,393

 

 

$

5,051

 

 

$

12,387

 

Total other expense, net as a percentage of revenues

 

17.7

%

 

 

339.3

%

 

 

24.5

%

 

 

287.2

%

 

Interest Expense: On June 5, 2015, we entered into a $525.0 million senior secured credit facility, consisting of a $300.0 million term loan facility, a $25.0 million delayed draw term loan facility and a $200.0 million revolving credit facility. We borrowed $300.0 million under the term loan facility on June 5, 2015 to pay distributions to our Sponsors. On March 30, 2016, we drew down $40.0 million from our revolving credit facility and $25.0 million from our delayed draw term loan facility to pay for the Kingbird Acquisition and the Hooper Acquisition. Loans outstanding under the senior secured credit facility bear interest and the unused portion of the revolving credit facility and delayed draw term loan facility bear commitment fees which are cash interest expenses. Please read Part I, Item 1. “Financial Information—Notes to Unaudited Condensed Consolidated Financial Statements—Note 7— Debt and Financing Obligations” for rates. The debt discount and incremental debt issuance costs associated with these borrowings are non-cash interest expenses. The interest incurred related to our projects that are under construction is not reflected as an expense in the unaudited condensed consolidated statements of operations as it is capitalized to construction-in-progress until the solar energy system is ready for its intended use.

Cash interest expense in the first half of fiscal 2016 relates to the term loan facility, delayed draw term loan facility, revolver fees and letter of credit fees. Cash interest expense in the first half of fiscal 2015 relates to the term loan facility and letter of credit fees as well as financing fees due to two third-party investors for undrawn commitment of the financing arrangements described below. Non-cash interest expense in the first half of fiscal 2016 relates to debt issuance costs associated with our term loan facility, delayed draw term loan facility and revolver. Non-cash interest expense in the first half of fiscal 2015 relates to our term loan facility and two financing arrangements under which leased solar energy systems were financed by two third-party investors.

The Predecessor terminated one residential lease financing obligation in January 2015 and the remaining obligation in May 2015. Under the terms of these financing arrangements, the investors provided upfront payments to the Predecessor, for which the Predecessor recognized as a financing obligation that was reduced over the specified term of the arrangement as customer receivables and federal cash grants were received by the third-party investors. Non-cash interest expense was recognized on the unaudited condensed consolidated statement of operations using the effective interest rate method calculated at a rate of approximately 14-15% during the first half of fiscal 2015.

Interest expense for the three and six months ended May 31, 2016 included non-cash interest expense of less than $0.1 million and $0.1 million, respectively, and cash interest expense of $3.0 million and $5.8 million, respectively. Interest expense for the three and six months ended June 28, 2015 included non-cash interest expense of $0.3 million and $1.2 million, respectively, and cash interest expense of $0.2 million and $0.3 million, respectively.

Interest Income:  Interest income was $0.3 million and $0.6 million for the three and six months ended May 31, 2016, respectively. Interest income was $1.1 million in both the three and six months ended June 28, 2015. Interest income represents the accrued interest on reimbursable network upgrade costs related to the Quinto Project and the Kingbird Project. These costs plus accrued interest are reimbursable by the utility company over five years when the projects achieve commercial operation.

Other Expense (Income): Other expense (income) in both the three and six months ended May 31, 2016 relates to an unrealized gain on interest rate swap associated with our term loan facility of $0.3 million further described below.  Other expense (income) of $8.0 million and $11.9 million in the three and six months ended June 28, 2015, respectively, relates to a loss on cash flow hedges associated with the Predecessor as well as a loss on termination of financing obligations further described below.

Gain on interest rate swap associated with term loan facility: On July 17, 2015, we entered into interest rate swap agreements to economically hedge the cash flows on our term loan facility. The changes in fair value are recorded in other expense (income), net in the unaudited condensed consolidated statement of operations as these hedges are not accounted for under hedge accounting. During

 

47


Table of Contents

 

each of the three and six months ended May 31, 2016, we recorded an unrealized gain of $0.3 million for the mark-to-market valuation adjustment of interest rate swap agreements.

Loss on cash flow hedges associated with Predecessor: The Predecessor entered into interest rate swap agreements, designated as cash flow hedges, in the fourth quarter of the year ended December 28, 2014 on borrowings in connection with the construction of the Quinto Project to reduce the impact of changes in interest rates. The Predecessor assessed the effectiveness of these cash flow hedges at inception and on a quarterly basis. If it was determined that a derivative instrument was not highly effective or the transaction was no longer deemed probable of occurring, the Predecessor discontinued hedge accounting and recognized the ineffective portion in current period earnings. The hedge became ineffective in the quarter ended March 29, 2015, and the ineffective portion was recognized in earnings at that time. The interest swap was terminated upon the IPO and the remaining ineffective portion was recognized in earnings during the quarter ended June 28, 2015. During the three and six months ended June 28, 2015, $2.2 million and $5.4 million, respectively, was reclassified into loss on cash flow hedges within other expense (income), net in the unaudited condensed consolidated statements of operations.

Loss on termination of financing obligation: On January 30, 2015, the Predecessor entered into an agreement with one of the residential lease financing third-party investors that terminated the financing obligation arrangement. In conjunction with the termination of the arrangement, the Predecessor paid $10.8 million to terminate the $10.1 million outstanding financing obligation. On May 4, 2015, the Predecessor entered into a termination agreement with the remaining third-party investor, paying $29.0 million to terminate the $21.1 million outstanding financing obligation. During the three and six months ended June 28, 2015, $5.8 million and $6.5 million, respectively, was recognized as a loss on termination within other expense (income), net in the unaudited condensed consolidated statements of operations.

Income Tax Provision

 

 

Three Months Ended

 

 

Six Months Ended

 

 

(unaudited)

 

 

(unaudited)

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

2016

 

 

2015

 

 

2016

 

 

2015

 

Income tax provision

$

6,681

 

 

$

103

 

 

$

10,218

 

 

$

109

 

Income tax provision as a percentage of revenues

 

49.4

%

 

 

4.7

%

 

 

49.6

%

 

 

2.5

%

 

Our tax rate is primarily affected by the tax impact of equity in earnings, the tax impact of noncontrolling interest, and state tax rates (net of federal benefit) in various jurisdictions, most significantly California. We included the income tax provision related to our equity in earnings of unconsolidated investees in the income tax provision line of the unaudited condensed consolidated statements of operations.

Our income tax provision post IPO primarily represents deferred federal and state taxes on the net income of OpCo that is allocated to the Partnership (exclusive of income tax but after noncontrolling interest). The Predecessor’s income tax provision, which was calculated on a separate return basis for the carve-out period, was due to minimum state income taxes. The increase in income tax provision as a percentage of revenues for the three months ended May 31, 2016 of 49.4% compared to 4.7% for the three months ended June 28, 2015 is the result of an increase in equity in earnings of unconsolidated affiliates as well as income before income taxes for the three months ended May 31, 2016 of $1.5 million compared to losses before income taxes of $11.0 million for the three months ended June 28, 2015.

The increase in income tax provision as a percentage of revenues for the six months ended May 31, 2016 of 49.6% compared to 2.5% for the six months ended June 28, 2015 is the result of an increase in equity in earnings of unconsolidated affiliates as well as lower losses before income taxes for the six months ended May 31, 2016 of $2.4 million compared to losses before income taxes of $20.1 million for the six months ended June 28, 2015.

Equity in Earnings of Unconsolidated Investees

 

Three Months Ended

 

 

Six Months Ended

 

 

(unaudited)

 

 

(unaudited)

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

2016

 

 

2015

 

 

2016

 

 

2015

 

Equity in earnings of unconsolidated investees

$

5,024

 

 

$

218

 

 

$

5,429

 

 

$

218

 

Equity in earnings of unconsolidated investees as a

   percentage of revenues

 

37.2

%

 

 

10.0

%

 

 

26.3

%

 

 

5.1

%

 

48


Table of Contents

 

 

Equity in earnings of unconsolidated investees represents our proportionate share of the earnings and losses from SG2 Holdings, North Star Holdings and Lost Hills Blackwell Holdings. We own a 49% ownership interest in each of SG2 Holdings, North Star Holdings and Lost Hills Blackwell Holdings, and an affiliate of Southern Company, which is not affiliated with us, owns the other 51% ownership interest. The minority membership interests are accounted for as equity method investments.

 

During the three and six months ended May 31, 2016, we recognized equity in earnings of $5.0 million and $5.4 million, respectively, which represented the entire three and six month periods in the first half fiscal year 2016. During both the three and six months ended June 28, 2015, we recognized equity in earnings of $0.2 million, which represented the four-day-period after IPO in the second quarter of fiscal year 2015.

 

Net Loss Attributable to Noncontrolling Interests and Redeemable Noncontrolling Interests

 

 

Three Months Ended

 

 

Six Months Ended

 

 

(unaudited)

 

 

(unaudited)

 

 

May 31,

 

 

June 28,

 

 

May 31,

 

 

June 28,

 

(in thousands)

2016

 

 

2015

 

 

2016

 

 

2015

 

Net loss attributable to noncontrolling interests

   and redeemable noncontrolling interests

$

(10,183

)

 

$

(69

)

 

$

(22,544

)

 

$

(69

)

Net loss attributable to noncontrolling interests

   and redeemable noncontrolling interests as a

   percentage of net revenues

 

(75.3

)%

 

 

(3.2

)%

 

 

(109.3

)%

 

 

(1.6

)%

 

Net loss attributable to noncontrolling interests and redeemable noncontrolling interests for the three and six months ended May 31, 2016 included a net loss of $52.9 million and $87.8 million, respectively, attributable to noncontrolling interests and redeemable noncontrolling interests related to our tax equity financing facilities with third-party investors under which the parties invest in entities that hold the solar power systems, partially offset by net income of $42.7 million and $65.3 million, respectively, attributable to our Sponsors as a result of their economic ownership in OpCo.

 

Net loss attributable to noncontrolling interests and redeemable noncontrolling interests in both the three and six months ended June 28, 2015 included a net loss of $0.7 million, attributable to noncontrolling interests and redeemable noncontrolling interests related to our tax equity financing facilities with third-party investors under which the parties invest in entities that hold the solar power systems, partially offset by net income of $0.6 million attributable to our Sponsors as a result of their economic ownership in OpCo.

 

We apply the Hypothetical Liquidation at Book Value (“HLBV”) Method in allocating recorded net loss to each tax equity investor based on the change during the reporting period of the amount of net assets of the entity to which each tax equity investor would be entitled under the governing contractual arrangements in a liquidation scenario.

Cash Flows

Six Months Ended May 31, 2016 Compared to Six Months Ended June 28, 2015

A summary of the sources and uses of cash and cash equivalents is as follows:

 

 

Six Months Ended

 

 

(unaudited)

 

 

May 31,

 

 

June 28,

 

(in thousands)

2016

 

 

2015

 

Net cash provided by (used in) operating activities

$

13,627

 

 

$

(9,333

)

Net cash used in investing activities

 

(115,638

)

 

 

(224,018

)

Net cash provided by financing activities

 

65,225

 

 

 

271,245

 

 

Operating Activities

 

 

49


Table of Contents

 

Net cash provided by operating activities for the six months ended May 31, 2016 was $13.6 million and was primarily the result of: (i) $7.7 million in cash distributions received from equity method investees that were classified in operating activities as returns on the investments; (ii) adjustments for non-cash charges of $20.8 million, including $10.0 million depreciation of operating lease assets and solar energy systems, $10.2 million deferred income taxes expense, $0.1 million share-based compensation, $0.3 million amortization of debt issuance costs, and $0.2 million bad debt expense related to residential lease customers; and (iii) $1.0 million increase in accounts payable and other accrued liabilities. These inflows were partially offset by: (i) net loss of $7.2 million; (ii) adjustments for non-cash income of $5.7 million, including $5.4 million equity in earnings of unconsolidated investees and $0.3 million mark-to-market gain on interest rate swap; (iii) $2.4 million increase in accounts receivable and short-term financing receivables, net; (iv) $0.5 million increase in prepaid expenses and other current assets; and (iv) $0.1 million decrease in deferred revenue on operating leases.

 

Net cash used in operating activities for the six months ended June 28, 2015 was $9.3 million and was primarily the result of: (i) a net loss of $20.0 million; (ii) $3.6 million increase in prepaid and other current assets related to capitalized expenses incurred by the Predecessor for our IPO; and (iii) $0.5 million decrease in deferred revenue on operating leases. Net cash used was partially offset by: (i) net non-cash charges of $13.7 million, including $3.2 million mark-to-market loss on cash flow hedges, $6.5 million loss upon termination of residential financing arrangement, $1.5 million depreciation of operating lease assets, $1.3 million reserve for rebates receivable, and $1.2 million interest expense for the financing arrangement of residential leased solar energy systems prior to termination; and (ii) $1.3 million increase in accounts payable and other accrued liabilities.

 

Investing Activities

 

Net cash used in investing activities for the six months ended May 31, 2016 was $115.6 million and was primarily the result of $118.0 million net cash paid for the acquisitions of the Kern Phase 1(a) Assets, the Kingbird Project and the Hooper Project. These outflows were partially offset by $1.2 million of cash distributions from unconsolidated investees classified in investing activities as returns of the investments, and $1.1 million of net cash provided by purchases of property and equipment, which primarily consists of collections of test energy billings.

 

Net cash used in investing activities for the six months ended June 28, 2015 was $224.0 million related to costs incurred by the Predecessor associated with solar energy projects under construction.

 

Financing Activities

 

Net cash provided by financing activities for the six months ended May 31, 2016 was $65.2 million and was primarily the result of: (i) $65.0 million proceeds from issuance of bank loans, net of issuance costs, including $40.0 million from the revolving credit facility and $25.0 million from the delayed draw term loan facility; (ii) $10.0 million in capital contributions from SunPower as an indemnity per the Amended and Restated Omnibus Agreement for a short-fall associated with reimbursable costs for the Quinto Project network upgrade; and (iii) $0.4 million of cash contributions from tax equity investors. These cash inflows were partially offset by: (i) $8.8 million of cash distributions to our Class A members; and (ii) $1.3 million of cash distributions to tax equity investors.

 

Net cash provided by financing activities for the six months ended June 28, 2015 was $271.2 million due to: (i) $393.8 million in proceeds from issuance of Class A shares, net of issuance costs; (ii) $461.2 million in proceeds from issuance of bank loans, net of issuance costs from our term loan facility as well as a financing arrangement for the Quinto Project; (iii) $337.8 million in capital contributions from SunPower to fund the SunPower Project Entities before the IPO; and (iv) $1.0 million in cash contributions from noncontrolling interests associated with our tax equity financing arrangements. These cash inflows were partially offset by: (i) $371.5 million of cash distribution to SunPower as a Sponsor in connection with the IPO; (ii) $283.7 million of cash distribution to First Solar as a Sponsor in connection with the IPO; and (iii) $264.1 million repayment of bank loans to terminate two residential lease financing arrangements prior to the IPO and the Quinto Project at the IPO closing; and (vi) $3.2 million of capital distributions to SunPower made by the Predecessor before the IPO.

 

Liquidity and Capital Resources

 

SunPower provides treasury services on the General Partner’s behalf under our MSA with an affiliate of SunPower. Our liquidity as of May 31, 2016 was $121.4 million consisting of $20.0 million cash on hand and $101.4 million of available capacity under our five-year revolving credit facility. Our liquidity position excludes up to $250.0 million in an accordion feature under our existing credit facility.

 

50


Table of Contents

 

 

Sources of Liquidity

 

We expect our ongoing sources of liquidity to include cash on hand, cash generated from operations (excluding cash distributions to minority investors), distributions and dividends from the operations of our equity investments, borrowings under new and existing financing arrangements (the aggregate amount of which may be lower because of our reduced ownership in projects subject to tax equity financing) and the issuance of additional equity securities as appropriate given market conditions. We may also incur debt at the project level, which may be limited by the rights of our tax equity investors. We expect that these sources of funds will be adequate to provide for our short-term and long-term liquidity needs. Our ability to meet our debt service obligations and other capital requirements, including capital expenditures, as well as make acquisitions, will depend on our future operating performance which, in turn, will be subject to general economic, financial, business, competitive, legislative, regulatory and other conditions, many of which are beyond our control.

We believe that we will have sufficient borrowings available under our revolving credit facility, liquid assets and cash flows from operations to meet our financial commitments, debt service obligations, contingencies and anticipated required capital expenditures for at least the next 12 months.

Term Loan, Delayed Draw Term Loan and Revolving Credit Facility

 

On June 5, 2015, OpCo entered into a $525.0 million senior secured credit facility, consisting of a $300.0 million term loan facility, a $25.0 million delayed draw term loan facility and a $200.0 million revolving credit facility. The delayed draw term loan facility was available to us during the 12-month period following the closing of our IPO. Subject to certain conditions, the credit facility includes conditional borrowing capacity for incremental commitments to increase the term loan facility and revolving credit facility by $250.0 million, with any increase in the revolving facility not to exceed $100.0 million. The proceeds of the term loan facility were used to pay fees and expenses, to repay existing indebtedness, to make a distribution to the Sponsors and for general purposes, including to fund acquisition opportunities, while the proceeds of the delayed draw term loan facility are expected to be used for acquisitions. Amounts available under the revolving facility are expected to be used for capital expenditures, acquisitions and other investments, to provide for ongoing working capital requirements, and for general corporate purposes, with letters of credit issued thereunder to be used for credit support and general corporate purposes. The credit facility will mature in June 2020, five years following the closing of our IPO.

 

As of November 30, 2015, the full amount of the $300.0 million term loan facility and approximately $48.8 million of letters of credit under the revolving credit facility were outstanding. On March 30, 2016, in connection with the Kingbird Acquisition and the Hooper Acquisition, OpCo drew down $40.0 million from its revolving credit facility and $25.0 million from its delayed draw term loan facility.  As of May 31, 2016, the full amount of the $300.0 million term loan facility, the full amount of the $25.0 million delayed draw term loan facility, $40.0 million of the revolving credit facility, and approximately $58.6 million of letters of credit under the revolving credit facility were outstanding. The remaining portion from the revolving credit facility was undrawn.  

In general, the credit facility contains representations, warranties, covenants (including financial covenants) and defaults that are customary for this type of financing; provided, however, that OpCo is permitted to pay distributions to its unitholders and we are permitted to pay distributions to our shareholders out of available cash so long as no default or event of default under the credit facility has occurred or is continuing at the time of such distribution, or would result therefrom, and OpCo is otherwise in compliance, on a pro forma basis, with the facility’s covenants requiring it to maintain its debt to cash flow ratio and debt service coverage ratio (as such financial ratios are described below). Among other things, events of defaults that could result in restrictions on our ability to make such distributions include certain failures to make payments when due under the credit facility, certain defaults under other agreements, breaches of certain covenants and representations under the credit facility, commencement of certain insolvency proceedings, the existence of certain judgments or attachments, certain orders of dissolution of loan parties, certain events relating to employee benefit plans, the occurrence of a change of control (as more fully described below), certain events relating to the effectiveness and validity of the guaranties and collateral documents in support of the credit facility (as described below) and other credit documents and, under certain circumstances, the termination of the Amended and Restated Omnibus Agreement or the Quinto PPA. Loans outstanding under the credit facility bear interest at either (i) a base rate, which is the highest of (x) the federal funds rate plus 0.50%, (y) the administrative agent’s prime rate and (z) one-month LIBOR, in each case, plus an applicable margin; or (ii) one-, two-, three- or six-month LIBOR plus an applicable margin. The unused portion of the revolving credit facility and delayed draw term loan facility is subject to a commitment fee of 0.30% per annum. OpCo may prepay the borrowings under the term loan facility and the delayed draw term loan facility at any time. In the future, we may increase our debt to fund our operations or future acquisitions.

 

51


Table of Contents

 

OpCo’s credit facility is secured by a pledge over the equity of OpCo and certain of its domestic subsidiaries. The Partnership and each of OpCo’s domestic subsidiaries, other than certain non-guarantor subsidiaries, have guaranteed the obligations of OpCo under the credit facility.

OpCo’s credit facility also contains covenants requiring us to maintain the following financial ratios beginning in the fiscal quarter ending August 31, 2015: (i) a debt to cash flow ratio (as more fully defined in the credit facility) of not more than (a) 7.00 to 1.00 for the fiscal quarters ending August 31, 2015 through May 31, 2016, (b) 5.50 to 1.00 for the fiscal quarters ending August 31, 2016 through May 31, 2017, and (c) 5.00 to 1.00 for each fiscal quarter ending thereafter; and (ii) a debt service coverage ratio (as more fully defined in the credit facility) of not less than 1.75 to 1.00. In addition, an event of default occurs under the credit facility upon a change of control. The credit facility defines a change of control as occurring when, among other things, (i) the Sponsors (or either of them) cease to direct the management, directly or indirectly, of us or OpCo, or (ii) the Sponsors collectively cease to own 35% of the economic interest in OpCo. In addition, the credit facility contains customary non-financial covenants and certain restrictions that will limit the Partnership’s, OpCo’s and certain of the Partnership’s and its domestic subsidiaries’ ability to, among other things, incur or guarantee additional debt and to make distributions on or redeem or repurchase OpCo common units. As of May 31, 2016, we were in compliance with the debt covenants.

On April 6, 2016, the parties thereto amended OpCo’s credit facility (i) to provide for the lenders’ consent to the Amended and Restated Omnibus Agreement, to expand OpCo’s ability to further amend the Amended and Restated Omnibus Agreement without lender consent in the future, subject to certain conditions, (iii) to permit certain customary restrictions on transfers of the equity interests of certain Project Entities, which are jointly owned, indirectly, by OpCo and SunPower, (iv) to supplement the Pledge and Security Agreement between the parties in light of the foregoing amendment, and (v) to make certain clarifying modifications to definitions and cross references.

Tax Equity

Our projects are, and our future acquisitions are expected to be, subject to two types of tax equity financing. In the first type of tax equity financing, the governing agreements provide, and the governing agreements of our future acquisitions may provide, our tax equity investors with a number of minority investor protection rights with respect to the applicable asset or assets that have been financed with tax equity, including restricting the ability of the entity that owns such asset or assets to incur debt. To the extent we want to incur project-level debt at a project in which we co-invest with a tax equity investor, we may be required to obtain the tax equity investor’s consent prior to such incurrence. In addition, the amount of debt that could be incurred by an entity in which we have a tax equity co-investor may be further constrained because even if the tax equity investor consents to the incurrence of the debt at the entity or project level, the tax equity investor may not agree to pledge its interest in the project which could reduce the amount that can be borrowed and raise the cost of borrowing by the entity.

In the second type of tax equity financing, the governing agreements provide, and the governing agreements of our future acquisitions may provide, our tax equity investors with a majority interest in the project. In such agreements, we will only have a number of minority investor protection rights with respect to the applicable asset or assets that have been financed with tax equity, including restricting the ability of the entity that owns such asset or assets to incur debt. In most cases, since we are not the majority owner, we will not be able to direct the actions of the entity that owns such asset. As such, we may not be able to incur debt at the entity or project level, without the consent of the majority owner.

Uses of Liquidity

Our principal requirements for liquidity and capital resources, other than for operating our business, can generally be categorized into the following: (i) debt service obligations; (ii) funding acquisitions, if any; and (iii) cash distributions to shareholders. Generally, once COD is reached, solar power generation assets do not require significant capital expenditures to maintain operating performance.

 

52


Table of Contents

 

Contractual Obligations

The following table summarizes our contractual obligations as of May 31, 2016:

 

 

 

 

 

 

 

Payments Due by Period

 

(in thousands)

 

Total

 

 

2016 (remaining six months)

 

 

2017-2018

 

 

2019-2020

 

 

Beyond 2020

 

Land use commitments (1)

 

$

64,960

 

 

$

611

 

 

$

2,622

 

 

$

3,428

 

 

$

58,299

 

Term loan (2)

 

 

338,051

 

 

 

5,147

 

 

 

20,022

 

 

 

312,882

 

 

 

 

Delayed draw term loan facility (3)

 

 

27,757

 

 

 

340

 

 

 

1,356

 

 

 

26,061

 

 

 

 

Revolving credit facility (3)

 

 

44,410

 

 

 

544

 

 

 

2,169

 

 

 

41,697

 

 

 

 

Total contractual obligations

 

$

475,178

 

 

$

6,642

 

 

$

26,169

 

 

$

384,068

 

 

$

58,299

 

 

(1)

Land use commitments are related to a non-cancellable operating lease for the Quinto Project and two operating leases for the Kingbird Project, and are equal to the minimum lease and easement payments to landowners for the right to use the land upon which solar energy systems are located.

(2)

Includes $300.0 million of borrowings outstanding under the term loan facility entered into by OpCo on June 5, 2015 (in connection with our IPO) which will mature on or about the fifth anniversary of its issuance, at which point all amounts outstanding under the term loan facility will become due. From July 17, 2015 to August 31, 2018, which is the term of the interest rate swap, the interest payments are estimated based on the fixed swap interest rate of 1.55% plus the 2% margin for the notional amount of $240.0 million. The interest payments for the remaining $60.0 million notional amount through the maturity of the term loan, and the full amount outstanding thereafter, are estimated based on the floating cash interest rate of approximately 2.67% per annum effective as of May 31, 2016.

(3)

Includes $25.0 million of borrowings outstanding under the delayed draw term loan facility and $40.0 million of borrowings outstanding under the revolving credit facility entered into by OpCo on June 5, 2015 (in connection with the Kingbird Acquisition and the Hooper Acquisition), which will mature on or about the fifth anniversary of the issuance of the term loan facility, at which point all amounts outstanding under the delayed draw term loan facility and the revolving credit facility will become due. The interest payments for the $65.0 million notional amount through the maturity date, and the full amount outstanding thereafter, are estimated based on the floating cash interest rate of approximately 2.67% per annum effective as of May 31, 2016.

Off-Balance-Sheet Arrangements

As of May 31, 2016, we did not have any significant off-balance-sheet arrangements.

 

53


Table of Contents

 

Item 3. Quantitative and Qualitative Disclosures About Market Risk.

 

We are exposed to several market risks in our normal business activities. Market risk is the potential loss that may result from market changes associated with our business or with an existing or forecasted financial or commodity transaction. The types of market risks to which we are exposed include credit risk and interest rate risk.

 

Credit Risk

 

Credit risk relates to the risk of loss resulting from non-performance or non-payment by offtake counterparties under the terms of their contractual obligations, thereby impacting the amount and timing of expected cash flows. We monitor and manage credit risk through credit policies that include a credit approval process and the use of credit mitigation measures such as having a diversified portfolio of offtake counterparties. However, there are a limited number of offtake counterparties under offtake agreements, which offtake counterparties are entities engaged in the energy industry, and this concentration may impact the overall exposure to credit risk, either positively or negatively, in that the offtake counterparties may be similarly affected by changes in economic, industry or other conditions. If any of these offtake agreement customers’ receivable balances in the future should be deemed uncollectible, it could have a material adverse effect on our forecasted cash flows.

 

The concentration of credit risk under the residential lease program is limited because customers are required to have a minimum FICO credit score at the time of initial contract, the existing customer base is of high credit quality with an average FICO credit score of 765 at the time of initial contract, the program has a large number of customers with small account balances for each, and the customers are diversified geographically within the United States. As of May 31, 2016, we do not believe we had significant credit risk because of the creditworthiness of the offtake counterparties.

 

Interest Rate Risk

 

We are exposed to interest rate risk because we depend on debt financing to purchase our projects. An increase in interest rates could make it difficult for us to obtain the financing necessary to purchase our projects on favorable terms, or at all, and thus reduce revenue and adversely impact our operating results. An increase in interest rates could lower our return on investment in a project and adversely impact our operating results. This risk is significant to our business because our growth is highly sensitive to interest rate fluctuations and the availability of credit, and would be adversely affected by increases in interest rates or liquidity constraints.

 

Our interest expense would increase to the extent interest rates rise in connection with our variable interest rate borrowings. As of May 31, 2016, the outstanding principal balance of our variable interest borrowings was $365.0 million of which $125.0 million is unhedged.  An immediate 10% increase in interest rates would have an increase of approximately $0.1 million of annualized interest expenses on our unaudited condensed consolidated financial statements. This increase was mitigated by interest rate swaps that we entered into on July 17, 2015 in connection with our term loan facility which covered $240.0 million of the $365.0 million outstanding principal balance. As of May 31, 2016, our investment portfolio consisted of 100% in demand deposits.

 

Item 4. Controls and Procedures.

 

Evaluation of Disclosure Controls and Procedures

 

We maintain disclosure controls and procedures, as defined in Rule 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), that are designed to provide reasonable assurance that information required to be disclosed in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure. In designing and evaluating our disclosure controls and procedures, management recognizes that disclosure controls and procedures, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the disclosure controls and procedures are met. Additionally, in designing disclosure controls and procedures, our management is required to apply its judgment in evaluating the cost-benefit relationship of possible disclosure controls and procedures. The design of any disclosure control and procedure also is based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions.

 

 

54


Table of Contents

 

Based on their evaluation as of the end of the period covered by this Quarterly Report on Form 10-Q, our Chief Executive Officer and Chief Financial Officer have concluded that our disclosure controls and procedures were effective as of May 31, 2016 at a reasonable assurance level.

 

Changes in Internal Control over Financial Reporting

 

We regularly review our system of internal control over financial reporting and make changes to our processes and systems to improve controls and increase efficiency, while ensuring that we maintain an effective internal control environment. Changes may include such activities as implementing new, more efficient systems, consolidating activities, and migrating processes.

There were no changes in our internal control over financial reporting that occurred during our most recent fiscal quarter that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

PART II—OTHER INFORMATION

 

 

Item 1. Legal Proceedings.

None.

 

 

Item 1A. Risk Factors.

There have been no material changes to the risk factors we previously disclosed in Part I, Item 1A. “Risk Factors” of the 2015 10-K. The risks described in the 2015 10-K are not the only risks facing the Partnership.  Additional risks and uncertainties not currently known to the Partnership, or that are currently deemed to be immaterial, also may materially adversely affect the Partnership’s business, financial condition, results of operations, cash available for distribution and prospects.

 

 

Item 2. Unregistered Sales of Equity Securities and Use of Proceeds.

None.

 

 

Item 3. Defaults Upon Senior Securities.

None.

 

 

Item 4. Mine Safety Disclosures.

None.

 

 

Item 5. Other Information.

None.

 

55


Table of Contents

 

Item 6. Exhibits.

 

Exhibit

Number

 

Description

 

 

 

  2.1

 

Purchase, Sale and Contribution Agreement dated January 26, 2016 by and between SunPower Corporation and 8point3 Operating Company, LLC (incorporated by reference to Exhibit 2.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on January 27, 2016).

 

 

 

  2.2

 

Purchase and Sale Agreement dated March 31, 2016 by and among First Solar Asset Management, LLC, 8point3 Operating Company, LLC and First Solar, Inc. (incorporated by reference to Exhibit 2.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

  2.3

 

Contribution Agreement dated March 31, 2016 by and among SunPower AssetCo, LLC, 8point3 Operating Company, LLC and SunPower Corporation (incorporated by reference to Exhibit 2.2 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

  10.1

 

Amendment No. 4 to Omnibus Agreement dated March 31, 2016, by and among 8point3 Operating Company, LLC, 8point3 General Partner, LLC, 8point3 Holding Company, LLC, 8point3 Energy Partners LP, First Solar, Inc. and SunPower Corporation (incorporated by reference to Exhibit 10.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

  10.2

 

Amendment and Waiver to the Right of First Offer Agreement dated March 28, 2016, by and between 8point3 Operating Company, LLC and First Solar, Inc. (incorporated by reference to Exhibit 10.2 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

  10.3

 

Amendment No. 5 to Omnibus Agreement dated April 1, 2016, by and among 8point3 Operating Company, LLC, 8point3 General Partner, LLC, 8point3 Holding Company, LLC, 8point3 Energy Partners LP, First Solar, Inc. and SunPower Corporation (incorporated by reference to Exhibit 10.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 7, 2016).

 

 

 

  10.4

 

Amended and Restated Omnibus Agreement dated April 6, 2016, by and among 8point3 Operating Company, LLC, 8point3 General Partner, LLC, 8point3 Holding Company, LLC, 8point3 Energy Partners LP, First Solar, Inc. and SunPower Corporation (incorporated by reference to Exhibit 10.2 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 7, 2016).

 

 

 

  10.5

 

First Amendment and Consent to Credit and Guaranty Agreement dated April 6, 2016 among 8point3 Operating Company, LLC, 8point3 Energy Partners LP, certain subsidiaries of 8point3 Operating Company, LLC, various lenders party thereto and Credit Agricole Corporate and Investment Bank, as administrative agent and collateral agent (incorporated by reference to Exhibit 10.3 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 7, 2016).

 

 

 

  31.1*

 

Certification of Principal Executive Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

 

 

 

  31.2*

 

Certification of Principal Financial Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

 

 

 

  32.1*

 

Certification of Principal Executive Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

 

 

 

  32.2*

 

Certification of Principal Financial Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

 

 

 

101.INS*

 

XBRL Instance Document

 

 

 

101.SCH*

 

XBRL Taxonomy Extension Schema Document

 

 

 

101.CAL*

 

XBRL Taxonomy Extension Calculation Linkbase Document

 

 

 

101.DEF*

 

XBRL Taxonomy Extension Definition Linkbase Document

 

 

 

101.LAB*

 

XBRL Taxonomy Extension Label Linkbase Document

 

56


Table of Contents

 

Exhibit

Number

 

Description

 

 

 

101.PRE*

 

XBRL Taxonomy Extension Presentation Linkbase Document

 

*

Filed herewith.

 

 

57


Table of Contents

 

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, as amended, the Registrant has duly caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

 

8point3 Energy Partners LP

 

 

 

 

 

 

By:

8point3 General Partner, LLC

 

 

 

its general partner

 

 

 

 

 

 

 

 

Date: June 29, 2016

 

By:

/s/ Mark R. Widmar

 

 

 

Mark R. Widmar

 

 

 

Chief Financial Officer and Director

(Principal Financial Officer)

 


 

58


Table of Contents

 

Exhibit Index

Exhibit

Number

 

Description

 

 

 

2.1

 

Purchase, Sale and Contribution Agreement dated January 26, 2016 by and between SunPower Corporation and 8point3 Operating Company, LLC (incorporated by reference to Exhibit 2.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on January 27, 2016).

 

 

 

2.2

 

Purchase and Sale Agreement dated March 31, 2016 by and among First Solar Asset Management, LLC, 8point3 Operating Company, LLC and First Solar, Inc. (incorporated by reference to Exhibit 2.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

2.3

 

Contribution Agreement dated March 31, 2016 by and among SunPower AssetCo, LLC, 8point3 Operating Company, LLC and SunPower Corporation (incorporated by reference to Exhibit 2.2 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

10.1

 

Amendment No. 4 to Omnibus Agreement dated March 31, 2016, by and among 8point3 Operating Company, LLC, 8point3 General Partner, LLC, 8point3 Holding Company, LLC, 8point3 Energy Partners LP, First Solar, Inc. and SunPower Corporation (incorporated by reference to Exhibit 10.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

10.2

 

Amendment and Waiver to the Right of First Offer Agreement dated March 28, 2016, by and between 8point3 Operating Company, LLC and First Solar, Inc. (incorporated by reference to Exhibit 10.2 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 1, 2016).

 

 

 

10.3

 

Amendment No. 5 to Omnibus Agreement dated April 1, 2016, by and among 8point3 Operating Company, LLC, 8point3 General Partner, LLC, 8point3 Holding Company, LLC, 8point3 Energy Partners LP, First Solar, Inc. and SunPower Corporation (incorporated by reference to Exhibit 10.1 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 7, 2016).

 

 

 

10.4

 

Amended and Restated Omnibus Agreement dated April 6, 2016, by and among 8point3 Operating Company, LLC, 8point3 General Partner, LLC, 8point3 Holding Company, LLC, 8point3 Energy Partners LP, First Solar, Inc. and SunPower Corporation (incorporated by reference to Exhibit 10.2 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 7, 2016).

 

 

 

10.5

 

First Amendment and Consent to Credit and Guaranty Agreement dated April 6, 2016 among 8point3 Operating Company, LLC, 8point3 Energy Partners LP, certain subsidiaries of 8point3 Operating Company, LLC, various lenders party thereto and Credit Agricole Corporate and Investment Bank, as administrative agent and collateral agent (incorporated by reference to Exhibit 10.3 to the Registrant’s Current Report on Form 8-K filed with the Securities and Exchange Commission on April 7, 2016).

 

 

 

31.1*

 

Certification of Principal Executive Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

 

 

 

31.2*

 

Certification of Principal Financial Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

 

 

 

32.1*

 

Certification of Principal Executive Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

 

 

 

32.2*

 

Certification of Principal Financial Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

 

 

 

101.INS*

 

XBRL Instance Document

 

 

 

101.SCH*

 

XBRL Taxonomy Extension Schema Document

 

 

 

101.CAL*

 

XBRL Taxonomy Extension Calculation Linkbase Document

 

 

 

101.DEF*

 

XBRL Taxonomy Extension Definition Linkbase Document

 

 

 

101.LAB*

 

XBRL Taxonomy Extension Label Linkbase Document

 

 

 

 

59


Table of Contents

 

Exhibit

Number

 

Description

101.PRE*

 

XBRL Taxonomy Extension Presentation Linkbase Document

 

*

Filed herewith.

 

 

60