2013 06 Jun 30 10Q

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One)
ý
 
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended June 30, 2013
or
¨
 
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from                      to                      
Commission file number 1-442
 
THE BOEING COMPANY
 
(Exact name of registrant as specified in its charter)
Delaware
 
91-0425694
(State or other jurisdiction of
incorporation or organization)
 
(I.R.S. Employer Identification No.)
 
 
 
100 N. Riverside Plaza, Chicago, IL
 
60606-1596
(Address of principal executive offices)
 
(Zip Code)
 
(312) 544-2000
 
(Registrant’s telephone number, including area code)
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ý No ¨
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes ý No ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):
Large accelerated filer  
ý
 
Accelerated filer
¨
Non-accelerated filer
¨
(Do not check if a smaller reporting company)
Smaller reporting company  
¨
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ¨ No ý
As of July 17, 2013, there were 754,444,329 shares of common stock, $5.00 par value, issued and outstanding.


Table of Contents

THE BOEING COMPANY
FORM 10-Q
For the Quarter Ended June 30, 2013
INDEX
Part I. Financial Information (Unaudited)
Page
 
 
 
Item 1.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Item 2.
 
 
 
 
 
 
 
 
 
 
 
 
Item 3.
 
 
 
Item 4.
 
 
 
Part II. Other Information
 
 
 
 
Item 1.
 
 
 
Item 1A.
 
 
 
Item 2.
 
 
 
Item 3.
 
 
 
Item 4.
 
 
 
Item 5.
 
 
 
Item 6.
 
 
 


Table of Contents

Part I. Financial Information
Item 1. Financial Statements
The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Operations
(Unaudited)
(Dollars in millions, except per share data)
Six months ended June 30
 
Three months ended June 30
  
2013

 
2012

 
2013


2012

Sales of products

$35,556

 

$34,026

 

$19,238



$17,341

Sales of services
5,152

 
5,362

 
2,577


2,664

Total revenues
40,708

 
39,388

 
21,815


20,005

 


 


 
 
 
 
Cost of products
(30,165
)
 
(28,420
)
 
(16,437
)

(14,759
)
Cost of services
(4,004
)
 
(4,342
)
 
(1,995
)

(1,962
)
Boeing Capital interest expense
(37
)
 
(58
)
 
(18
)

(25
)
Total costs and expenses
(34,206
)
 
(32,820
)
 
(18,450
)

(16,746
)
 
6,502

 
6,568

 
3,365


3,259

Income from operating investments, net
88

 
91

 
43


45

General and administrative expense
(1,900
)
 
(1,858
)
 
(929
)

(903
)
Research and development expense, net
(1,468
)
 
(1,692
)
 
(763
)

(857
)
Gain/(loss) on dispositions, net
22

 
(2
)
 


 
(2
)
Earnings from operations
3,244

 
3,107

 
1,716


1,542

Other income, net
22

 
22

 
13


10

Interest and debt expense
(195
)
 
(220
)
 
(96
)

(106
)
Earnings before income taxes
3,071

 
2,909

 
1,633


1,446

Income tax expense
(878
)
 
(1,018
)
 
(546
)

(479
)
Net earnings from continuing operations
2,193

 
1,891

 
1,087


967

Net gain/(loss) on disposal of discontinued operations, net of taxes of $0, $1, $0 and $0
1

 
(1
)
 
1




Net earnings

$2,194



$1,890

 

$1,088



$967

Basic earnings per share from continuing operations

$2.88

 

$2.51

 

$1.43

 

$1.28

Net gain/(loss) on disposal of discontinued operations, net of taxes

 

 

 

Basic earnings per share

$2.88

 

$2.51

 

$1.43



$1.28

Diluted earnings per share from continuing operations

$2.85

 

$2.49

 

$1.41

 

$1.27

Net gain/(loss) on disposal of discontinued operations, net of taxes 

 

 

 

Diluted earnings per share

$2.85

 

$2.49

 

$1.41



$1.27

Cash dividends paid per share

$0.97

 

$0.88

 

$0.485



$0.44

Weighted average diluted shares (millions)
770.1

 
760.7

 
771.8


762.0

See Notes to the Condensed Consolidated Financial Statements.

1

Table of Contents

The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Comprehensive Income
(Unaudited)
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30
 
2013

 
2012

 
2013

 
2012

Net earnings

$2,194

 

$1,890

 

$1,088

 

$967

Other comprehensive income, net of tax:
 
 
 
 
 
 
 
Currency translation adjustments
(88
)
 
(10
)
 
(65
)
 
(55
)
Unrealized loss on derivative instruments:
 
 
 
 
 
 
 
Unrealized loss arising during period, net of tax of $51, $7, $36 and $18
(89
)
 
(12
)
 
(63
)
 
(30
)
Reclassification adjustment for (gain)/loss included in net earnings, net of tax of $3, ($5), $4 and ($5)
(3
)
 
8

 
(5
)
 
8

Total unrealized loss on derivative instruments, net of tax
(92
)
 
(4
)
 
(68
)
 
(22
)
Defined benefit pension plans & other postretirement benefits:
 
 
 
 
 
 
 
Amortization of prior service cost included in net periodic pension cost, net of tax of ($3), ($6), ($2) and ($3)
5

 
8

 
2

 
4

Net actuarial gain arising during the period, net of tax of ($16), ($24), $0 and ($15)
30

 
43

 

 
27

Amortization of actuarial losses included in net periodic pension cost, net of tax of ($431), ($375), ($216) and ($187)
755

 
653

 
377

 
327

Settlements and curtailments included in net income, net of tax of ($5), ($3), $0 and ($1)
9

 
5

 

 
2

Pension and post retirement benefits related to our equity method investments, net of tax ($1), $6, $0 and $2
3

 
(11
)
 
1

 
(5
)
Total defined benefit pension plans & other postretirement benefits, net of tax
802

 
698

 
380

 
355

Other comprehensive income, net of tax
622

 
684

 
247

 
278

Comprehensive income related to noncontrolling interest
21

 
1

 
19

 
1

Comprehensive income, net of tax

$2,837

 

$2,575

 

$1,354

 

$1,246

See Notes to the Condensed Consolidated Financial Statements.

2

Table of Contents

The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Financial Position
(Unaudited)
(Dollars in millions, except per share data)
June 30
2013

 
December 31
2012

Assets
 
 
 
Cash and cash equivalents

$8,694

 

$10,341

Short-term and other investments
5,631

 
3,217

Accounts receivable, net
6,406

 
5,608

Current portion of customer financing, net
320

 
364

Deferred income taxes
25

 
28

Inventories, net of advances and progress billings
40,234

 
37,751

Total current assets
61,310

 
57,309

Customer financing, net
3,991

 
4,056

Property, plant and equipment, net of accumulated depreciation of $14,717 and $14,645
9,814

 
9,660

Goodwill
5,043

 
5,035

Acquired intangible assets, net
3,011

 
3,111

Deferred income taxes
6,307

 
6,753

Investments
1,166

 
1,180

Other assets, net of accumulated amortization of $464 and $504
1,449

 
1,792

Total assets

$92,091

 

$88,896

Liabilities and equity
 
 
 
Accounts payable

$10,437

 

$9,394

Accrued liabilities
12,412

 
12,995

Advances and billings in excess of related costs
18,145

 
16,672

Deferred income taxes and income taxes payable
5,072

 
4,485

Short-term debt and current portion of long-term debt
883

 
1,436

Total current liabilities
46,949

 
44,982

Accrued retiree health care
7,431

 
7,528

Accrued pension plan liability, net
20,070

 
19,651

Non-current income taxes payable
275

 
366

Other long-term liabilities
1,039

 
1,429

Long-term debt
8,695

 
8,973

Shareholders’ equity:
 
 
 
Common stock, par value $5.00 – 1,200,000,000 shares authorized; 1,012,261,159 shares issued
5,061

 
5,061

Additional paid-in capital
4,181

 
4,122

Treasury stock, at cost - 258,226,771 and 256,630,628 shares
(16,412
)
 
(15,937
)
Retained earnings
31,490

 
30,037

Accumulated other comprehensive loss
(16,794
)
 
(17,416
)
Total shareholders’ equity
7,526

 
5,867

Noncontrolling interest
106

 
100

Total equity
7,632

 
5,967

Total liabilities and equity

$92,091

 

$88,896

See Notes to the Condensed Consolidated Financial Statements.

3

Table of Contents

The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Cash Flows
(Unaudited)
(Dollars in millions)
Six months ended June 30
  
2013


2012

Cash flows – operating activities:
 

 
Net earnings

$2,194



$1,890

Adjustments to reconcile net earnings to net cash provided by operating activities:
 

 
Non-cash items – 
 

 
Share-based plans expense
107


99

Depreciation and amortization
865


848

Investment/asset impairment charges, net
26


45

Customer financing valuation benefit
(5
)

(1
)
(Gain)/loss on disposal of discontinued operations
(1
)
 
2

(Gain)/loss on dispositions, net
(22
)
 
2

Other charges and credits, net
31


361

Excess tax benefits from share-based payment arrangements
(47
)

(39
)
Changes in assets and liabilities – 
 

 
Accounts receivable
(550
)

(310
)
Inventories, net of advances and progress billings
(2,614
)

(2,737
)
Accounts payable
848


742

Accrued liabilities
(682
)

(594
)
Advances and billings in excess of related costs
1,472


(152
)
Income taxes receivable, payable and deferred
608


705

Other long-term liabilities
(60
)

(15
)
Pension and other postretirement plans
1,638


686

Customer financing, net
188


216

Other
(5
)

(3
)
Net cash provided by operating activities
3,991


1,745

Cash flows – investing activities:
 
 
 
Property, plant and equipment additions
(976
)
 
(780
)
Property, plant and equipment reductions
44

 
16

Acquisitions, net of cash acquired
(26
)
 
(18
)
Contributions to investments
(7,045
)
 
(6,396
)
Proceeds from investments
4,632

 
3,596

Purchase of distribution rights


 
(6
)
Net cash used by investing activities
(3,371
)
 
(3,588
)
Cash flows – financing activities:
 
 
 
New borrowings
531

 
24

Debt repayments
(1,361
)
 
(1,233
)
Repayments of distribution rights financing
(139
)
 
(72
)
Stock options exercised, other
484

 
71

Excess tax benefits from share-based payment arrangements
47

 
39

Employee taxes on certain share-based payment arrangements
(57
)
 
(68
)
Common shares repurchased
(1,000
)
 
 
Dividends paid
(735
)
 
(658
)
Net cash used by financing activities
(2,230
)
 
(1,897
)
Effect of exchange rate changes on cash and cash equivalents
(37
)
 
(4
)
Net decrease in cash and cash equivalents
(1,647
)
 
(3,744
)
Cash and cash equivalents at beginning of year
10,341

 
10,049

Cash and cash equivalents at end of period

$8,694

 

$6,305

See Notes to the Condensed Consolidated Financial Statements.

4

Table of Contents

The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Equity
(Unaudited)
 
Boeing shareholders
 
 
(Dollars in millions, except per share data)
Common
Stock

Additional
Paid-In
Capital

Treasury Stock

Retained
Earnings

Accumulated Other Comprehensive Loss

Non-
controlling
Interest

Total

Balance January 1, 2012

$5,061


$4,033


($16,603
)

$27,524


($16,500
)

$93


$3,608

Net earnings
 
 
 
1,890

 
1

1,891

Other comprehensive income, net of tax of ($400)
 
 
 
 
684

 
684

Share-based compensation and related dividend equivalents
 
106

 
(10
)
 
 
96

Excess tax pools
 
39

 
 
 
 
39

Treasury shares issued for stock options exercised, net
 
(31
)
104

 
 
 
73

Treasury shares issued for other share-based plans, net
 
(166
)
104

 
 
 
(62
)
Treasury shares issued for 401(k) contribution
 
37

193

 
 
 
230

Cash dividends declared ($0.88 per share)
 
 
 
(661
)
 
 
(661
)
Changes in non-controlling interest
 
 
 
 
 
(6
)
(6
)
Balance June 30, 2012

$5,061


$4,018


($16,202
)

$28,743


($15,816
)

$88


$5,892

 
 
 
 
 
 
 
 
Balance January 1, 2013

$5,061


$4,122


($15,937
)

$30,037


($17,416
)

$100


$5,967

Net earnings
 
 
 
2,194

 
21

2,215

Other comprehensive income, net of tax of ($403)
 
 
 
 
622

 
622

Share-based compensation and related dividend equivalents
 
111

 
(7
)
 
 
104

Excess tax pools
 
27

 
 
 
 
27

Treasury shares issued for stock options exercised, net
 
45

448

 
 
 
493

Treasury shares issued for other share-based plans, net
 
(124
)
77

 
 
 
(47
)
Common shares repurchased
 
 
(1,000
)
 
 
 
(1,000
)
Cash dividends declared ($0.97 per share)
 
 
 
(734
)
 
 
(734
)
Changes in non-controlling interest
 
 
 
 
 
(15
)
(15
)
Balance June 30, 2013

$5,061


$4,181


($16,412
)

$31,490


($16,794
)

$106


$7,632

See Notes to the Condensed Consolidated Financial Statements.

5

Table of Contents

The Boeing Company and Subsidiaries
Notes to Condensed Consolidated Financial Statements
Summary of Business Segment Data
(Unaudited)
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues:

 

 



Commercial Airplanes

$24,314

 

$22,780

 

$13,624



$11,843

Defense, Space & Security:

 

 



Boeing Military Aircraft
7,998

 
8,272

 
3,889


4,050

Network & Space Systems
4,009

 
3,832

 
2,049


1,960

Global Services & Support
4,289

 
4,321

 
2,248


2,182

Total Defense, Space & Security
16,296

 
16,425

 
8,186


8,192

Boeing Capital
209

 
238

 
104


113

Other segment
54

 
52

 
27


28

Unallocated items and eliminations
(165
)
 
(107
)
 
(126
)

(171
)
Total revenues

$40,708

 

$39,388

 

$21,815



$20,005

Earnings from operations:

 

 



Commercial Airplanes

$2,672

 

$2,292

 

$1,453



$1,211

Defense, Space & Security:

 

 



Boeing Military Aircraft
803

 
752

 
373


353

Network & Space Systems
293

 
245

 
137


136

Global Services & Support
512

 
493

 
266


259

Total Defense, Space & Security
1,608

 
1,490

 
776


748

Boeing Capital
63

 
72

 
19


39

Other segment
(101
)

(143
)
 
(43
)

(64
)
Unallocated items and eliminations
(998
)

(604
)
 
(489
)

(392
)
Earnings from operations
3,244

 
3,107

 
1,716


1,542

Other income, net
22

 
22

 
13


10

Interest and debt expense
(195
)
 
(220
)
 
(96
)

(106
)
Earnings before income taxes
3,071

 
2,909

 
1,633


1,446

Income tax expense
(878
)
 
(1,018
)
 
(546
)

(479
)
Net earnings from continuing operations
2,193

 
1,891

 
1,087


967

Net gain/(loss) on disposal of discontinued operations, net of taxes of $0, $1, $0 and $0
1

 
(1
)
 
1




Net earnings

$2,194

 

$1,890

 

$1,088



$967

This information is an integral part of the Notes to the Condensed Consolidated Financial Statements. See Note 18 for further segment results.

6

Table of Contents

The Boeing Company and Subsidiaries
Notes to the Condensed Consolidated Financial Statements
(Dollars in millions, except per share data)
(Unaudited)
Note 1 – Basis of Presentation
The condensed consolidated interim financial statements included in this report have been prepared by management of The Boeing Company (herein referred to as “Boeing”, the “Company”, “we”, “us”, or “our”). In the opinion of management, all adjustments (consisting of normal recurring accruals) necessary for a fair presentation are reflected in the interim financial statements. The results of operations for the period ended June 30, 2013 are not necessarily indicative of the operating results for the full year. The interim financial statements should be read in conjunction with the audited Consolidated Financial Statements, including the notes thereto, included in our 2012 Annual Report on Form 10-K. Amounts reported in prior periods as Interest and debt expense have been reclassified to Boeing Capital Interest expense to conform to the current period's presentation.
Use of Estimates
Management makes assumptions and estimates to prepare financial statements in conformity with accounting principles generally accepted in the United States of America. Those assumptions and estimates directly affect the amounts reported in the Condensed Consolidated Financial Statements. Significant estimates for which changes in the near term are considered reasonably possible and that may have a material impact on the financial statements are disclosed in these Notes to the Condensed Consolidated Financial Statements.
Contract accounting is used for development and production activities predominantly by Defense, Space & Security (BDS). Contract accounting involves a judgmental process of estimating total sales and costs for each contract resulting in the development of estimated cost of sales percentages. Changes in estimated revenues, cost of sales and the related effect on operating income are recognized using a cumulative catch-up adjustment which recognizes in the current period the cumulative effect of the changes on current and prior periods based on a contract’s percent complete. For the six months ended June 30, 2013 and 2012, net favorable cumulative catch-up adjustments, including reach-forward losses, across all BDS contracts increased Earnings from operations by $164 and $234 and diluted earnings per share by $0.15 and $0.20. For the three months ended June 30, 2013 and 2012, net favorable cumulative catch-up adjustments, including reach-forward losses, across all BDS contracts increased Earnings from operations by $59 and $122 and diluted earnings per share by $0.04 and $0.11.
Note 2 – Earnings Per Share
Basic and diluted earnings per share are computed using the two-class method, which is an earnings allocation method that determines earnings per share for common shares and participating securities. The undistributed earnings are allocated between common shares and participating securities as if all earnings had been distributed during the period. Participating securities and common shares have equal rights to undistributed earnings.
Basic earnings per share is calculated by taking net earnings, less earnings available to participating securities, divided by the basic weighted average common shares outstanding.
Diluted earnings per share is calculated by taking net earnings, less earnings available to participating securities, divided by the diluted weighted average common shares outstanding.

7

Table of Contents

The elements used in the computation of basic and diluted earnings per share were as follows:
(In millions - except per share amounts)
Six months ended June 30
 
Three months ended June 30
 
2013

 
2012

 
2013

 
2012

Net earnings

$2,194

 

$1,890

 

$1,088

 

$967

Less: earnings available to participating securities
4

 
4

 
1

 
1

Net earnings available to common shareholders

$2,190

 

$1,886

 

$1,087

 

$966

Basic
 
 
 
 
 
 
 
Basic weighted average shares outstanding
763.2

 
754.2

 
763.3

 
755.9

Less: participating securities
2.0

 
2.4

 
1.9

 
2.4

Basic weighted average common shares outstanding
761.2

 
751.8

 
761.4

 
753.5

Diluted
 
 
 
 
 
 
 
Basic weighted average shares outstanding
763.2

 
754.2

 
763.3

 
755.9

Dilutive potential common shares(1)
6.9

 
6.5

 
8.5

 
6.1

Diluted weighted average shares outstanding
770.1

 
760.7

 
771.8

 
762.0

Less: participating securities
2.0

 
2.4

 
1.9

 
2.4

Diluted weighted average common shares outstanding
768.1

 
758.3

 
769.9

 
759.6

Net earnings per share:
 
 
 
 
 
 
 
Basic

$2.88

 

$2.51

 

$1.43

 

$1.28

Diluted
2.85

 
2.49

 
1.41

 
1.27

(1) 
Diluted EPS includes any dilutive impact of stock options, restricted stock units and Performance Awards.
The shares included in the following table were not included in the computation of diluted earnings per share because the effect was antidilutive. However, these shares may be dilutive potential common shares in the future.
(Shares in millions)
Six months ended June 30
 
Three months ended June 30
 
2013

 
2012

 
2013

 
2012

Stock options
9.6

 
22.1

 


 
25.6

Performance Awards
5.2

 
4.5

 
4.5

 
4.5

Note 3 – Income Taxes
Our effective income tax rates were 28.6% and 33.4% for the six and three months ended June 30, 2013 and 35.0% and 33.1% for the same periods in the prior year. The effective tax rate for the six months ended June 30, 2013 is lower than the comparable prior year period primarily due to the inclusion of U.S. research and development tax credits in 2013 which were not available in 2012. On January 2, 2013, President Obama signed into law the American Taxpayer Relief Act of 2012 that retroactively renewed the research and development tax credit for 2012 and extended the credit through December 31, 2013. As tax law changes are recognized in the period in which new legislation is enacted, the 2012 R&D credit of $145 was recorded in the first quarter of 2013.
Federal income tax audits have been settled for all years prior to 2007. The years 2009-2010 are currently being examined by the IRS, and we have filed appeals with the IRS for tax years 2007-2008. We are also subject to examination in major state and international jurisdictions for the 2001-2012 tax years. We believe appropriate provisions for all outstanding tax issues have been made for all jurisdictions and all open years.

8

Table of Contents

Audit outcomes and the timing of audit settlements are subject to significant uncertainty. It is reasonably possible that within the next 12 months we will resolve the matters presently under consideration for the 2007-2008 tax years with the IRS. Depending on the timing and outcome of the audit settlement, unrecognized tax benefits that affect the effective tax rate could increase earnings by up to $260 based on current estimates.
Note 4 – Accounts Receivable
Accounts receivable as of June 30, 2013, includes $112 of unbillable receivables on a long-term contract with LightSquared, LLC (LightSquared) related to the construction of two commercial satellites. One of the satellites has been delivered, and the other is substantially complete but remains in Boeing’s possession. On May 14, 2012, LightSquared filed for Chapter 11 bankruptcy protection. We believe that our rights in the second satellite and related ground-segment assets are sufficient to protect the value of our receivables in the event LightSquared fails to make payments as contractually required or rejects its contract with us. Given the uncertainties inherent in bankruptcy proceedings it is reasonably possible that we could incur losses related to these receivables in connection with the LightSquared bankruptcy.
Note 5 – Inventories
Inventories consisted of the following:
 
June 30
2013

 
December 31
2012

Long-term contracts in progress

$14,983

 

$15,130

Commercial aircraft programs
45,877

 
40,389

Commercial spare parts, used aircraft, general stock materials and other
7,206

 
7,206

Inventory before advances and progress billings
68,066

 
62,725

Less advances and progress billings
(27,832
)
 
(24,974
)
Total

$40,234

 

$37,751

Long-Term Contracts in Progress
Long-term contracts in progress included Delta launch program inventory that is being sold at cost to United Launch Alliance (ULA) under an inventory supply agreement that terminates on March 31, 2021. At June 30, 2013 and December 31, 2012, the inventory balance, net of advances, was $665 and $725. At June 30, 2013, $390 of this inventory related to unsold launches. See Note 10.
Inventory balances included $237 subject to claims or other uncertainties relating to the A-12 program at June 30, 2013 and December 31, 2012. See Note 17.
Capitalized precontract costs of $358 and $238 at June 30, 2013 and December 31, 2012, are included in inventories.
Commercial Aircraft Programs
At June 30, 2013 and December 31, 2012, commercial aircraft programs inventory included the following amounts related to the 787 program: $25,697 and $21,289 of work in process (including deferred production costs of $18,733 and $15,929), $1,977 and $1,908 of supplier advances, and $2,620 and $2,339 of unamortized tooling and other non-recurring costs. At June 30, 2013, $15,674 of 787 deferred production costs, unamortized tooling and other non-recurring costs are expected to be recovered from units included in the program accounting quantity that have firm orders and $5,679 is expected to be recovered from units included in the program accounting quantity that represent expected future orders.
At June 30, 2013 and December 31, 2012, commercial aircraft programs inventory included the following amounts related to the 747 program: $1,374 and $1,292 of deferred production costs, net of previously recorded reach-forward losses, and $627 and $683 of unamortized tooling costs. At June 30, 2013, $971 of

9

Table of Contents

747 deferred production costs and unamortized tooling are expected to be recovered from units included in the program accounting quantity that have firm orders and $1,030 is expected to be recovered from units included in the program accounting quantity that represent expected future orders.
Commercial aircraft programs inventory included amounts credited in cash or other consideration (early issue sales consideration) to airline customers totaling $3,426 and $2,989 at June 30, 2013 and December 31, 2012.
Note 6 – Customer Financing
Customer financing primarily relates to the BCC segment and consisted of the following:
 
June 30
2013

 
December 31
2012

Financing receivables:
 
 
 
Investment in sales-type/finance leases

$1,759

 

$1,850

Notes
611

 
592

Operating lease equipment, at cost, less accumulated depreciation of $574 and $628
1,996

 
2,038

Gross customer financing
4,366

 
4,480

Less allowance for losses on receivables
(55
)
 
(60
)
Total

$4,311

 

$4,420

We determine a receivable is impaired when, based on current information and events, it is probable that we will be unable to collect amounts due according to the original contractual terms. At June 30, 2013 and December 31, 2012, we individually evaluated for impairment customer financing receivables of $563 and $616 and determined that $420 and $446 were impaired. We recorded no allowance for losses on these impaired receivables as the collateral values exceed the carrying values of the receivables.
The adequacy of the allowance for losses is assessed quarterly. Three primary factors influencing the level of our allowance for losses on customer financing receivables are customer credit ratings, default rates and collateral values. We assign internal credit ratings for all customers and determine the creditworthiness of each customer based upon publicly available information and information obtained directly from our customers. Our rating categories are comparable to those used by the major credit rating agencies.
Our financing receivable balances by internal credit rating category are shown below. 
Rating categories
June 30
2013

 
December 31
2012

BBB

$1,137

 

$1,201

BB
56

 
63

B
149

 
51

CCC
465

 
511

D
463

 
524

Other
100

 
92

Total carrying value of financing receivables

$2,370

 

$2,442

At June 30, 2013, our allowance primarily related to receivables with ratings of CCC and we applied default rates that averaged 46% to the exposure associated with those receivables.
In the fourth quarter of 2011, American Airlines Inc. (American Airlines) filed for Chapter 11 bankruptcy protection. We believe that our customer financing receivables from American Airlines of $463 are sufficiently collateralized such that we do not expect to incur losses related to those receivables and have not recorded an allowance for losses as of June 30, 2013 as a result of the bankruptcy.

10

Table of Contents

Customer Financing Exposure Customer financing is collateralized by security in the related asset. The value of the collateral is closely tied to commercial airline performance and overall market conditions and may be subject to reduced valuation with market decline. Declines in collateral values are also a significant driver of our allowance for losses. Generally, out-of-production aircraft have experienced greater collateral value declines than in-production aircraft. Our customer financing portfolio is primarily collateralized by out-of-production aircraft. The majority of customer financing carrying values are concentrated in the following aircraft models:
 
June 30
2013

 
December 31
2012

717 Aircraft ($454 and $465 accounted for as operating leases) (1)

$1,728

 

$1,781

757 Aircraft ($415 and $454 accounted for as operating leases) (1)
485

 
561

MD-80 Aircraft (Accounted for as sales-type finance leases) (1)
420

 
446

787 Aircraft (Accounted for as operating leases)
376

 
286

747 Aircraft ($238 and $221 accounted for as operating leases)
343

 
221

MD-11 Aircraft (Accounted for as operating leases) (1)
261

 
269

737 Aircraft ($147 and $193 accounted for as operating leases)
224

 
316

767 Aircraft ($62 and $63 accounted for as operating leases)
205

 
223

(1) 
Out-of-production aircraft.
Note 7 – Investments
Our investments, which are recorded in Short-term and other investments or Investments, consisted of the following:
 
June 30
2013

 
December 31
2012

Time deposits

$5,560

 

$3,135

Pledged money market funds (1)
46

 
56

Available-for-sale investments
7

 
9

Equity method investments (2)
1,126

 
1,137

Restricted cash (3)
24

 
25

Other investments
34

 
35

Total

$6,797

 

$4,397

(1) 
Reflects amounts pledged in lieu of letters of credit as collateral in support of our workers’ compensation programs. These funds can become available within 30 days notice upon issuance of replacement letters of credit.
(2) 
Dividends received were $103 and $53 during the six and three months ended June 30, 2013, and $121 and $68 during the same periods in the prior year.
(3) 
Restricted to pay life insurance premiums for certain employees and certain claims related to workers' compensation.

11

Table of Contents

Note 8 – Other Assets
Sea Launch
At June 30, 2013 and December 31, 2012, Other assets included $356 of receivables related to our former investment in the Sea Launch venture which became payable by certain Sea Launch partners following Sea Launch’s bankruptcy filing in June 2009. The $356 includes $147 related to a payment made by us under a bank guarantee on behalf of Sea Launch and $209 related to loans (partner loans) we made to Sea Launch. The net amounts owed to Boeing by each of the partners are as follows: S.P. Koroley Rocket and Space Corporation Energia of Russia – $223, PO Yuzhnoye Mashinostroitelny Zavod of Ukraine – $89 and KB Yuzhnoye of Ukraine – $44.
Although each partner is contractually obligated to reimburse us for its share of the bank guarantee, the Russian and Ukrainian partners have raised defenses to enforcement and contested our claims. On October 19, 2009, we filed a Notice of Arbitration with the Stockholm Chamber of Commerce seeking reimbursement from the other Sea Launch partners of the $147 bank guarantee payment. On October 7, 2010, the arbitrator ruled that the Stockholm Chamber of Commerce lacked jurisdiction to hear the matter but did not resolve the merits of our claim. We filed a notice appealing the arbitrator’s ruling on January 11, 2011. The Ukrainian partners responded to our appeal on June 30, 2012 and the Russian partner responded on July 3, 2012. We filed replies on September 20, 2012. On February 1, 2013, we filed an action in the United States District Court for the Central District of California seeking reimbursement from the other Sea Launch partners of the $147 bank guarantee payment and the $209 partner loan obligations. We believe the partners have the financial wherewithal to pay and intend to pursue vigorously all of our rights and remedies. In the event we are unable to secure reimbursement of $147 related to our payment under the bank guarantee and $209 related to partner loans made to Sea Launch, we could incur additional pre-tax charges of up to $356.
Note 9 – Commitments and Contingencies
Environmental
The following table summarizes environmental remediation activity during the six months ended June 30, 2013 and 2012.
 
2013

 
2012

Beginning balance – January 1

$710

 

$758

Reductions for payments made
(37
)
 
(33
)
Changes in estimates
25

 
45

Ending balance – June 30

$698

 

$770

The liabilities recorded represent our best estimate or the low end of a range of reasonably possible costs expected to be incurred to remediate sites, including operation and maintenance over periods of up to 30 years. It is reasonably possible that we may incur charges that exceed these recorded amounts because of regulatory agency orders and directives, changes in laws and/or regulations, higher than expected costs and/or the discovery of new or additional contamination. As part of our estimating process, we develop a range of reasonably possible alternate scenarios which include the high end of a range of reasonably possible cost estimates for all remediation sites for which we have sufficient information based on our experience and existing laws and regulations. There are some potential remediation obligations where the costs of remediation cannot be reasonably estimated. At June 30, 2013 and December 31, 2012, the high end of the estimated range of reasonably possible remediation costs exceeded our recorded liabilities by $886 and $865.

12

Table of Contents

Product Warranties
The following table summarizes product warranty activity recorded during the six months ended June 30, 2013 and 2012.
 
2013

 
2012

Beginning balance – January 1

$1,572

 

$1,046

Additions for current year deliveries
231

 
212

Reductions for payments made
(243
)
 
(137
)
Changes in estimates
(50
)
 
86

Ending balance – June 30

$1,510

 

$1,207

Commercial Aircraft Commitments
In conjunction with signing definitive agreements for the sale of new aircraft (Sale Aircraft), we have entered into trade-in commitments with certain customers that give them the right to trade in used aircraft at a specified price upon the purchase of Sale Aircraft. The probability that trade-in commitments will be exercised is determined by using both quantitative information from valuation sources and qualitative information from other sources. The probability of exercise is assessed quarterly, or as events trigger a change, and takes into consideration the current economic and airline industry environments. Trade-in commitments, which can be terminated by mutual consent with the customer, may be exercised only during the period specified in the agreement, and require advance notice by the customer.
Trade-in commitment agreements at June 30, 2013 have expiration dates from 2013 through 2023. At June 30, 2013, and December 31, 2012 total contractual trade-in commitments were $1,448 and $1,535. As of June 30, 2013 and December 31, 2012, we estimated that it was probable we would be obligated to perform on certain of these commitments with net amounts payable to customers totaling $133 and $108 and the fair value of the related trade-in aircraft was $133 and $108.
Financing Commitments
Financing commitments related to aircraft on order, including options and those proposed in sales campaigns, totaled $17,815 and $18,083 as of June 30, 2013 and December 31, 2012. The estimated earliest potential funding dates for these commitments as of June 30, 2013 are as follows:
  
Total

July through December 2013

$486

2014
2,995

2015
3,724

2016
3,272

2017
3,105

Thereafter
4,233

 

$17,815

As of June 30, 2013, $16,622 of these financing commitments related to customers we believe have less than investment-grade credit. We have concluded that no reserve for future potential losses is required for these financing commitments based upon the terms, such as collateralization and interest rates, under which funding would be provided.

13

Table of Contents

Standby Letters of Credit and Surety Bonds
We have entered into standby letters of credit and surety bonds with financial institutions primarily relating to the guarantee of our future performance on certain contracts. Contingent liabilities on outstanding letters of credit agreements and surety bonds aggregated approximately $4,566 and $4,545 as of June 30, 2013 and December 31, 2012.
Commitments to ULA
We and Lockheed Martin Corporation have each committed to provide ULA with up to $527 of additional capital contributions in the event ULA does not have sufficient funds to make a required payment to us under an inventory supply agreement. See Note 5.
C-17
At June 30, 2013, our backlog included 1 C-17 aircraft under contract with the U.S. Air Force (USAF) and an international order for 8 C-17 aircraft. We are currently producing C-17 aircraft at a rate of 10 per year. Should additional orders not materialize, it is reasonably possible that we will decide in 2013 to end production of the C-17 at a future date. We are still evaluating the full financial impact of a potential production shutdown, including pension curtailment charges, and any recovery that would be available from the U.S. government. Such recovery from the U.S. government would not include the costs incurred by us resulting from our direction to suppliers to begin working on aircraft beyond those currently under contract. At June 30, 2013, we had approximately $620 of inventory expenditures and potential termination liabilities to suppliers primarily associated with anticipated orders from international customers for 12 aircraft.
F-15
At June 30, 2013, we had approximately $85 of potential termination liabilities to suppliers and inventory expenditures related to an anticipated international order. Should this order not materialize, we could incur losses to settle termination liabilities and write off inventory.
U.S. Government Defense Budget/Sequestration
In August 2011, the Budget Control Act (The Act) reduced the United States defense top line budget by approximately $490 billion through 2021. The Act further reduced the defense top line budget by an additional $500 billion through 2021 if Congress did not enact $1.2 trillion in further budget reductions by January 15, 2012. Should Congress in future years provide funding above the yearly spending limits of The Act, sequestration will automatically take effect and cancel any excess amount above the limits. The annual spending limits of The Act will remain in place unless and until the current law is changed.
On March 1, 2013, sequestration was implemented for the U.S. government fiscal year 2013 (FY2013) and the Office of Management and Budget (OMB) issued a report to Congress listing illustrative cuts which equal a 7.8% reduction in FY2013 non-exempt defense discretionary funding and a 5.0% reduction in non-exempt nondefense discretionary funding. However, as noted in the OMB report, the effective reduction in funds would be approximately 13% for non-exempt defense programs and 9% for non-exempt nondefense programs if implemented over the seven-month period from March 1, 2013 to September 30, 2013.
On June 10, 2013, the United States Department of Defense (U.S. DoD) released its Report on the Joint Committee Sequestration for FY2013, which summarized the budgetary resources sequestered at the U.S. DoD's program, project and activity levels.
The OMB report, the U.S. DoD Report and other communications with the U.S. DoD indicate that there are likely to be reductions to our defense business. However, at this time we cannot determine how sequestration will impact specific programs and contracts at Boeing. Reductions, cancellations or delays impacting existing contracts or programs could have a material effect on our results of operations, financial position and/or

14

Table of Contents

cash flows. While U.S. DoD would sustain the bulk of sequestration cuts affecting the Company, civil programs and agencies could be significantly impacted as well.
BDS Fixed-Price Development Contracts
Fixed-price development work is inherently uncertain and subject to significant variability in estimates of the cost and time required to complete the work. BDS fixed-price contracts with significant development work include Airborne Early Warning and Control, Family of Advanced Beyond Line-of-Sight Terminals, India P-8I, Saudi Arabia F-15, USAF KC-46A Tanker and commercial and military satellites. The operational and technical complexities of these contracts create financial risk, which could trigger termination provisions, order cancellations or other financially significant exposure. Changes to cost and revenue estimates could also result in lower margins or a material charge for reach-forward losses during the next 12 months.
Recoverable Costs on Government Contracts  
Our final incurred costs for each year are subject to audit and review for allowability by the U.S. government, which can result in payment demands related to costs they believe should be disallowed. We work with the U.S government to assess the merits of claims and where appropriate reserve for amounts disputed. If we are unable to satisfactorily resolve disputed costs, we could be required to record an earnings charge and/or provide refunds to the U.S. government.
747 and 787 Commercial Airplane Programs
The development and initial production of new commercial airplanes and new commercial airplane derivatives, which include the 747 and 787, entail significant commitments to customers and suppliers as well as substantial investments in working capital, infrastructure and research and development. The 747 and 787 programs have gross margins that are breakeven or near breakeven at June 30, 2013.
Continued weakness in the air cargo market and lower-than-expected demand for large commercial passenger aircraft have resulted in pricing pressures and fewer 747 orders than anticipated. We continue to have a number of unsold Freighter and Intercontinental production positions beyond 2013. If we are unable to obtain orders for multiple Freighter aircraft in 2013 consistent with our near-term production plans, we may be required to take actions including further reducing the production rate and/or building airplanes for which we have not received firm orders. If market and production risks cannot be mitigated, the program could face an additional reach-forward loss that may be material.
The cumulative impacts of production challenges, change incorporation, schedule delays and customer and supplier impacts have created significant pressure on 787 program profitability. If risks related to this program, including risks associated with planned production rate increases, or introducing the 787-9 and 787-10 derivatives as scheduled cannot be mitigated, the program could face additional customer claims and/or supplier assertions, as well as a reach-forward loss that may be material.

15

Table of Contents

Note 10 – Arrangements with Off-Balance Sheet Risk
We enter into arrangements with off-balance sheet risk in the normal course of business, primarily in the form of guarantees.
The following table provides quantitative data regarding our third party guarantees. The maximum potential payments represent a “worst-case scenario,” and do not necessarily reflect amounts that we expect to pay. Estimated proceeds from collateral and recourse represent the anticipated values of assets we could liquidate or receive from other parties to offset our payments under guarantees. The carrying amount of liabilities represents the amount included in Accrued liabilities. 
  
Maximum
Potential Payments
 
Estimated Proceeds from
Collateral/Recourse
 
Carrying Amount of
 Liabilities
 
June 30
2013

December 31
2012

 
June 30
2013

December 31
2012

 
June 30
2013

December 31
2012

Contingent repurchase commitments

$2,170


$2,065

 

$2,165


$2,065

 

$5


$5

Indemnifications to ULA:
 
 
 
 
 
 
 
 
Contributed Delta program launch inventory
135

137

 
 
 
 
 
 
Contract pricing
261

261

 
 
 
 
7

7

Other Delta contracts
234

232

 
 
 
 
8

8

Other indemnifications
116

137

 
 
 
 
26

32

Contingent Repurchase Commitments The repurchase price specified in contingent repurchase commitments is generally lower than the expected fair value at the specified repurchase date. Estimated proceeds from collateral/recourse in the table above represent the lower of the contracted repurchase price or the expected fair value of each aircraft at the specified repurchase date.
Indemnifications to ULA In 2006, we agreed to indemnify ULA through December 31, 2020 against potential non-recoverability and non-allowability of $1,360 of Boeing Delta launch program inventory included in contributed assets plus $1,860 of inventory subject to an inventory supply agreement which ends on March 31, 2021. Since inception, ULA has consumed $1,225 of the $1,360 of inventory that was contributed by us and has yet to consume $135. ULA has made advance payments of $1,140 to us and we have recorded revenues and cost of sales of $868 under the inventory supply agreement through June 30, 2013.
We agreed to indemnify ULA against potential losses that ULA may incur in the event ULA is unable to obtain certain additional contract pricing from the USAF for four satellite missions. We believe ULA is entitled to additional contract pricing. In December 2008, ULA submitted a claim to the USAF to re-price the contract value for two satellite missions. In March 2009, the USAF issued a denial of that claim. In June 2009, ULA filed a notice of appeal, and in October 2009, ULA filed a complaint before the Armed Services Board of Contract Appeals (ASBCA) for a contract adjustment for the price of the two satellite missions. In September 2009, the USAF exercised its option for a third satellite mission. During the third quarter of 2010, ULA submitted a claim to the USAF to re-price the contract value of the third mission. The USAF did not exercise an option for a fourth mission prior to the expiration. In March 2011, ULA filed a notice of appeal before the ASBCA, seeking to re-price the third mission. A hearing before the ASBCA has been scheduled for November 18, 2013. On March 1, 2013, the USAF filed two motions for summary judgment before the ASBCA. ULA's oppositions to these motions were filed on April 19, 2013 and USAF filed its replies to ULA's oppositions on May 10, 2013. There is no deadline for the ASBCA to rule on these motions. If ULA is unsuccessful in obtaining additional pricing, we may be responsible for a portion of the shortfall and may record up to $278 in pre-tax losses associated with the three missions, representing up to $261 for the indemnification payment and up to $17 for our portion of additional contract losses incurred by ULA.
Potential payments for Other Delta contracts include $85 related to deferred support costs. In June 2011, the Defense Contract Management Agency (DCMA) notified ULA that it had determined that $271 of deferred support costs are not recoverable under government contracts. In December 2011, the DCMA notified ULA of the potential non-recoverability of an additional $114 of deferred production costs. The DCMA has not yet issued a final decision related to the recoverability of the $114. ULA and Boeing believe that all costs are

16

Table of Contents

recoverable and in November 2011, ULA filed a certified claim with the USAF for collection of deferred support and production costs. The USAF issued a final decision denying ULA’s certified claim in May 2012. On June 14, 2012, Boeing and ULA filed a suit in the Court of Federal Claims seeking recovery of the deferred support and production costs from the U.S. government. On November 9, 2012, the U.S. government filed an answer to our claim and asserted a counterclaim for credits that it alleges were offset by deferred support cost invoices. We believe that the U.S. government’s counterclaim is without merit, and have filed an answer challenging it on multiple grounds. The litigation proceeds, with no trial date having yet been set. If, contrary to our belief, it is determined that some or all of the deferred support or production costs are not recoverable, we could be required to record pre-tax losses and make indemnification payments to ULA for up to $317 of the costs questioned by the DCMA.
Other Indemnifications As part of the 2004 sale agreement with General Electric Capital Corporation related to the sale of Boeing Capital’s (BCC) Commercial Financial Services business, BCC is involved in a loss sharing arrangement for losses on transferred portfolio assets, such as asset sales, provisions for loss or asset impairment charges offset by gains from asset sales. At June 30, 2013 and December 31, 2012, our maximum future cash exposure to losses associated with the loss sharing arrangement was $116 and $137 and our accrued liability under the loss sharing arrangement was $26 and $32.
In conjunction with our sales of the Electron Dynamic Devices, Inc. and Rocketdyne Propulsion and Power businesses and the sale of our Commercial Airplanes facilities in Wichita, Kansas and Tulsa and McAlester, Oklahoma in 2005, we agreed to indemnify, for an indefinite period, the buyers for costs relating to pre-closing environmental contamination and certain other items. As it is impossible to assess whether there will be damages in the future or the amounts thereof (if any), we cannot estimate the maximum potential amount of future payments under these indemnities. Therefore, no liability has been recorded. There have been no claims submitted to date.
Note 11 – Debt
On May 3, 2013, we issued $350 of fixed rate senior notes due May 15, 2018 (Fixed Rate Senior Notes) and $150 of floating rate senior notes due November 3, 2014 (Floating Rate Senior Notes). The Fixed Rate Senior Notes bear an annual interest rate of 0.95%, and may be redeemed at our option at any time for a redemption price equal to the full principal amount plus any accrued and unpaid interest and a make-whole premium. The Floating Rate Senior Notes bear an annual interest rate of three-month LIBOR plus one basis point, and are not redeemable prior to maturity. The notes are unsecured senior obligations and rank equally in right of payment with our existing and future unsecured and unsubordinated indebtedness. The net proceeds of the issuance totaling $494, after deducting underwriting discounts, commissions and offering expenses, were used to fund Boeing Capital Corporation.

17

Table of Contents

Note 12 – Postretirement Plans
The components of net periodic benefit cost were as follows:
 
Six months ended June 30
 
Three months ended June 30
Pension Plans
2013

 
2012

 
2013

 
2012

Service cost

$946

 

$822

 

$473

 

$411

Interest cost
1,462

 
1,502

 
731

 
751

Expected return on plan assets
(1,938
)
 
(1,916
)
 
(969
)
 
(958
)
Amortization of prior service costs
98

 
112

 
49

 
56

Recognized net actuarial loss
1,138

 
968

 
569

 
484

Settlement and curtailment loss
20

 
10

 


 
3

Net periodic benefit cost

$1,726

 

$1,498

 

$853

 

$747

Net periodic benefit cost included in Earnings from operations

$1,544

 

$1,248

 

$753

 

$593

 
Six months ended June 30
 
Three months ended June 30
Other Postretirement Benefit Plans
2013

 
2012

 
2013

 
2012

Service cost

$74

 

$72

 

$37

 

$36

Interest cost
133

 
158

 
66

 
79

Expected return on plan assets
(4
)
 
(4
)
 
(2
)
 
(2
)
Amortization of prior service costs
(90
)
 
(98
)
 
(45
)
 
(49
)
Recognized net actuarial loss
48

 
60

 
24

 
30

Settlement and curtailment gain


 
(2
)
 

 

Net periodic benefit cost

$161

 

$186

 

$80

 

$94

Net periodic benefit cost included in Earnings from operations

$179

 

$282

 

$88

 

$133

During the six months ended June 30, 2013 and 2012, we made discretionary pension contributions of $13 and $763.
Note 13 – Share-Based Compensation and Other Compensation Arrangements
Stock Options
On February 25, 2013, we granted to our executives 6,591,968 options with an exercise price equal to the fair market value of our stock on the date of grant and which expire 10 years after the date of grant. The stock options vest over a period of three years, with 34% vesting after the first year, 33% vesting after the second year and the remaining 33% vesting after the third year. The grant-date fair value of each stock option was $15.85.
Restricted Stock Units
On February 25, 2013, we granted to our executives 1,375,414 restricted stock units (RSUs) as part of our long-term incentive program with a grant date fair value of $75.97 per share. The RSUs granted under this program will vest and settle in common stock (on a one-for-one basis) on the third anniversary of the grant date.

18

Table of Contents

Performance Awards
On February 25, 2013, we granted to our executives Performance Awards with the payout based on the achievement of financial goals for the three-year period ending December 31, 2015. The minimum payout amount is $0 and the maximum payout is $278.
Note 14 – Shareholders' Equity
Accumulated Other Comprehensive Loss
Changes in Accumulated other comprehensive loss (AOCI) by component for the six and three months ended June 30, 2013 were as follows:
 
Currency Translation Adjustments

 
Unrealized Gains and Losses on Certain Investments

 
Unrealized Gains and Losses on Derivative Instruments

 
Defined Benefit Pension Plans & Other Postretirement Benefits

 
Total (1)

Balance January 1, 2013

$214

 

($8
)
 

$86

 

($17,708
)
 

($17,416
)
OCI before reclassifications
(88
)
 

 
(89
)
 
33

 
(144
)
Amounts reclassified from AOCI

 

 
(3
)
 
769

(2) 
766

Net current period OCI
(88
)
 

 
(92
)
 
802

 
622

Balance June 30, 2013

$126

 

($8
)
 

($6
)
 

($16,906
)
 

($16,794
)
Balance March 31, 2013

$191

 

($8
)
 

$62

 

($17,286
)
 

($17,041
)
OCI before reclassifications
(65
)
 

 
(63
)
 
1

 
(127
)
Amounts reclassified from AOCI

 

 
(5
)
 
379

(2) 
374

Net current period OCI
(65
)
 

 
(68
)
 
380

 
247

Balance June 30, 2013

$126

 

($8
)
 

($6
)
 

($16,906
)
 

($16,794
)
(1) 
Net of tax.
(2) 
Primarily relates to amortization of actuarial gains/losses for the six and three months ended June 30, 2013 totaling $755 and $377 (net of tax of $431 and $216) which is included in the net periodic pension cost of which a portion is allocated to production as inventoried costs.
Note 15 – Derivative Financial Instruments
Cash Flow Hedges
Our cash flow hedges include foreign currency forward contracts, foreign currency option contracts, commodity swaps, and commodity purchase contracts. We use foreign currency forward and option contracts to manage currency risk associated with certain transactions, specifically forecasted sales and purchases made in foreign currencies. Our foreign currency contracts hedge forecasted transactions principally occurring within five years in the future, with certain contracts hedging transactions through 2023. We use commodity derivatives, such as swaps and fixed-price purchase commitments to hedge against potentially unfavorable price changes for items used in production. Our commodity contracts hedge forecasted transactions through 2016.

19

Table of Contents

Fair Value Hedges
Interest rate swaps under which we agree to pay variable rates of interest are designated as fair value hedges of fixed-rate debt. The net change in fair value of the derivatives and the hedged items is reported in Boeing Capital interest expense.
Derivative Instruments Not Receiving Hedge Accounting Treatment
We also hold certain derivative instruments, primarily foreign currency forward contracts, for risk management purposes that are not receiving hedge accounting treatment.
Notional Amounts and Fair Values
The notional amounts and fair values of derivative instruments in the Condensed Consolidated Statements of Financial Position were as follows:
  
Notional amounts (1)
Other assets
Accrued liabilities
  
June 30
2013

December 31
2012

June 30
2013

December 31
2012

June 30
2013

December 31
2012

Derivatives designated as hedging instruments:
 
 
 
 
 
 
Foreign exchange contracts

$2,388


$2,310


$111


$202


($65
)

($16
)
Interest rate contracts
313

388

17

26



 
Commodity contracts
92

99



(57
)
(71
)
Derivatives not receiving hedge accounting treatment:
 
 
 
 
 
 
Foreign exchange contracts
323

412

18

3

(36
)
(42
)
Commodity contracts
15

15





(7
)
(8
)
Total derivatives
3,131

3,224

146

231

(165
)
(137
)
Netting arrangements
 
 
(53
)
(53
)
53

53

Net recorded balance
 
 

$93


$178


($112
)

($84
)
(1) 
Notional amounts represent the gross contract/notional amount of the derivatives outstanding.
Gains/(losses) associated with our cash flow and undesignated hedging transactions and their effect on Other comprehensive income/(loss) and Net earnings were as follows: 
  
Six months ended June 30
 
Three months ended June 30
  
2013

 
2012

 
2013

 
2012

Effective portion recognized in Other comprehensive income/(loss), net of taxes:
 
 
 
 
 
 
 
Foreign exchange contracts

($87
)
 

($1
)
 

($61
)
 

($33
)
Commodity contracts
(2
)
 
(11
)
 
(2
)
 
3

Effective portion reclassified out of Accumulated other comprehensive loss into earnings, net of taxes:
 
 
 
 
 
 
 
Foreign exchange contracts
14

 
10

 
11

 
3

Commodity contracts
(11
)
 
(18
)
 
(6
)
 
(11
)
Forward points recognized in Other income/(expense), net:
 
 
 
 
 
 
 
Foreign exchange contracts
22

 
12

 
14

 
16

Undesignated derivatives recognized in Other income/(expense), net:
 
 
 
 
 
 
 
Foreign exchange contracts
14

 
(10
)
 
15

 
(14
)

20

Table of Contents

Based on our portfolio of cash flow hedges, we expect to reclassify losses of $7 (pre-tax) out of Accumulated other comprehensive loss into earnings during the next 12 months. Ineffectiveness related to our hedges recognized in Other income/(expense) was insignificant for the six and three months ended June 30, 2013 and 2012.
We have derivative instruments with credit-risk-related contingent features. For foreign exchange contracts with original maturities of at least five years, our derivative counterparties could require settlement if we default on our five-year credit facility. For commodity contracts, our counterparties could require collateral posted in an amount determined by our credit ratings. The fair value of foreign exchange and commodity contracts that have credit-risk-related contingent features that are in a net liability position at June 30, 2013 was $12. At June 30, 2013, there was no collateral posted related to our derivatives.
Note 16 – Fair Value Measurements
The following table presents our assets and liabilities that are measured at fair value on a recurring basis and are categorized using the fair value hierarchy. The fair value hierarchy has three levels based on the reliability of the inputs used to determine fair value. Level 1 refers to fair values determined based on quoted prices in active markets for identical assets. Level 2 refers to fair values estimated using significant other observable inputs and Level 3 includes fair values estimated using significant unobservable inputs. 

June 30, 2013
 
December 31, 2012

Total

 
Level 1

 
Level 2

 
Level 3

 
Total

 
Level 1

 
Level 2

 
Level 3

Assets
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Money market funds

$3,411

 

$3,411

 
 
 
 
 

$4,534

 

$4,534

 
 
 
 
Available-for-sale investments
7

 
5

 
 
 

$2

 
9

 
6

 
 
 

$3

Derivatives
93

 
 
 

$93

 
 
 
178

 
 
 

$178

 
 
Total assets

$3,511

 

$3,416

 

$93

 

$2

 

$4,721

 

$4,540

 

$178

 

$3

Liabilities
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Derivatives

($112
)
 
 
 

($112
)
 
 
 

($84
)
 
 
 

($84
)
 
 
Total liabilities

($112
)
 

 

($112
)
 

 

($84
)
 

 

($84
)
 

Money market funds and available-for-sale equity securities are valued using a market approach based on the quoted market prices of identical instruments. Available-for-sale debt investments are primarily valued using an income approach based on benchmark yields, reported trades and broker/dealer quotes.
Derivatives include foreign currency, commodity and interest rate contracts. Our foreign currency forward contracts are valued using an income approach based on the present value of the forward rate less the contract rate multiplied by the notional amount. Commodity derivatives are valued using an income approach based on the present value of the commodity index prices less the contract rate multiplied by the notional amount. The fair value of our interest rate swaps is derived from a discounted cash flow analysis based on the terms of the contract and the interest rate curve.
Certain assets have been measured at fair value on a nonrecurring basis using significant unobservable inputs (Level 3). The following table presents the nonrecurring losses recognized for the six months ended June 30 and the fair value and asset classification of the related assets as of the impairment date:
  
2013
 
2012
 
Fair
Value

 
Total
Losses

 
Fair
Value

 
Total
Losses

Operating lease equipment

$28

 

($21
)
 

$25

 

($31
)
Property, plant and equipment
6

 
(5
)
 
18

 
(5
)
Total

$34

 

($26
)
 

$43

 

($36
)

21

Table of Contents

The fair value of the impaired equipment under operating lease is derived by calculating a median collateral value from a consistent group of third party aircraft value publications. The values provided by the third party aircraft publications are derived from their knowledge of market trades and other market factors. Management reviews the publications quarterly to assess the continued appropriateness and consistency with market trends. Under certain circumstances, we adjust values based on the attributes and condition of the specific aircraft or equipment, usually when the features or use of the aircraft vary significantly from the more generic aircraft attributes covered by third party publications, or on the expected net sales price for the aircraft. Property, plant and equipment was primarily valued using an income approach based on the discounted cash flows associated with the underlying assets.
For Level 3 assets that were measured at fair value on a nonrecurring basis during the six months ended June 30, 2013, the following table presents the fair value of those assets as of the measurement date, valuation techniques and related unobservable inputs of those assets.
 
Fair
Value
 
Valuation
Technique(s)
 
Unobservable Input
 
Range
Median or Average
Operating lease equipment
$28
 
Market approach
 
Aircraft value publications
 
$18 - $34(1)
Median $30
 
 
Aircraft condition adjustments
 
($7) - $5(2)
Net ($2)
(1) 
The range represents the sum of the highest and lowest values for all aircraft subject to fair value measurement, according to the third party aircraft valuation publications that we use in our valuation process.
(2) 
The negative amount represents the sum for all aircraft subject to fair value measurement, of all downward adjustments based on consideration of individual aircraft attributes and condition. The positive amount represents the sum of all such upward adjustments.
Fair Value Disclosures
The fair values and related carrying values of financial instruments that are not required to be remeasured at fair value on the Condensed Consolidated Statements of Financial Position were as follows:
 
June 30, 2013
 
Carrying
Amount

Total Fair
Value

Level 1
Level 2

Level 3

Assets
 
 
 
 
 
Accounts receivable, net

$6,406


$6,383

 

$6,383

 
Notes receivable, net
592

645

 
645

 
Liabilities
 
 
 
 
 
Debt, excluding capital lease obligations
(9,436
)
(10,946
)
 
(10,899
)

($47
)
 
December 31, 2012
 
Carrying
Amount

Total Fair
Value

Level 1
Level 2
Level 3
Assets
 
 
 
 
 
Accounts receivable, net

$5,608


$5,642

 

$5,642

 
Notes receivable, net
571

632

 
632

 
Liabilities
 
 
 
 
 
Debt, excluding capital lease obligations
(10,231
)
(12,269
)
 
(12,221
)

($48
)
The fair value of Accounts receivable is based on current market rates for loans of the same risk and maturities. The fair values of our variable rate notes receivable that reprice frequently approximate their carrying

22

Table of Contents

amounts. The fair values of fixed rate notes receivable are estimated with discounted cash flow analysis using interest rates currently offered on loans with similar terms to borrowers of similar credit quality. The fair value of our debt that is traded in the secondary market is classified as Level 2 and is based on current market yields. For our debt that is not traded in the secondary market, the fair value is classified as Level 2 and is based on our indicative borrowing cost derived from dealer quotes or discounted cash flows. The fair value of our debt classified as Level 3 is based on the median of the underlying collateral value as described above. With regard to other financial instruments with off-balance sheet risk, it is not practicable to estimate the fair value of our indemnifications because the amount and timing of those arrangements are uncertain. Items not included in the above disclosures include cash, restricted cash, time deposits and other deposits, commercial paper, money market funds, Accounts payable and long-term payables. The carrying values of those items, as reflected in the Condensed Consolidated Statements of Financial Position, approximate their fair value at June 30, 2013 and December 31, 2012. The fair value of assets and liabilities whose carrying value approximates fair value is determined using Level 2 inputs, with the exception of cash (Level 1).
Note 17 – Legal Proceedings
Various legal proceedings, claims and investigations related to products, contracts and other matters are pending against us. Potentially material contingencies including A-12 and Employment, Labor and Benefits litigation are discussed below.
We are subject to various U.S. government investigations, from which civil, criminal or administrative proceedings could result or have resulted. Such proceedings involve or could involve claims by the government for fines, penalties, compensatory and treble damages, restitution and/or forfeitures. Under government regulations, a company, or one or more of its operating divisions or subdivisions, can also be suspended or debarred from government contracts, or lose its export privileges, based on the results of investigations. We believe, based upon current information, that the outcome of any such government disputes and investigations will not have a material effect on our financial position, results of operations, or cash flows, except as set forth below. Where it is reasonably possible that we will incur losses in excess of recorded amounts in connection with any of the matters set forth below, we have disclosed either the amount or range of reasonably possible losses in excess of such amounts or, where no such amount or range can be reasonably estimated, the reasons why no such estimate can be made.
A-12 Litigation
In 1991, the Department of the Navy (the Navy) notified McDonnell Douglas Corporation (now merged into The Boeing Company) and General Dynamics Corporation (together, the Team) that it was terminating for default the Team’s contract for development and initial production of the A-12 aircraft.
The Team had full responsibility for performance of the contract and both contractors are jointly and severally liable for any potential liabilities resulting from the termination. The Team filed a legal action to contest the Navy’s default termination, to assert its rights to convert the termination to one for “the convenience of the government,” and to obtain payment for work done and costs incurred on the A-12 contract but not paid to date. As of June 30, 2013, inventories included approximately $587 of recorded costs on the A-12 contract, against which we have established a loss provision of $350. The amount of the provision, which was established in 1990, was based on McDonnell Douglas Corporation’s belief, supported by an opinion of outside counsel, that the termination for default would be converted to a termination for convenience, and that the best estimate of possible loss on termination for convenience was $350.
The U.S. Court of Federal Claims held that the default termination decision could not be sustained and on March 31, 1998, awarded the Team $1,200 in unreimbursed costs. The Court of Appeals for the Federal Circuit reversed in July 1999 and remanded the case back to the trial court to determine whether the Team was in fact in default. On August 31, 2001, the U.S. Court of Federal Claims issued a decision after trial upholding the government’s default termination of the A-12 contract. In 2003, the Court of Appeals for the Federal Circuit, finding that the trial court had applied the wrong legal standard, vacated the trial court’s 2001 decision and ordered the case sent back to the trial court for further proceedings. On May 3, 2007, the U.S. Court of Federal Claims issued a decision upholding the government’s default termination of the A-12 contract.

23

Table of Contents

We filed a Notice of Appeal on May 4, 2007 with the Court of Appeals for the Federal Circuit. On June 2, 2009, the Court of Appeals rendered an opinion affirming the trial court’s 2007 decision sustaining the government’s default termination. On May 23, 2011, the U.S. Supreme Court vacated the decision of the Court of Appeals upholding the default termination, and remanded the case to the Court of Appeals. On July 7, 2011, the Court of Appeals remanded the case to the trial court for additional factual determinations and the trial court heard oral argument on May 7, 2013. On December 29, 2009, the Navy sent letters to the Team requesting payment of $1,352 in unliquidated progress payments, plus applicable interest. On November 15, 2011, the Navy sent a letter confirming that it would not pursue payment from the Team pending all trial court and appellate proceedings adjudicating the issues remanded by the Supreme Court.
On May 17, 2013, the President's Fiscal 2014 Budget Request to Congress included a new Department of Defense General Provision that would authorize the Secretary of the Navy to receive and retain payment in-kind in settlement of the A-12 aircraft litigation. If this legislation is enacted and the litigation is settled, we could incur a pre-tax charge to write-off A-12 costs included in inventory in addition to costs associated with an in-kind settlement. We believe it is reasonably possible that the litigation could be settled.
We believe that the termination for default is contrary to law and fact and that the loss provision established by McDonnell Douglas Corporation in 1990, which was supported by an opinion from outside counsel, continues to provide adequately for the reasonably possible reduction in value of A-12 net contracts in process as of June 30, 2013. Final resolution of the A-12 litigation will depend on whether the litigation is settled or the outcome of further proceedings. If after all legal proceedings are concluded, the court determines, contrary to our belief, that a termination for default was appropriate, we could incur an additional loss of up to $275, consisting principally of $237 of remaining inventory costs. If the courts further hold that a money judgment should be entered against the Team, we could be required to pay the U.S. government up to one-half of the unliquidated progress payments of $1,350 plus statutory interest from February 1991 (currently totaling up to $1,595). In that event, our loss would total approximately $1,745 in pre-tax charges. Should, however, the March 31, 1998 judgment of the U.S. Court of Federal Claims in favor of the Team be reinstated, we could be entitled to receive payment of approximately $1,191, including interest from June 26, 1991.
Employment, Labor and Benefits Litigation
In connection with the 2005 sale of our former Wichita facility to Spirit AeroSystems, Inc. (Spirit), certain individuals not hired by Spirit alleged that Spirit’s hiring decisions following the sale were tainted by age discrimination, violated ERISA, violated our collective bargaining agreements, and constituted retaliation. The case was brought in 2006 as a class action on behalf of individuals not hired by Spirit. In 2012, the Tenth Circuit Court of Appeals affirmed the district court's 2010 summary judgment in favor of Boeing and Spirit on all class action claims, but the parties were not precluded from making claims on an individual basis. As of June 30, 2013, eighty-nine individuals have asserted individual claims related to this matter. Spirit has agreed to indemnify Boeing for any and all losses.
Also related to the 2005 sale of the former Wichita facility, on February 16, 2007, an action entitled Harkness et al. v. The Boeing Company et al. was filed in the U.S. District Court for the District of Kansas, alleging collective bargaining agreement breaches and ERISA violations in connection with alleged failures to provide benefits to certain former employees of the Wichita facility. On December 11, 2012 the court denied plaintiffs motion for summary judgment and granted Boeings motion for summary judgment on plaintiffs claim that amendment of The Boeing Company Employee Retirement Plan violated the IAM collective bargaining agreement, as well as individual ERISA §510 claims for interference with benefits. The court denied Boeings motion for all other claims. The parties are preparing to conduct additional discovery in anticipation of further court proceedings, which have not yet been scheduled. We believe that Spirit is obligated to indemnify Boeing for any and all losses in this matter, although to date Spirit has acknowledged a limited indemnification obligation. We currently estimate that the putative class includes 2,000 former Wichita employees. We cannot reasonably estimate the range of loss, if any, that may result from both these matters given the current procedural status of the litigation.

24

Table of Contents

On October 13, 2006, we were named as a defendant in a lawsuit filed in the U.S. District Court for the Southern District of Illinois. Plaintiffs, seeking to represent a class of similarly situated participants and beneficiaries in The Boeing Company Voluntary Investment Plan (the VIP), alleged that fees and expenses incurred by the VIP were and are unreasonable and excessive, not incurred solely for the benefit of the VIP and its participants, and were undisclosed to participants. The plaintiffs further alleged that defendants breached their fiduciary duties in violation of §502(a)(2) of ERISA, and sought injunctive and equitable relief pursuant to §502(a)(3) of ERISA. During the first quarter of 2010, the Seventh Circuit Court of Appeals granted a stay of trial proceedings in the district court pending resolution of an appeal made by Boeing in 2008 to the case’s class certification order. On January 21, 2011, the Seventh Circuit reversed the district court’s class certification order and decertified the class. The Seventh Circuit remanded the case to the district court for further proceedings. On March 2, 2011, plaintiffs filed an amended motion for class certification and a supplemental motion on August 7, 2011. Boeing’s opposition to class certification was filed on September 6, 2011. Plaintiffs’ reply brief in support of class certification was filed on September 27, 2011. The court has stated its intent to issue rulings on the amended motion for class certification and the alternative motion to proceed as a direct action for breach of fiduciary duty and then stay the case until it is determined if an appeal of the class certification order is filed. As a result, on September 19, 2012 the district court issued an order denying Boeings motions for summary judgment as premature pending class determination. We cannot reasonably estimate the range of loss, if any, that may result from this matter given the current procedural status of the litigation.
Note 18 – Segment Information
Effective January 1, 2013, certain programs were realigned among BDS segments. Business segment data for all periods presented have been adjusted to reflect the realignment. Effective January 1, 2013, BCC's accounting policies for certain leasing transactions were aligned with Boeing's consolidated accounting policies. Segment information previously reported has been adjusted to reflect this change. The resulting adjustments affected the BCC and Other segments as well as consolidated amounts reported for Boeing Capital interest expense, Earnings from operations, and Interest and debt expense.
Our primary profitability measurements to review a segment’s operating results are Earnings from operations and operating margins. See page 6 for a Summary of Business Segment Data, which is an integral part of this note.
Intersegment revenues, eliminated in Unallocated items and eliminations, are shown in the following table.
 
Six months ended June 30
 
Three months ended June 30
 
2013

 
2012

 
2013

 
2012

Commercial Airplanes

$563

 

$344

 

$368

 

$216

Boeing Capital
17

 
27

 
8

 
15

Total

$580

 

$371

 

$376

 

$231

Other segment's Loss from operations related to support provided to BCC was $30 and $18 during the six and three months ended June 30, 2013 and $62 and $24 for the same periods in the prior year.
Unallocated items and eliminations includes costs not attributable to business segments as well as intercompany profit eliminations. We generally allocate costs to business segments based on the U.S. federal cost accounting standards. Unallocated pension and other postretirement expense represents the portion of pension and other postretirement costs that are not recognized by business segments for segment reporting purposes. The business segments have traditionally been allocated pension and other postretirement costs using U.S. Government Cost Accounting Standards (CAS), which employ different actuarial assumptions and accounting conventions than Generally Accepted Accounting Principles in the United States of America (GAAP). Beginning in 2013, pension costs, comprising GAAP service and prior service costs, are allocated to Commercial Airplanes. BDS continues to be allocated CAS pension costs which are allocable to government contracts. Other postretirement costs will continue to be allocated to business segments based

25

Table of Contents

on CAS, which is generally based on benefits paid. Prior year allocations have not been adjusted. Components of Unallocated items and eliminations are shown in the following table.
 
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Share-based plans

($53
)
 

($41
)
 

($22
)
 

($19
)
Deferred compensation
(102
)
 
(34
)
 
(46
)
 
2

Capitalized interest
(34
)
 
(37
)
 
(17
)
 
(16
)
Eliminations and other
(158
)
 
(39
)
 
(92
)
 
(114
)
Sub-total
(347
)
 
(151
)
 
(177
)
 
(147
)
Pension
(689
)
 
(404
)
 
(331
)
 
(215
)
Postretirement
38

 
(49
)
 
19

 
(30
)
Pension and Postretirement
(651
)
 
(453
)
 
(312
)
 
(245
)
Total

($998
)
 

($604
)
 

($489
)
 

($392
)
Segment assets are summarized in the table below:
 
June 30
2013

 
December 31
2012

Commercial Airplanes

$45,593

 

$41,769

Defense, Space & Security:
 
 
 
Boeing Military Aircraft
6,363

 
6,582

Network & Space Systems
6,512

 
6,669

Global Services & Support
3,898

 
3,692

Total Defense, Space & Security
16,773

 
16,943

Boeing Capital
4,173

 
4,347

Other segment
1,116

 
1,043

Unallocated items and eliminations
24,436

 
24,794

Total

$92,091

 

$88,896

Assets included in Unallocated items and eliminations primarily consist of Cash and cash equivalents, Short-term and other investments, Deferred tax assets, capitalized interest and assets held by SSG as well as intercompany eliminations.

26

Table of Contents

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Shareholders of
The Boeing Company
Chicago, Illinois
We have reviewed the accompanying condensed consolidated statement of financial position of The Boeing Company and subsidiaries (the “Company”) as of June 30, 2013, the related condensed consolidated statements of operations and comprehensive income for the three-month and six-month periods ended June 30, 2013 and 2012, and the related condensed consolidated statements of cash flows and equity for the six-month periods ended June 30, 2013 and 2012. These interim financial statements are the responsibility of the Company’s management.
We conducted our reviews in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board (United States), the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.
Based on our reviews, we are not aware of any material modifications that should be made to such condensed consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.
We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated statement of financial position of the Company as of December 31, 2012, and the related consolidated statements of operations, comprehensive income, equity, and cash flows for the year then ended (not presented herein); and in our report dated February 11, 2013, we expressed an unqualified opinion on those consolidated financial statements and included an explanatory paragraph relating to the Company's retrospective adoption during the year ended December 31, 2012 of new accounting guidance related to the presentation of comprehensive income. In our opinion, the information set forth in the accompanying condensed consolidated statement of financial position as of December 31, 2012 is fairly stated, in all material respects, in relation to the consolidated statement of financial position from which it has been derived.


/s/ DELOITTE & TOUCHE LLP
Chicago, Illinois
July 24, 2013

27

Table of Contents

FORWARD-LOOKING STATEMENTS
This report contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Words such as “may,” “should,” “expects,” “intends,” “projects,” “plans,” “believes,” “estimates,” “targets,” “anticipates” and similar expressions are used to identify these forward-looking statements. Examples of forward-looking statements include statements relating to our future financial condition and operating results, as well as any other statement that does not directly relate to any historical or current fact.
 
 
Forward-looking statements are based on our current expectations and assumptions, which may not prove to be accurate. These statements are not guarantees and are subject to risks, uncertainties and changes in circumstances that are difficult to predict. Many factors could cause actual results to differ materially and adversely from these forward-looking statements. Among these factors are risks related to:
 
 
(1)
general conditions in the economy and our industry, including those due to regulatory changes;
 
 
(2)
our reliance on our commercial airline customers;
 
 
(3)
the overall health of our aircraft production system, planned production rate increases across multiple commercial airline programs, our commercial development and derivative aircraft programs, and our aircraft being subject to stringent performance and reliability standards;
 
 
(4)
changing acquisition priorities of the U.S. government;
 
 
(5)
our dependence on U.S. government contracts;
 
 
(6)
our reliance on fixed-price contracts;
 
 
(7)
our reliance on cost-type contracts;
 
 
(8)
uncertainties concerning contracts that include in-orbit incentive payments;
 
 
(9)
our dependence on our subcontractors and suppliers as well as the availability of raw materials;
 
 
(10)
changes in accounting estimates;
 
 
(11)
changes in the competitive landscape in our markets;
 
 
(12)
our non-U.S. operations, including sales to non-U.S. customers;
 
 
(13)
potential adverse developments in new or pending litigation and/or government investigations;
 
 
(14)
customer and aircraft concentration in Boeing Capital’s customer financing portfolio;
 
 
(15)
changes in our ability to obtain debt on commercially reasonable terms and at competitive rates in order to fund our operations and contractual commitments;
 
 
(16)
realizing the anticipated benefits of mergers, acquisitions, joint ventures, strategic alliances or divestitures;
 
 
(17)
the adequacy of our insurance coverage to cover significant risk exposures;

28

Table of Contents

(18)
potential business disruptions, including those related to physical security threats, information technology or cyber attacks or natural disasters;
 
 
(19)
work stoppages or other labor disruptions;
 
 
(20)
significant changes in discount rates and actual investment return on pension assets;
 
 
(21)
potential environmental liabilities; and
 
 
(22)
threats to the security of our or our customers’ information.
 
 
Additional information concerning these and other factors can be found in our filings with the Securities and Exchange Commission, including the “Risk Factors” on pages 6 through 15 of our most recent Annual Report on Form 10-K, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and Notes 9, 10, and 17 to our Condensed Consolidated Financial Statements included in this Quarterly Report on Form 10-Q and Current Reports on Form 8-K. Any forward-looking information speaks only as of the date on which it is made, and we assume no obligation to update or revise any forward-looking statement whether as a result of new information, future events or otherwise, except as required by law.
 
 
 
 
 
 
 
 
 
 

29

Table of Contents

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
Consolidated Operating Results
Earnings From Operations and Core Operating Earnings (Non-GAAP)
The following table summarizes key indicators of consolidated results of operations:
(Dollars in millions, except per share data)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$40,708

 

$39,388

 

$21,815

 

$20,005

 
 
 
 
 
 
 
 
GAAP
 
 
 
 
 
 
 
Earnings from operations

$3,244

 

$3,107

 

$1,716

 

$1,542

Operating margins
8.0
%
 
7.9
%
 
7.9
%
 
7.7
%
Effective income tax rate
28.6
%
 
35.0
%
 
33.4
%
 
33.1
%
Net earnings from continuing operations

$2,193

 

$1,891

 

$1,087

 

$967

Diluted earnings per share

$2.85

 

$2.49

 

$1.41

 

$1.27

 
 
 
 
 
 
 
 
Non-GAAP (1)
 
 
 
 
 
 
 
Core operating earnings

$3,895

 

$3,560

 

$2,028

 

$1,787

Core operating margin
9.6
%
 
9.0
%
 
9.3
%
 
8.9
%
Core earnings per share

$3.40

 

$2.88

 

$1.67

 

$1.48

(1) 
These measures exclude certain components of pension and postretirement benefit expense. See pages 46 - 47 for important information about these non-GAAP measures and reconciliations to the most comparable GAAP measures.
Revenues
The following table summarizes revenues:
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Commercial Airplanes

$24,314

 

$22,780

 

$13,624

 

$11,843

Defense, Space & Security
16,296

 
16,425

 
8,186

 
8,192

Boeing Capital
209

 
238

 
104

 
113

Other segment
54

 
52

 
27

 
28

Unallocated items and eliminations
(165
)
 
(107
)
 
(126
)
 
(171
)
Total

$40,708

 

$39,388

 

$21,815

 

$20,005

Revenues for the six and three months ended June 30, 2013 increased by $1,320 million and $1,810 million, or 3% and 9%, compared with the same periods in 2012. Commercial Airplanes revenues increased by $1,534 million and $1,781 million, or 7% and 15%, due to higher new airplane deliveries partially offset by lower commercial aviation services spares revenue. Defense, Space & Security (BDS) revenues for the six and three months ended June 30, 2013 decreased by $129 million and $6 million. The six-month decrease was due to lower revenues in the Boeing Military Aircraft (BMA) and Global Service & Support (GS&S) segments, partially offset by higher revenues in the Network & Space Systems (N&SS) segment. The three-month decrease was due to lower revenues in the BMA segment, offset by higher revenues in the N&SS and GS&S segments.

30

Table of Contents

Earnings From Operations
The following table summarizes Earnings from operations:
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Commercial Airplanes

$2,672

 

$2,292

 

$1,453

 

$1,211

Defense, Space & Security
1,608

 
1,490

 
776

 
748

Boeing Capital
63

 
72

 
19

 
39

Other segment
(101
)
 
(143
)
 
(43
)
 
(64
)
Unallocated pension/postretirement expense
(651
)
 
(453
)
 
(312
)
 
(245
)
Other unallocated items and eliminations
(347
)
 
(151
)
 
(177
)
 
(147
)
Earnings from operations (GAAP)

$3,244

 

$3,107

 

$1,716

 

$1,542

Unallocated pension/postretirement expense
651

 
453

 
312

 
245

Core operating earnings (Non-GAAP)

$3,895

 

$3,560

 

$2,028

 

$1,787

Earnings from operations for the six and three months ended June 30, 2013 increased by $137 million and $174 million compared with the same periods in 2012 primarily reflecting higher earnings at Commercial Airplanes that more than offset higher pension costs in 2013. In addition, the increase in the six-month period was partially offset by a $121 million benefit recorded in 2012 from a favorable litigation resolution.
Core operating earnings for the six and three months ended June 30, 2013 increased by $335 million and $241 million compared with the same periods in 2012 due to higher earnings at Commercial Airplanes. The increase in the six-month period was offset by the 2012 benefit related to a favorable litigation resolution.
For the six and three months ended June 30, 2013, Commercial Airplanes earnings increased by $380 million and $242 million compared to the same periods in 2012 reflecting higher airplane deliveries and lower research and development expense. BDS earnings increased by $118 million and $28 million reflecting higher earnings in all three BDS segments.
Research and Development The following table summarizes our research and development expense:
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Commercial Airplanes

$865

 

$1,104

 

$446

 

$560

Defense, Space & Security
579

 
562

 
307

 
281

Other
24

 
26

 
10

 
16

Research and development expense, net

$1,468

 

$1,692

 

$763

 

$857

Research and development expense for the six and three months ended June 30, 2013 decreased by $224 million and $94 million compared with the same periods in 2012 primarily due to lower spending at BCA on the 787 program partially offset by increased spending on the 737 program.

31

Table of Contents

Unallocated Items and Eliminations The most significant items included in Unallocated items and eliminations are shown in the following table:
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Share-based plans

($53
)
 

($41
)
 

($22
)
 

($19
)
Deferred compensation
(102
)
 
(34
)
 
(46
)
 
2

Eliminations and other
(192
)
 
(76
)
 
(109
)
 
(130
)
Sub-total (included in core operating earnings*)
(347
)
 
(151
)
 
(177
)
 
(147
)
Pension
(689
)
 
(404
)
 
(331
)
 
(215
)
Postretirement
38

 
(49
)
 
19

 
(30
)
Pension and Postretirement (excluded from core operating earnings*)
(651
)
 
(453
)
 
(312
)
 
(245
)
Total

($998
)
 

($604
)
 

($489
)
 

($392
)
* Core operating earnings is a Non-GAAP measure that excludes certain components of pension and postretirement benefit expense. See pages 46 - 47.
Deferred compensation expense increased by $68 million and $48 million for the six and three months ended June 30, 2013 compared with the same periods in 2012, primarily driven by changes in our stock price.
Eliminations and other unallocated items expense for the six months ended June 30, 2013 increased by $116 million compared with the same period in 2012 primarily due to a $121 million benefit related to a favorable court judgment on satellite litigation in the first quarter of 2012.
We recorded net periodic benefit cost related to pensions and other postretirement benefits of $1,887 million and $933 million for the six and three months ended June 30, 2013 and $1,684 million and $841 million for the same periods in 2012. The increase in net periodic benefit costs related to pension plans is primarily due to higher amortization of actuarial losses driven by lower discount rates.
A portion of net periodic benefit cost is recognized as product costs in Earnings from operations in the period incurred and the remainder is included in inventory at the end of the reporting period and recorded in Earnings from operations in subsequent periods. Costs are allocated to the business segments as described in Note 18.
Net periodic benefit costs included in Earnings from operations were as follows:
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30
Pension Plans
2013

 
2012

 
2013

 
2012

Allocated to business segments

($855
)
 

($844
)
 

($422
)
 

($378
)
Other unallocated items and eliminations
(689
)
 
(404
)
 
(331
)
 
(215
)
Total

($1,544
)
 

($1,248
)
 

($753
)
 

($593
)
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30
Other Postretirement Plans
2013

 
2012

 
2013

 
2012

Allocated to business segments

($217
)
 

($233
)
 

($107
)
 

($103
)
Other unallocated items and eliminations
38

 
(49
)
 
19

 
(30
)
Total

($179
)
 

($282
)
 

($88
)
 

($133
)

32

Table of Contents

Other Earnings Items 
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Earnings from operations

$3,244

 

$3,107

 

$1,716

 

$1,542

Other income, net
22

 
22

 
13

 
10

Interest and debt expense
(195
)
 
(220
)
 
(96
)
 
(106
)
Earnings before income taxes
3,071

 
2,909

 
1,633

 
1,446

Income tax expense
(878
)
 
(1,018
)
 
(546
)
 
(479
)
Net earnings from continuing operations

$2,193

 

$1,891

 

$1,087

 

$967

Interest and debt expense for the six months ended June 30, 2013 decreased by $25 million when compared with the same period in 2012 due to a lower weighted average debt balance.
Our effective income tax rates were 28.6% and 35.0% for the six months ended June 30, 2013 and 2012 and largely unchanged for the three months ended June 30, 2013 compared to the same period in the prior year. The effective tax rate for the six months ended June 30, 2013 is lower than the comparable prior year period primarily due to the retroactive reinstatement of the 2012 U.S. research and development tax credit which reduced income tax expense by $145 million for the six months ended June 30, 2013.
For additional discussion related to Income Taxes, see Note 3 to our Condensed Consolidated Financial Statements.
Backlog
(Dollars in millions)
June 30
2013

 
December 31
2012

Total contractual backlog

$389,231

 

$372,355

Unobligated backlog
21,116

 
17,873

Contractual backlog of unfilled orders excludes purchase options, announced orders for which definitive contracts have not been executed, and unobligated U.S. and non-U.S. government contract funding. The increase in contractual backlog during the six months ended June 30, 2013 compared with December 31, 2012 was primarily due to commercial airplane orders in excess of deliveries partially offset by cancellation of orders.
Unobligated backlog includes U.S. and non-U.S. government definitive contracts for which funding has not been authorized. The increase in unobligated backlog during the six months ended June 30, 2013 was primarily due to CH-47 Chinook and V-22 Osprey multi-year contract orders.
Additional Considerations
KC-46A Tanker In February 2011, we were awarded a contract from the USAF to design, develop, manufacture and deliver 4 next generation aerial refueling tankers. The KC-46A Tanker will be a derivative of our 767 commercial aircraft. This contract is a fixed-price incentive firm contract valued at $4.9 billion and involves highly complex designs and systems integration. Changes to our estimated cost to perform the work could result in a material charge. This contract contains production options. If all options under the contract are exercised, we expect to deliver 179 aircraft for a total expected contract value of approximately $30 billion. For segment reporting purposes, backlog, revenues and costs are recorded in the Commercial Airplanes and BMA segments.

33

Table of Contents

Segment Results of Operations
Commercial Airplanes
Business Environment and Trends
Airline Industry Environment Net profits for the global airline industry are now forecast to total $13 billion in 2013 compared to $8 billion in 2012. Industry risk remains due to ongoing economic and political uncertainty.
Our 20-year forecast is for a long-term average growth rate of 5% per year for passenger and cargo traffic, based on a projected average annual worldwide real economic growth rate of 3%. We project a $4.8 trillion market for over 35,000 new airplanes over the next 20 years based on long-term global economic growth projections, and factoring in increased utilization of the worldwide airplane fleet and requirements to replace older airplanes.
Operating Results
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$24,314

 

$22,780

 

$13,624



$11,843

Earnings from operations

$2,672

 

$2,292

 

$1,453



$1,211

Operating margins
11.0
%
 
10.1
%
 
10.7
%
 
10.2
%
(Dollars in millions)
June 30
2013

 
December 31
2012

Contractual backlog

$337,691

 

$317,287

Unobligated backlog
1,187

 
1,466

Revenues
Revenues for the six and three months ended June 30, 2013 increased by $1,534 million and $1,781 million or 7% and 15% compared with the same periods of 2012 due to higher new airplane deliveries.
Commercial jet aircraft deliveries, including intercompany deliveries, were as follows:

737

 
747

 
767

 
777

 
787

 
Total

Deliveries during the first six months of 2013
218

 
12

 
12

 
47

 
17

(1) 
306

Deliveries during the first six months of 2012
208

 
13

 
13

 
42

 
11

 
287

Deliveries during the second quarter of 2013
116

 
6

 
8

 
23

 
16

(1) 
169

Deliveries during the second quarter of 2012
109

 
7

 
6

 
22

 
6

 
150

Cumulative deliveries as of 6/30/2013
4,511

 
1,470

 
1,052

 
1,113

 
66

 
 
Cumulative deliveries as of 12/31/2012
4,293

 
1,458

 
1,040

 
1,066

 
49

 
 
(1) 
Includes one aircraft accounted for as revenue by BCA and as an operating lease in consolidation.

34

Table of Contents

Earnings From Operations
Earnings from operations for the six months ended June 30, 2013 increased by $380 million compared with the same period of 2012. Increased earnings of $272 million were driven primarily by higher new airplane deliveries and lower research and development cost of $239 million due to lower spending on the 787 program partially offset by increased spending on the 737 program. Earnings were reduced by $131 million primarily driven by higher period costs reflecting 787 engineering support costs related to the battery system and other costs associated with business growth. Operating margins increased by 0.9 percentage points to 11.0% primarily due to lower research and development cost.
Earnings from operations for the three months ended June 30, 2013 increased by $242 million compared with the same period of 2012. Increased earnings of $128 million were driven primarily by higher new airplane deliveries and lower research and development cost of $114 million due to lower spending on the 787 program partially offset by increased spending on the 737 program. Operating margins increased by 0.5 percentage points to 10.7% primarily due to lower research and development cost and higher deliveries partially offset by the dilutive impact of 787 deliveries.
Backlog
The increase in contractual backlog during the six months ended June 30, 2013 was due to orders in excess of deliveries partially reduced by cancellation of orders. A number of our customers may have contractual remedies that may be implicated by program delays. We continue to address customer claims and requests for other contractual relief as they arise. However, once orders are included in firm backlog they remain in backlog until canceled or fulfilled, although the value of orders is adjusted as changes to price and schedule are agreed to with customers.
Accounting Quantity
The following table provides details of the accounting quantities and firm orders by program. Cumulative firm orders represent the cumulative number of commercial jet aircraft deliveries plus undelivered firm orders.
 
Program
As of 6/30/2013
737

 
747

 
767

 
777

 
787

Program accounting quantities
6,800

 
1,574

 
1,103

 
1,450

 
1,100

Undelivered units under firm orders
3,445

 
53

 
56

 
339

 
864

Cumulative firm orders
7,956

 
1,523

 
1,108

 
1,452

 
930

 
Program
As of 12/31/2012
737

 
747

 
767

 
777

 
787

Program accounting quantities
6,600

 
1,574

 
1,103

 
1,450

 
1,100

Undelivered units under firm orders
3,074

 
67

 
68

 
365

 
799

Cumulative firm orders
7,367

 
1,525

 
1,108

 
1,431

 
848

737 Program The accounting quantity for the 737 program increased by 200 for the three months ended June 30, 2013 due to the program's normal progress of obtaining additional orders and delivering airplanes. We increased our production rate from 35 to 38 per month in the first quarter of 2013 and a further increase to 42 per month is planned for 2014. First delivery of the 737 MAX is expected in 2017.
747 Program In April 2013, we announced that the production rate would be decreased from 2 to 1.75 per month in January 2014. Continued weakness in the air cargo market and lower-than-expected demand for large commercial passenger aircraft have resulted in pricing pressures and fewer orders than anticipated. We continue to have a number of unsold Freighter and Intercontinental production positions beyond 2013. If we are unable to obtain orders for multiple Freighter aircraft in 2013 consistent with our near-term production plans, we may be required to take actions including further reducing the production rate and/or building airplanes for which we have not received firm orders. We also remain focused on reducing out-of-sequence

35

Table of Contents

work, improving supply chain efficiency and implementing cost-reduction efforts. If market and production risks cannot be mitigated, the program could face an additional reach-forward loss that may be material.
767 Program As we reconfigure the 767 assembly line to include a 767 derivative to support the Tanker program, we began the process of decreasing our production rate from 2 to 1 per month, with completion expected during the third quarter of 2013. We then expect to increase the rate to 1.5 per month in 2014 and back to 2 per month in 2016.
777 Program We increased our production rate from 7 to 8.3 per month in the first quarter of 2013.
787 Program During the second quarter, we installed a comprehensive set of battery system improvements on 50 previously-delivered 787 airplanes and resumed 787 deliveries to customers. These improvements addressed the battery-related incidents identified in January 2013 which resulted in the suspension of 787 deliveries in the first quarter.
In May 2013, we achieved a production rate of 7 aircraft per month in final assembly and the first 787-9 began final assembly. We continue to expect to increase the production rate of 787 aircraft to 10 per month in final assembly by the end of 2013 with first deliveries occurring at that rate in early 2014. Production of the 787-9 continues to be on schedule and we expect the first customer delivery to occur in mid-2014. In June 2013, we announced the launch of the 787-10 derivative aircraft with first delivery targeted for 2018.
We continue to incorporate engineering and other design changes identified during flight testing into already completed aircraft at our Everett modification center. We also remain focused on achieving planned increases in 787 production rates while continuing to satisfy customer mission and performance requirements. We continue to monitor and address challenges associated with aircraft production and assembly, including management of our manufacturing operations and extended global supply chain, completion and integration of traveled work, as well as introduction of the 787-9 derivative into the manufacturing process. In addition, we continue to work with our customers and suppliers to assess the specific impacts of schedule changes, including requests for contractual relief related to delivery delays and supplier assertions.
During 2009, we concluded that the first three flight-test 787 aircraft could not be sold as previously anticipated due to the inordinate amount of rework and unique and extensive modifications made to those aircraft. As a result, costs associated with these airplanes were included in research and development expense. During the fourth quarter of 2012 we finalized an order for one of the three remaining flight test aircraft. We continue to believe that the other two 787 flight-test aircraft are commercially saleable and we continue to include costs related to those airplanes in program inventory at June 30, 2013. If we determine that either of the remaining aircraft cannot be sold, we may incur additional charges.
The accounting quantity of 1,100 units remains unchanged and represents approximately 10 years of production at planned production rates. The launch of the 787-10 did not result in any adjustments to the accounting quantity, revenue or cost estimates during the second quarter, although we expect 787-10 aircraft to be incorporated in these estimates in future quarters. The cumulative impacts of production challenges, change incorporation, schedule delays and customer and supplier impacts have created significant pressure on program profitability. If risks related to this program, including risks associated with planned production rate increases, or introducing the 787-9 and 787-10 derivatives as scheduled cannot be mitigated, the program could face additional customer claims and/or supplier assertions, as well as further pressures on program profitability and/or a reach-forward loss. We continue to implement mitigation plans and cost-reduction efforts to improve program profitability and address program risks.
Additional Considerations
The development and ongoing production of commercial aircraft is extremely complex, involving extensive coordination and integration with suppliers and highly-skilled labor from thousands of employees and other partners. Meeting or exceeding our performance and reliability standards, as well as those of customers and regulators, can be costly and technologically challenging. In addition, the introduction of new aircraft derivatives, such as the 787-9, 787-10 and 737 MAX, involves increased risks associated with meeting development, production and certification schedules. As a result, our ability to deliver aircraft on time, satisfy

36

Table of Contents

performance and reliability standards and achieve or maintain, as applicable, program profitability is subject to significant risks. Factors that could result in lower margins (or a material charge if an airplane program has or is determined to have reach-forward losses) include the following: changes to the program accounting quantity, customer and model mix, production costs and rates, changes to price escalation factors in aircraft purchase contracts, performance or reliability issues involving completed aircraft, capital expenditures and other costs associated with increasing or adding new production capacity, learning curve, additional change incorporation, anticipated cost reductions, flight test and certification schedules, costs, schedule and demand for derivative airplanes and status of customer claims, supplier assertions and other contractual negotiations. While we believe the cost and revenue estimates incorporated in the Condensed Consolidated Financial Statements are appropriate, the technical complexity of our airplane programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, order cancellations or other financially significant exposure.
Defense, Space & Security
Business Environment and Trends
U.S. Government Defense Environment Overview In August 2011, the Budget Control Act (The Act) reduced the United States defense top line budget by approximately $490 billion through 2021. The Act further reduced the defense top line budget by an additional $500 billion through 2021 if Congress did not enact $1.2 trillion in further budget reductions by January 15, 2012. Should Congress in future years provide funding above the yearly spending limits of The Act, sequestration will automatically take effect and cancel any excess amount above the limits. The annual spending limits of The Act will remain in place unless and until the current law is changed.
On March 1, 2013, sequestration was implemented for the U.S. government fiscal year 2013 (FY2013) and the Office of Management and Budget (OMB) issued a report to Congress listing illustrative cuts which equal a 7.8% reduction in FY2013 non-exempt defense discretionary funding and a 5.0% reduction in non-exempt nondefense discretionary funding. However, as noted in the OMB report, the effective reduction in funds would be approximately 13% for non-exempt defense programs and 9% for non-exempt nondefense programs if implemented over the seven-month period from March 1, 2013 to September 30, 2013.
On June 10, 2013, the United States Department of Defense (U.S. DoD) released its Report on the Joint Committee Sequestration for FY2013, which summarized the budgetary resources sequestered at the U.S. DoD's program, project and activity levels.
The OMB report, the U.S. DoD Report and other communications with the U.S. DoD indicate that there are likely to be reductions to our defense business. However, at this time we cannot determine how sequestration will impact specific programs and contracts at Boeing. Reductions, cancellations or delays impacting existing contracts or programs could have a material effect on our results of operations, financial position and/or cash flows. While U.S. DoD would sustain the bulk of sequestration cuts affecting the Company, civil programs and agencies could be significantly impacted as well.
BDS Realignment
Effective January 1, 2013, certain programs were realigned between BDS segments. Business segment data for 2012 has been adjusted to reflect the realignment. See Note 18.

37

Table of Contents

Operating Results
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$16,296

 

$16,425

 

$8,186

 

$8,192

Earnings from operations

$1,608

 

$1,490

 

$776

 

$748

Operating margins
9.9
%
 
9.1
%
 
9.5
%
 
9.1
%
(Dollars in millions)
June 30
2013

 
December 31
2012

Contractual backlog

$51,540

 

$55,068

Unobligated backlog
19,929

 
16,407

Revenues
BDS revenues for the six months ended June 30, 2013 decreased by $129 million compared with the same period in 2012 due to lower revenues of $274 million in the BMA segment and $32 million in the GS&S segment, partially offset by higher revenues of $177 million in the N&SS segment.
BDS revenues for the three months ended June 30, 2013 decreased by $6 million compared with the same period in 2012 due to lower revenues of $161 million in the BMA segment, offset by higher revenues of $89 million in the N&SS segment and $66 million in the GS&S segment.
Earnings From Operations
BDS operating earnings for the six and three months ended June 30, 2013 increased by $118 million and $28 million compared with the same periods in 2012 reflecting higher earnings in all three BDS segments. Operating margins increased to 9.9% and 9.5%.
Backlog
BDS total backlog was $71,469 million at June 30, 2013, largely unchanged from December 31, 2012, as CH-47 Chinook and V-22 Osprey multi-year contract orders and commercial satellite contract awards were offset by revenues recognized on contracts awarded in prior years. For further details on the changes between periods, refer to the discussions of the individual segments below.
Additional Considerations
Our BDS business includes a variety of development programs which have complex design and technical challenges. Many of these programs have cost-type contracting arrangements. In these cases, the associated financial risks are primarily in reduced fees, lower profit rates or program cancellation if cost, schedule or technical performance issues arise. Examples of these programs include Ground-based Midcourse Defense (GMD), Proprietary and Space Launch Systems programs.
Some of our development programs are contracted on a fixed-price basis. Many of these programs have highly complex designs. As technical or quality issues arise during development, we may experience schedule delays and cost impacts, which could increase our estimated cost to perform the work or reduce our estimated price, either of which could result in a material charge or otherwise adversely affect our financial condition. These programs are ongoing, and while we believe the cost and fee estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, the loss of satellite in-orbit incentive payments, or other financially significant exposure. These programs have risk for reach-forward losses if our estimated costs exceed our estimated contract revenues. Examples of significant fixed-price development programs include Airborne Early

38

Table of Contents

Warning and Control, Family of Advanced Beyond Line-of-Sight Terminals, India P-8I, Saudi Arabia F-15, USAF KC-46A Tanker, and commercial and military satellites.
Revenue and cost estimates for all significant contracts are reviewed and reassessed quarterly. Changes in these estimates could result in recognition of cumulative catch-up adjustments to the contract’s inception to date revenues, cost of sales and profit, in the period in which such changes are made. Changes in revenue and cost estimates could also result in a reach-forward loss or an adjustment to a reach-forward loss, which would be recorded immediately in earnings. For the six months ended June 30, 2013 and 2012, net favorable cumulative catch-up adjustments, including reach-forward losses, across all BDS contracts increased Earnings from operations by $164 million and $234 million. For the three months ended June 30, 2013 and 2012, net favorable cumulative catch-up adjustments, including reach-forward losses, across all BDS contracts increased Earnings from operations by $59 million and $122 million.
Boeing Military Aircraft
Operating Results
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$7,998

 

$8,272

 

$3,889

 

$4,050

Earnings from operations

$803

 

$752

 

$373

 

$353

Operating margins
10.0
%
 
9.1
%
 
9.6
%
 
8.7
%
(Dollars in millions)
June 30
2013

 
December 31
2012

Contractual backlog

$26,475

 

$29,226

Unobligated backlog
12,597

 
9,270

Revenues
BMA revenues for the six and three months ended June 30, 2013 decreased by $274 million and $161 million when compared with the same periods in 2012.
The decrease for the six-month period was primarily due to a reduction of $1,078 million related to the F-15 program and fewer deliveries of AEW&C aircraft. This reduction was partially offset by an increase of $843 million related to higher 2013 deliveries of P-8 aircraft and higher deliveries and milestone revenue related to rotorcraft programs.
The decrease for the three-month period was primarily due to a reduction of $839 million due to fewer deliveries of F-15 and AEW&C aircraft, and a change in delivery mix related to the C-17 program. This decrease was partially offset by an increase of $655 million due to higher deliveries of P-8 aircraft and higher deliveries and milestone revenue related to rotorcraft programs.

39

Table of Contents

Deliveries of units for new-build production aircraft, excluding remanufactures and modifications, were as follows:
 
Six months ended June 30
 
Three months ended June 30

2013
 
2012
 
2013
 
2012
F/A-18 Models
24
 
24
 
12
 
12
F-15E Eagle
3
 
8
 

 
3
C-17 Globemaster III
6
 
5
 
3
 
3
CH-47 Chinook
17
 
22
 
8
 
12
AH-64 Apache
20
 
3
 
5
 
3
P-8 Models
5
 
1
 
3
 
 
AEW&C

 
2
 

 
2
Total new-build production aircraft
75
 
65
 
31
 
35
Earnings From Operations
BMA operating earnings for the six and three months ended June 30, 2013 increased by $51 million and $20 million, increases of 7% and 6% compared to the same periods in 2012. The increases were primarily due to a second quarter 2012 inventory write-down related to the A160 unmanned program and higher earnings on the P-8 and rotorcraft programs reflecting higher revenues and performance. These increases were partially offset by lower earnings on the F-15 and AEW&C programs.
Backlog
BMA total backlog was $39,072 million at June 30, 2013, reflecting an increase of 1% from December 31, 2012 primarily due to CH-47 Chinook and V-22 Osprey multi-year contract orders, largely offset by revenues recognized on contracts awarded in prior years.
Additional Considerations
C-17 See the discussion of the C-17 program in Note 9 to our Condensed Consolidated Financial Statements.
KC-46A Tanker See the discussion of the KC-46A Tanker program on page 33.

40

Table of Contents

Network & Space Systems
Operating Results 
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$4,009

 

$3,832

 

$2,049

 

$1,960

Earnings from operations

$293

 

$245

 

$137

 

$136

Operating margins
7.3
%
 
6.4
%
 
6.7
%
 
6.9
%
(Dollars in millions)
June 30
2013

 
December 31
2012

Contractual backlog

$10,232

 

$10,078

Unobligated backlog
6,557

 
6,937

Revenues
N&SS revenues for the six and three months ended June 30, 2013 increased by $177 million and $89 million compared with the same periods in 2012.
The increase for the six-month period was primarily attributable to higher revenue of $256 million in our commercial satellite programs and higher revenues of $192 million on the Space Launch System program awarded in the fourth quarter of 2012. These increases were partially offset by a reduction of $132 million reflecting lower sales of Delta inventory primarily due to timing of United Launch Alliance (ULA) launches.
The increase for the three-month period was primarily attributable to higher revenue of $202 million in our commercial satellite programs and higher revenue of $97 million on the Space Launch System program, partially offset by lower revenue of $98 million reflecting lower sales of Delta inventory.
Earnings From Operations
N&SS operating earnings for the six and three months ended June 30, 2013 increased compared with the same periods in 2012 primarily due to higher revenues and mix in our commercial and civil satellite programs partially offset by charges related to an Electronic and Information Solutions program.
Operating earnings include equity earnings from the ULA and USA joint ventures of $73 million and $34 million for the six and three months ended June 30, 2013 compared to $52 million and $24 million for the same period in 2012.
Backlog
N&SS total backlog was $16,789 million at June 30, 2013, reflecting a decrease of 1% from December 31, 2012 primarily due to revenues recognized on contracts awarded in prior years, partially offset by commercial satellite contract awards.
Additional Considerations
United Launch Alliance See the discussion of Indemnifications to ULA and Financing Commitments in Notes 5, 9 and 10 of our Condensed Consolidated Financial Statements.
LightSquared, LLC See the discussion of the LightSquared, LLC receivables in Note 4 to our Condensed Consolidated Financial Statements.
Sea Launch See the discussion of the Sea Launch receivables in Note 8 to our Condensed Consolidated Financial Statements.

41

Table of Contents

Global Services & Support
Operating Results
(Dollars in millions)
Six months ended June 30
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$4,289

 

$4,321

 

$2,248

 

$2,182

Earnings from operations

$512

 

$493

 

$266

 

$259

Operating margins
11.9
%
 
11.4
%
 
11.8
%
 
11.9
%
(Dollars in millions)
June 30
2013


December 31
2012

Contractual backlog

$14,833

 

$15,764

Unobligated backlog
775

 
200

Revenues
GS&S revenues for the six months ended June 30, 2013 decreased by $32 million compared with the same period in the prior year, primarily due to lower revenues on several Integrated Logistics (IL) programs partially offset by increases on several Maintenance, Modification and Upgrade (MM&U) programs, including the C-17 Globemaster III Integrated Sustainment Program.
GS&S revenues for three months ended June 30, 2013 increased by $66 million compared with the same period in 2012 primarily due to higher revenues on several MM&U programs.
Earnings From Operations
GS&S operating earnings for the six and three months ended June 30, 2013 increased by $19 million and $7 million compared with the same periods in 2012 primarily due to higher earnings on several IL programs. The three-month period increase was partially offset by reductions in Training Systems and Government Services.
Backlog
GS&S total backlog was $15,608 million at June 30, 2013, a decrease of 2% from December 31, 2012 primarily due to revenues recognized on contracts awarded in prior years, partially offset by current year contract awards.
Boeing Capital
On January 23, 2013, Boeing Capital (BCC) terminated its debt registration statement and on February 22, 2013 BCC suspended its separate U.S. Securities and Exchange Commission reporting obligations. This change does not affect operations or customer interactions. On January 23, 2013, Boeing issued full and unconditional guarantees of all of the outstanding publicly-issued debt securities of BCC. Funding requirements will be provided to BCC through intercompany loans from Boeing and we will continue to target a BCC debt-to-equity ratio of 5.0-to-1. As described in Note 11, on May 3, 2013, Boeing issued $500 million of notes and entered into a concurrent intercompany loan with BCC on the same terms. Interest expense associated with these notes is included in Boeing Capital interest expense. Effective January 1, 2013, BCC's accounting for certain leasing transactions was aligned with Boeing. Segment information previously reported has been adjusted to reflect this change.

42

Table of Contents

Operating Results
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$209

 

$238

 

$104

 

$113

Earnings from operations

$63

 

$72

 

$19

 

$39

Operating margins
30
%
 
30
%
 
18
%
 
35
%
Revenues
BCC segment revenues consist principally of lease income from equipment under operating lease, interest income from financing receivables and notes, and other income. BCC’s revenues for the six and three months ended June 30, 2013 decreased by $29 million and $9 million compared with the same periods in 2012 primarily due to lower operating lease income and lower other income.
Earnings From Operations
BCC’s operating earnings are presented net of interest expense, recovery of losses, asset impairment expense, depreciation on leased equipment and other operating expenses. Operating earnings for the six months ended June 30, 2013 decreased by $9 million compared with the same period in 2012 primarily due to lower revenues partially offset by lower interest expense. Operating earnings for the three months ended June 30, 2013 decreased by $20 million primarily due to higher asset impairment expense.
Financial Position
The condensed balance sheet for BCC is shown below.
(Dollars in millions)
June 30
2013

 
December 31
2012

Customer financing and investment portfolio, net

$4,139

 

$4,290

Other assets, primarily cash and short-term investments
282

 
402

Total assets

$4,421

 

$4,692

 
 
 
 
Other liabilities, primarily deferred income taxes

$1,348

 

$1,429

Debt, including intercompany loans
2,560

 
2,742

Equity
513

 
521

Total liabilities and equity

$4,421

 

$4,692

 
 
 
 
Debt-to-equity ratio
5.0-to-1

 
5.3-to-1

The Customer financing portfolio and debt balances presented above as of December 31, 2012 have been revised from balances previously reported in the BCC 2012 10-K filing to reflect the alignment of BCC's accounting to the consolidated Boeing accounting for certain leasing transactions within the portfolio.
BCC’s customer financing and investment portfolio at June 30, 2013 decreased from December 31, 2012 primarily due to normal portfolio run-off and asset sales, partially offset by the origination of notes receivable. At June 30, 2013 and December 31, 2012, BCC had $222 million and $354 million of assets that were held for sale or re-lease, of which $187 million and $266 million had either executed term sheets with deposits or firm contracts to be sold or placed on lease. Additionally, aircraft subject to leases with a carrying value of approximately $34 million are scheduled to be returned off lease in the next 12 months. These aircraft are being remarketed or the leases are being extended and $11 million of these aircraft were committed at June 30, 2013.

43

Table of Contents

Bankruptcies
In 2011, American Airlines, Inc. (American Airlines) filed for Chapter 11 bankruptcy protection. American Airlines retains certain rights by operating under Chapter 11 bankruptcy protection, including the right to reject executory contracts, such as aircraft leases. American Airlines has not rejected any of the leases related to our aircraft. At June 30, 2013, American Airlines accounted for $463 million of our customer financing portfolio, of which $377 million represents collateral for $206 million of non-recourse debt. We believe that our customer financing receivables from American Airlines are sufficiently collateralized such that we do not expect to incur losses related to those receivables as a result of the bankruptcy. We continue to monitor the American Airlines bankruptcy for potential impacts on our business.
Restructurings and Restructuring Requests
From time to time, certain customers have requested a restructuring of their transactions with BCC. Since December 31, 2012, BCC has not reached agreement on any restructuring requests that would have a material effect on our earnings, cash flows and/or financial position.
Other Segment 
(Dollars in millions)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$54

 

$52

 

$27

 

$28

Loss from operations
(101
)
 
(143
)
 
(43
)
 
(64
)
Other segment losses for the six and three months ended June 30, 2013 decreased by $42 million and $21 million compared with the same periods in 2012 primarily due to lower asset impairment expense and support provided to BCC.
Liquidity and Capital Resources
Cash Flow Summary
(Dollars in millions)
Six months ended June 30
 
2013

 
2012

Net earnings

$2,194

 

$1,890

Non-cash items
954

 
1,317

Changes in working capital
843

 
(1,462
)
Net cash provided by operating activities
3,991

 
1,745

Net cash used by investing activities
(3,371
)
 
(3,588
)
Net cash used by financing activities
(2,230
)
 
(1,897
)
Effect of exchange rate changes on cash and cash equivalents
(37
)
 
(4
)
Net decrease in cash and cash equivalents
(1,647
)
 
(3,744
)
Cash and cash equivalents at beginning of year
10,341

 
10,049

Cash and cash equivalents at end of period

$8,694

 

$6,305

Operating Activities Net cash provided by operating activities was $4 billion during the six months ended June 30, 2013, an increase of $2.2 billion compared with the same period in 2012 primarily due to lower working capital growth in 2013. Our investment in gross inventories increased by $5.3 billion in the period compared with a $3.4 billion increase in the same period in 2012, driven by higher investments in commercial airplane program inventory. Inventory growth in 2013 was partially offset by advances and progress billings which increased by $4.3 billion for the period compared with an increase of $0.5 billion for the same period

44

Table of Contents

in 2012 due to payments from commercial airplane customers. Discretionary contributions to our pension plans totaled $13 million during the six months ended June 30, 2013 compared with $763 million in the same period last year.
Investing Activities Cash used by investing activities totaled $3.4 billion during the six months ended June 30, 2013 compared with $3.6 billion used during the same period in 2012, largely due to lower net contributions to investments in time deposits in the prior year partially offset by increased capital expenditures. Net contributions to investments were $2.4 billion in 2013 compared with net contributions to investments of $2.8 billion for the comparable period in 2012. In 2013, capital expenditures totaled $1 billion, compared with $0.8 billion for the same period in the prior year. We expect capital expenditures to remain higher in 2013 due to continued investment to support growth.
Financing Activities Cash used by financing activities was $2.2 billion during the six months ended June 30, 2013, compared with $1.9 billion in the same period in 2012 primarily due to share repurchases of $1 billion in 2013 partially offset by new borrowings in the current year.
On May 3, 2013, we issued notes totaling $0.5 billion to fund the BCC segment. During the six months ended June 30, 2013, we repaid $1.4 billion of debt, including repayments of $0.6 billion of debt held at BCC. During the six months ended June 30, 2012, we repaid $1.2 billion of debt. At June 30, 2013, the recorded balance of debt was $9.6 billion of which $0.9 billion was classified as short-term.
During the six months ended June 30, 2013, we repurchased 10.2 million shares at an average price of $97.82 through our open market share repurchase program. We expect repurchases to total between $1.5 and $2 billion in 2013. In addition, 0.7 million shares were transferred to us from employees for tax withholding.
Capital Resources We have substantial borrowing capacity. Any future borrowings may affect our credit ratings and are subject to various debt covenants as described below. We have a commercial paper program that continues to serve as a significant potential source of short-term liquidity. At June 30, 2013, we had no commercial paper borrowings outstanding. Currently, we have $4.6 billion of unused borrowing on revolving credit line agreements. We anticipate that these credit lines will primarily serve as backup liquidity to support our general corporate borrowing needs.
Financing commitments totaled $17.8 billion and $18.1 billion at June 30, 2013 and December 31, 2012. We anticipate that we will not be required to fund a significant portion of our financing commitments as we continue to work with third party financiers to provide alternative financing to customers. Historically, we have not been required to fund significant amounts of outstanding commitments. However, there can be no assurances that we will not be required to fund greater amounts than historically required.
In the event we require additional funding to support strategic business opportunities, commercial aircraft financing commitments, unfavorable resolution of litigation or other loss contingencies, or other business requirements, we expect to meet increased funding requirements by issuing commercial paper or term debt. We believe our ability to access external capital resources should be sufficient to satisfy existing short-term and long-term commitments and plans, and also to provide adequate financial flexibility to take advantage of potential strategic business opportunities should they arise within the next year. However, there can be no assurance of the cost or availability of future borrowings.
At June 30, 2013, we were in compliance with the covenants for our debt and credit facilities. The most restrictive covenants include a limitation on mortgage debt and sale and leaseback transactions as a percentage of consolidated net tangible assets (as defined in the credit agreements), and a limitation on consolidated debt as a percentage of total capital (as defined). When considering debt covenants, we continue to have substantial borrowing capacity.
Off-Balance Sheet Arrangements
We are a party to certain off-balance sheet arrangements including certain guarantees. For discussion of these arrangements, see Note 10 to our Condensed Consolidated Financial Statements.

45

Table of Contents

Contingent Obligations
We have significant contingent obligations that arise in the ordinary course of business, which include the following:
Legal Various legal proceedings, claims and investigations are pending against us. Legal contingencies are discussed in Note 17 to our Condensed Consolidated Financial Statements, including our contesting the default termination of the contract for A-12 aircraft and certain employment, labor and benefits litigation.
Environmental Remediation We are involved with various environmental remediation activities and have recorded a liability of $698 million at June 30, 2013. For additional information, see Note 9 to our Condensed Consolidated Financial Statements.
Income Taxes We have recorded a liability of $1,181 million at June 30, 2013 for uncertain tax positions. For further discussion of income taxes, see Note 3 to our Condensed Consolidated Financial Statements.
Non-GAAP Measures
Core Operating Earnings, Core Operating Margin and Core Earnings Per Share
Our unaudited condensed consolidated interim financial statements are prepared in accordance with accounting principles generally accepted in the United States (GAAP) which we supplement with certain non-GAAP financial information. These non-GAAP measures should not be considered in isolation or as a substitute for the related GAAP measures, and other companies may define such measures differently. We encourage investors to review our financial statements and publicly-filed reports in their entirety and not to rely on any single financial measure. Core operating earnings, core operating margin and core earnings per share exclude the impact of unallocated pension and postretirement expenses which represent costs not attributable to business segments - see Note 18 to our Condensed Consolidated Financial Statements. Management uses core operating earnings, core operating margin and core earnings per share for purposes of evaluating and forecasting underlying business performance. Management believes these core earnings measures provide investors additional insights into operational performance as unallocated pension and post-retirement costs, primarily represent costs driven by market factors and costs not allocable to U.S. government contracts.

46

Table of Contents

Reconciliation of GAAP Measures to Non-GAAP Measures
The table below reconciles the non-GAAP financial measures of core operating earnings, core operating margin and core earnings per share with the most directly comparable GAAP financial measures of earnings from operations, operating margins and diluted earnings per share.
(Dollars in millions, except per share data)
Six months ended June 30
 
Three months ended June 30

2013

 
2012

 
2013

 
2012

Revenues

$40,708

 

$39,388

 

$21,815

 

$20,005

Earnings from operations, as reported

$3,244

 

$3,107

 

$1,716

 

$1,542

Operating margins
8.0
%
 
7.9
%
 
7.9
%
 
7.7
%
 
 
 
 
 
 
 
 
Unallocated pension/postretirement expense

$651

 

$453

 

$312

 

$245

Core operating earnings (non-GAAP)

$3,895

 

$3,560

 

$2,028

 

$1,787

Core operating margins (non-GAAP)
9.6
%
 
9.0
%
 
9.3
%
 
8.9
%
 
 
 
 
 
 
 
 
Diluted earnings per share, as reported

$2.85

 

$2.49

 

$1.41

 

$1.27

Unallocated pension/postretirement expense (1)

$0.55

 

$0.39

 

$0.26

 

$0.21

Core earnings per share (non-GAAP)

$3.40

 

$2.88

 

$1.67

 

$1.48

Weighted average diluted shares (in millions)
770.1

 
760.7

 
771.8

 
762.0

(1) 
Earnings per share impact is presented net of the federal statutory rate of 35.0%.
Item 3. Quantitative and Qualitative Disclosures About Market Risk
There have been no significant changes to our market risk since December 31, 2012.
Item 4. Controls and Procedures
(a)Evaluation of Disclosure Controls and Procedures.
Our Chief Executive Officer and Chief Financial Officer have evaluated our disclosure controls and procedures as of June 30, 2013 and have concluded that these disclosure controls and procedures are effective to ensure that information required to be disclosed by us in the reports that we file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and is accumulated and communicated to our management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
(b)Changes in Internal Control Over Financial Reporting.
There were no changes that occurred during the second quarter of 2013 that have materially affected or are reasonably likely to materially affect our internal control over financial reporting.

47

Table of Contents

Part II. Other Information
Item 1. Legal Proceedings
Currently, we are involved in a number of legal proceedings. For a discussion of contingencies related to legal proceedings, see Note 17 to our Condensed Consolidated Financial Statements, which is hereby incorporated by reference.
Item 1A. Risk Factors
There have been no material changes in our risk factors from those disclosed in Part I, Item 1A. Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2012.
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds
Issuer Purchases of Equity Securities
The following table provides information about purchases we made during the quarter ended June 30, 2013 of equity securities that are registered by us pursuant to Section 12 of the Exchange Act:
(Dollars in millions, except per share data)
 
(a)
 
(b)
 
(c)
 
(d)
 
Total Number
of Shares
Purchased (1)

 
Average
Price
Paid per
Share

 
Total Number of
Shares Purchased
as Part of Publicly
Announced Plans
or Programs

 
Approximate Dollar
Value of Shares That
May Yet be Purchased
Under the Plans or
Programs (2)

4/1/2013 thru 4/30/2013
56,916

 

$85.50

 

 

$3,610

5/1/2013 thru 5/31/2013
6,872,647

 
96.88

 
6,868,263

 
2,945

6/1/2013 thru 6/30/2013
3,358,307

 
99.72

 
3,356,518

 
2,610

Total
10,287,870

 

$97.74

 
10,224,781

 
 
(1) 
We purchased an aggregate of 10,224,781 shares of our common stock in the open market pursuant to our repurchase program and 62,992 shares transferred to us from employees in satisfaction of minimum tax withholding obligations associated with the vesting of restricted stock units during the period. In addition, we purchased an aggregate of 97 shares in swap transactions.
(2) 
On October 29, 2007, the Board approved the repurchase of up to $7 billion of common stock (the Program). Unless terminated earlier by a Board resolution, the Program will expire when we have used all authorized funds for repurchase. In February 2009, repurchases were suspended and in May 2013 were resumed.
Item 3. Defaults Upon Senior Securities
Not applicable.
Item 4. Mine Safety Disclosures
Not applicable.
Item 5. Other Information
Not applicable.

48

Table of Contents

Item 6. Exhibits
10 (i)
Notice of Terms of Restricted Stock Units dated February 25, 2013.
 
 
10 (ii)
Supplemental Executive Retirement Plan for Employees of The Boeing Company, as Amended and Restated as of May 1, 2013.
 
 
12
Computation of Ratio of Earnings to Fixed Charges.
 
 
15
Letter from Independent Registered Public Accounting Firm regarding unaudited interim financial information.
 
 
31(i)
Certification of Chief Executive Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.
 
 
31(ii)
Certification of Chief Financial Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.
 
 
32(i)
Certification of Chief Executive Officer pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
 
 
32(ii)
Certification of Chief Financial Officer pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
 
 
101.INS
XBRL Instance Document.
 
 
101.SCH
XBRL Taxonomy Extension Schema Document.
 
 
101.CAL
XBRL Taxonomy Extension Calculation Linkbase Document.
 
 
101.DEF
XBRL Taxonomy Extension Definition Linkbase Document.
 
 
101.LAB
XBRL Taxonomy Extension Label Linkbase Document.
 
 
101.PRE
XBRL Taxonomy Extension Presentation Linkbase Document.
In accordance with Item 601(b)(4)(iii)(A) of Regulation S-K, copies of certain instruments defining the rights of holders of long-term debt of the Company are not filed herewith. Pursuant to this regulation, we hereby agree to furnish a copy of any such instrument to the SEC upon request.


49

Table of Contents

Signature
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
 
 
THE BOEING COMPANY
 
 
(Registrant)
 
 
 
 
 
 
 
 
 
 
 
 
July 24, 2013
 
/s/ DIANA L. SANDS
(Date)
 
Diana L. Sands
Vice President of Finance
& Corporate Controller

50